← Back
Elevator cooperative
14 JAY STREET
MANHATTAN · BIN 1001554
💬 Discuss this project
1882Year Built
8Stories
D4Building Class
C6-2AZoning
17,168 sfGross Floor Area
8Units
Rent Stabilized7 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 14 JAY STREET OWNERS CORP · 2,218 sf lot · 7.74 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof1p · 1 filing · 6 docs
Floor 67p · 3 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 212p · 4 filings · 20 docs
Floor 1
9 jobs · most recent 03/26/2024
General Wiring
FiledStatusContractorScope
03/26/2024CompleteVILLAGE ELECTL CONTRS INCGeneral Wiring
03/14/2024Permit IssuedVILLAGE ELECTL CONTRS INC1 meters, 1 new_meters
02/22/2024CompleteVILLAGE ELECTL CONTRS INC1 meters, 1 new_meters
09/21/2022CompleteMADISON ELECTRIC, INC—
09/09/2021CompleteBELMONT ELECTRICAL, INCGeneral Wiring
07/16/2021CompleteVILLAGE ELECTL CONTRS INC10 meters, 1 new_meters
04/15/2021CompleteVILLAGE ELECTL CONTRS INC8 meters
03/08/2021CompleteBOROWIDE ELECT'L CONTR'S—
07/09/2020CompleteFIVE STARS ELEC'L CONTR'GGeneral Wiring
Building Lifecycle
All (157)Filed (16)Permit Issued (17)Signed Off (11)Facade (FISP) (18)Violation (50)Inspection (9)Objection (6)Special Inspection (30)
07/02/2025
Signed off — Alteration
Installation and modification of plumbing fixtures at existing apartment on floor 002. Plumbing work. There is to be no change of use, occupancy, or egress.
M00672209-I1
07/02/2025
Signed off — Alteration
M00672208-I1
09/04/2024
Signed off — Alteration
Modification of existing sprinkler system at existing residence on floor 002. Sprinkler work. There is to be no change of use, occupancy, or egress.
M00672211-I1
05/14/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/02/2024
Signed off — Alteration
Renovation of existing apartment on floor 002. Mechanical work. There is to be no change of use, occupancy, or egress.
M00672212-I1
03/11/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Cycle 9 facade report signed — SAFE
02/14/2024
Cycle 9 facade inspection completed
11/30/2023
Signed off — Alteration
M00600237-I1
08/21/2023
Signed off — Alteration
SUPPORT SCAFFOLD WITH OUT MATERIAL HOIST:TEMPORARY INSTALLATION OF SUPPORTED PIPE SCAFFOLD AS SHOWN ON PLANS. SHALL COMPLY WITH BSA-362-44-SM, LL-33/91, CHAP 33, SECTION 33 OF 2014 NYC DOB BC & TPPN # 9/99. NO CHANGE IN EGRESS, OC
M00596261-I1
08/16/2023
Permit issued — Supported Scaffold
M00596261-I1-SF
06/09/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/01/2023
Signed off — Alteration
M00564735-I1
05/31/2023
Signed off — Alteration
Amendment to answer PL inspector's final signoff objections.
M00564716-I1
05/31/2023
Signed off — Alteration
AMENDMENT TO ADD A CLOSET DOOR TO BOILER ROOM NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00564685-I1
04/24/2023
Filed — Alteration
Amendment to answer PL inspector's final signoff objections.
M00564716-P2
04/24/2023
Special inspection requirement — Maintenance information
NABIL ISHAC
04/06/2023
Permit issued — Structural
M00600237-I1-GC-CX
03/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/27/2023
Permit issued — Plumbing
M00564716-I1-PL
02/27/2023
Filed — Alteration
Amendment to answer PL inspector's final signoff objections.
