← Back
Condo, residential unit in elevator building
Parkchester South Condominium
14 METROPOLITAN OVAL · BIN 2096729
💬 Discuss this project
0Year Built
—Stories
R4Building Class
R6Zoning
—Gross Floor Area
3,378Units
43 Open Violations ▸FISP: SAFE
Condo, residential unit in elevator building · Owner of record: PARKCHESTER SOUTH CONDOMINIUM ASSOC · 1.72 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PSC303/22/2026
PARKCHESTER SOUTH CONDOMINIUM1003/22/2026
ROCK GROUP NY403/21/2026
P CHESTER CONDO303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN DESIGN103/20/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIGGINING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEMX CORPGeneral Contractor407/08/2026
HEMANCHAL DEONARINEElectrical103/21/2026
Building Lifecycle
All (81)Filed (2)Permit Issued (3)Signed Off (2)Facade (FISP) (12)Violation (60)Objection (2)
06/20/2026
Violation issued (HPD, closed)
C
05/27/2026
Violation issued (HPD, closed)
C
05/27/2026
Violation issued (HPD, closed)
C
05/27/2026
Violation issued (HPD, open)
A
05/27/2026
Violation issued (HPD, open)
A
05/27/2026
Violation issued (HPD, open)
A
05/27/2026
Violation issued (HPD, closed)
B
05/27/2026
Violation issued (HPD, closed)
C
03/18/2026
Violation issued (HPD, closed)
A
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
B
03/18/2026
Violation issued (HPD, closed)
A
03/18/2026
Violation issued (HPD, closed)
C
03/18/2026
Violation issued (HPD, closed)
A
03/13/2026
Violation issued (HPD, open)
B
03/13/2026
Violation issued (HPD, open)
B
03/13/2026
Violation issued (HPD, open)
B
11/17/2025
Violation issued (HPD, closed)
I
10/29/2025
Violation issued (HPD, open)
A
10/29/2025
Violation issued (HPD, open)
A
10/29/2025
Violation issued (HPD, open)
A
10/29/2025
Violation issued (HPD, open)
B
10/29/2025
Violation issued (HPD, closed)
C
10/29/2025
Violation issued (HPD, open)
B
10/29/2025
Violation issued (HPD, open)
C
10/29/2025
Violation issued (HPD, open)
A
08/13/2025
Violation issued (HPD, closed)
A
08/13/2025
Violation issued (HPD, open)
C
08/13/2025
Violation issued (HPD, open)
B
04/16/2025
Violation issued (HPD, closed)
C
04/16/2025
Violation issued (HPD, closed)
C
04/16/2025
Violation issued (HPD, closed)
A
04/16/2025
Violation issued (HPD, open)
C
04/16/2025
Violation issued (HPD, closed)
A
04/16/2025
Violation issued (HPD, closed)
C
04/16/2025
Violation issued (HPD, closed)
C
04/15/2025
Violation issued (HPD, closed)
B
04/15/2025
Violation issued (HPD, closed