M00564716-P1
02/27/2023
Filed — Alteration
AMENDMENT TO ADD A CLOSET DOOR TO BOILER ROOM NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M00564685-P1
02/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NABIL ISHAC
02/27/2023
Special inspection requirement — Energy Code Compliance Inspections
NABIL ISHAC
02/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NABIL ISHAC
02/27/2023
Special inspection requirement — Energy Code Compliance Inspections
NABIL ISHAC
02/27/2023
Special inspection requirement — Final
NABIL ISHAC
02/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
NABIL ISHAC
02/27/2023
Special inspection requirement — Lighting in dwelling units
NABIL ISHAC
02/27/2023
Special inspection requirement — Lighting controls
NABIL ISHAC
02/27/2023
Special inspection requirement — Interior lighting power
NABIL ISHAC
02/27/2023
Special inspection requirement — Interior lighting power
NABIL ISHAC
02/27/2023
Special inspection requirement — Lighting controls
NABIL ISHAC
02/27/2023
Special inspection requirement — Lighting in dwelling units
NABIL ISHAC
02/27/2023
Special inspection requirement — Final
NABIL ISHAC
02/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
NABIL ISHAC
02/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/07/2023
Permit issued — Plumbing
M00672209-I1-PL
02/06/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/31/2023
Signed off — Alteration
M00474288-I1
01/20/2023
Filed — Alteration
Installation and modification of plumbing fixtures at existing apartment on floor 002. Plumbing work. There is to be no change of use, occupancy, or egress.
M00672209-P1
01/20/2023
Filed — Alteration
M00672208-P1
01/20/2023
Special inspection requirement — Final
MARGARET SALAMONE
01/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
01/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
MARGARET SALAMONE
01/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
01/10/2023
Special inspection requirement — Final
MARGARET SALAMONE
01/10/2023
Special inspection requirement — Fire-Resistance Rated Construction
MARGARET SALAMONE
01/05/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/15/2022
Cycle 8 facade report signed — SWARMP
10/10/2022
Cycle 8 facade report submitted
09/30/2022
Cycle 8 facade inspection completed
09/06/2022
Permit issued — Sprinklers
M00672211-I1-EW-SP
09/01/2022
Permit issued — Plumbing
M00672209-I1-PL
08/30/2022
Permit issued — General Construction
M00672208-I1-GC
05/04/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/12/2022
Permit issued — Mechanical Systems
M00672212-I1-MS
04/06/2022
Objection raised — Other
04/06/2022
Objection resolved — Addressed
Latest 60 of 157 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
14 JAY STREET OWNER7007/08/2026
AVARGA CONSTRUCTION303/22/2026
AYARGA CONSTRUCTION CORP103/22/2026
AVARGA CONST CORP.103/22/2026
W.T. GALLAGHER & ASSOC103/22/2026
RUSH PROPERTIES203/22/2026
14 JAY STREET OWNERCO C O RUSH303/21/2026
14 JAY STR203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE1203/21/2026
PROFESSIONAL DESIGN CONSULTANTS LL203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVARGA CONSTRUCTION CORPGeneral Contractor1203/21/2026
CEPRINE CONSTRUCTION INCGeneral Contractor603/21/2026
E S CONCEPT CONSTRUCTIONGeneral Contractor403/21/2026
DR CARDINAL INCGeneral Contractor303/21/2026
Z.W. PLBG & HTG CORPPlumbing207/08/2026
AVARGA CONTRACTING CORPGeneral Contractor207/08/2026
BREFFNI MECHANICAL INCGeneral Contractor203/21/2026
SUPERIOR PLUMBING & HEATINGPlumbing207/08/2026
VILLAGE ELECTL CONTRS INCElectrical203/22/2026
QMB PLUMBING & HTG INCFire Protection107/08/2026
ANESIS SERVICES CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ISHAC DESIGN ARCHITECTS P3918402/27/2023
ABS ENGINEERING, PLLC4835401/20/2023
RICHARD H. BALSER ENGINEE3028110/15/2021
FANG ARCHITECT5513102/12/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offAVARGA CONTRACTING CORP08/16/2023
DOB NOWStructuralSigned-offAVARGA CONSTRUCTION CORP04/06/2023
DOB NOWPlumbingSigned-offZ.W. PLBG & HTG CORP03/27/2023
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI02/07/2023
DOB NOWSprinklersSigned-offTHOMAS FAY09/06/2022
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI09/01/2022
DOB NOWGeneral ConstructionSigned-offDR CARDINAL INC08/30/2022
DOB NOWMechanical SystemsSigned-offBREFFNI MECHANICAL04/12/2022
DOB NOWStructuralSigned-offAVARGA CONSTRUCTION CORP03/29/2022
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC02/08/2022
DOB NOWStructuralSigned-offAVARGA CONSTRUCTION CORP11/08/2021
DOB NOWSupported ScaffoldSigned-offAVARGA CONTRACTING CORP10/04/2021
DOB NOWMechanical SystemsSigned-offE S CONCEPT CONSTRUCTION09/16/2021
DOB NOWGeneral ConstructionSigned-offE S CONCEPT CONSTRUCTION09/16/2021
DOB NOWPlumbingSigned-offZ.W. PLBG & HTG CORP09/10/2021
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC02/23/2021
DOB NOWSprinklersSigned-offQMB PLUMBING & HTG INC07/24/2020
BISOTISSUEDNEW HO XIN DEVELOPMENT INC10/19/2020
BISMHISSUEDNEW HO XIN DEVELOPMENT INC10/19/2020
BISPLISSUEDQMB PLUMBING & HEATING INC07/31/2020
BISMHISSUEDNEW HO XIN DEVELOPMENT INC07/30/2020
BISOTISSUEDNEW HO XIN DEVELOPMENT INC10/18/2019
BISOTISSUEDNEW HO XIN DEVELOPMENT INC09/19/2019
BISOTISSUEDPRATT CONSTRUCTION & REST05/21/2019
BISOTISSUEDPRATT CONSTRUCTION & REST05/17/2018
BISPLISSUEDJAG PLBG & MECH INC12/28/2017
BISOTISSUEDRIGHTWAY PLBG & HTG INC12/28/2017
BISBLISSUEDMPC PLUMBING & HEATING INC10/17/2017
BISBLISSUEDMPC PLUMBING & HEATING INC09/27/2017
BISBLISSUEDHENRY MYERS P & H, INC09/12/2017
BISOTISSUEDPRATT CONSTRUCTION & REST09/01/2017
BISPLISSUEDMPC PLUMBING & HEATING INC08/17/2017
BISPLISSUEDTRISTATE PLBG SVCS CORP07/07/2017
BISOTISSUEDCG 1982 CORP07/07/2017
BISPLISSUEDHENRY MYERS P & H, INC06/23/2017
BISPLISSUEDHENRY MYERS P & H, INC06/23/2017
BISPLISSUEDHENRY MYERS P & H, INC06/22/2017
BISPLISSUEDHUB PLUMBING&HEATING CORP06/19/2017
BISOTISSUEDPRATT CONSTRUCTION & REST04/05/2017
BISPLISSUEDM C M PLBG & HTG, INC04/03/2015
+ 27 more permits on file
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/14/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/04/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/19/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/24/2023Maintenance informationNABIL ISHACenergy_progress
02/27/2023Fire-Resistant Penetrations and JointsNABIL ISHACspecial
02/27/2023Energy Code Compliance InspectionsNABIL ISHACprogress
02/27/2023Fire-Resistant Penetrations and JointsNABIL ISHACspecial
02/27/2023Energy Code Compliance InspectionsNABIL ISHACprogress
02/27/2023FinalNABIL ISHACprogress
02/27/2023Fire-Resistance Rated ConstructionNABIL ISHACprogress
02/27/2023Lighting in dwelling unitsNABIL ISHACenergy_progress
02/27/2023Lighting controlsNABIL ISHACenergy_progress
02/27/2023Interior lighting powerNABIL ISHACenergy_progress
02/27/2023Interior lighting powerNABIL ISHACenergy_progress
02/27/2023Lighting controlsNABIL ISHACenergy_progress
02/27/2023Lighting in dwelling unitsNABIL ISHACenergy_progress
02/27/2023FinalNABIL ISHACprogress
02/27/2023Fire-Resistance Rated ConstructionNABIL ISHACprogress
01/20/2023FinalMARGARET SALAMONEprogress
01/20/2023Fire-Resistant Penetrations and JointsAlex Schwartzspecial
01/20/2023Fire-Resistance Rated ConstructionMARGARET SALAMONEprogress
01/10/2023Fire-Resistant Penetrations and JointsAlex Schwartzspecial
01/10/2023FinalMARGARET SALAMONEprogress
01/10/2023Fire-Resistance Rated ConstructionMARGARET SALAMONEprogress
02/07/2022Fire-Resistant Penetrations and JointsAlex Schwartzspecial
02/07/2022Post-installed AnchorsAlex Schwartzspecial
02/01/2022Sprinkler SystemsAlex Schwartzspecial
09/24/2021Structural Steel - WeldingBalser Richardspecial
Latest 25 of 32.
▾Documents — 568 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch14
09/03/2026M00564735-I1Request digital key ↗
09/03/2026M00564685-P1Request digital key ↗
09/03/2026M00596261-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00313865-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00474288-I1Request digital key ↗
▸Applications & Permits94
▸BISPLAN / WORK APPROVAL APPLICATION43
08/29/2020140855091Open ↗
05/26/2020140855091Open ↗
02/18/2020140855091Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION38
07/31/2020140855091Open ↗
07/30/2020140855091Open ↗
09/19/2019140766829Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWLPC Approval/Permit12
09/03/2026M00564735-I1Open ↗
09/03/2026M00564685-P1Open ↗
09/02/2026M00672212-I1Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications110
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION36
10/25/2021123137792Open ↗
10/21/2019122756428Open ↗
10/21/2019122756428Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/23/2026M00564735-I1Open ↗
09/23/2026M00564735-I1Open ↗
09/23/2026M00564735-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/05/2026M00313865-I1Open ↗
09/03/2026M00564735-I1Open ↗
09/03/2026M00564685-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
09/18/2017140695996Open ↗
09/11/2017140690385Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026M00600237-I1Open ↗
09/23/2026M00564735-I1Open ↗
09/23/2026M00564735-I1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
09/18/2017140695996Open ↗
Showing 1 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
09/18/2017140695996Open ↗
Showing 1 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
07/08/2019140855091Open ↗
08/21/2018140766829Open ↗
05/22/2018140766829Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment48
▸BISSCHEDULE B - PLUMBING18
09/02/2020140855091Open ↗
05/26/2020140855091Open ↗
05/15/2020140855091Open ↗
Showing 3 of 18 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
11/14/2017140664145Open ↗
11/09/2017140664145Open ↗
Showing 2 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
10/16/2017140690385Open ↗
10/11/2017140690385Open ↗
09/18/2017140695996Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
05/03/2018123137792Open ↗
05/03/2018123137792Open ↗
Showing 2 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection14
▸BISTenant Protection Plan and Notes6
09/25/2019140855091Open ↗
08/21/2018140766829Open ↗
09/18/2017140695996Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST5
11/03/2017121571502Open ↗
Showing 1 of 5 on file for this type
▸BISTENANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00313865-I1Open ↗
▸Environmental & Asbestos36
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
12/18/2019122756428Open ↗
11/20/2019140855091Open ↗
10/21/2019122756428Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/03/2026M00564735-I1Open ↗
09/03/2026M00564685-P1Open ↗
09/02/2026M00672212-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance56
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
10/25/2021123137792Open ↗
05/11/2020140855091Open ↗
05/22/2018123137792Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
10/25/2021123137792Open ↗
05/22/2018123137792Open ↗
02/23/2018140647405Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY14
12/24/2020140766829Open ↗
12/24/2020140855091Open ↗
03/23/2020140855091Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
09/18/2017140695996Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00564735-I1Open ↗
08/15/2026M00564685-I1Open ↗
08/13/2026M00564716-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/24/2020140766829Open ↗
12/24/2020140855091Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY19
12/24/2020140766829Open ↗
12/24/2020140855091Open ↗
03/23/2020140855091Open ↗
Showing 3 of 19 on file for this type
▸Approvals, Objections & Sign-offs66
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST25
10/25/2021123137792Open ↗
10/19/2021121571502Open ↗
12/24/2020140766829Open ↗
Showing 3 of 25 on file for this type
▸BISLANDMARKS APPROVAL21
11/20/2019140855091Open ↗
10/21/2019122756428Open ↗
07/12/2018140766829Open ↗
Showing 3 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
10/19/2021121571502Open ↗
12/24/2020140766829Open ↗
05/22/2018121571502Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLANDMARKS SIGNOFF2
12/24/2020140766829Open ↗
12/24/2020140855091Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership38
▸BISCOST AFFIDAVIT34
10/25/2021123137792Open ↗
03/23/2020140855091Open ↗
10/21/2019122756428Open ↗
Showing 3 of 34 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
12/24/2020140766829Open ↗
12/24/2020140855091Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms62
▸BISADDITIONAL INFORMATION29
09/15/2020140855091Open ↗
06/16/2020140855091Open ↗
06/16/2020140855091Open ↗
Showing 3 of 29 on file for this type
▸BISBOROUGH INTAKE FORM15
10/19/2021121571502Open ↗
12/18/2019122756428Open ↗
12/18/2019122756428Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
07/08/2019140855091Open ↗
05/21/2018140766829Open ↗
09/18/2017140695996Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET8
11/03/2017121571502Open ↗
Showing 1 of 8 on file for this type
▸Other Documents9
▸DOB NOWProof of Historic Building5
09/02/2026M00672212-I1Open ↗
09/02/2026M00672209-I1Open ↗
08/13/2026M00672208-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
11/03/2017121571502Open ↗
Showing 1 of 3 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type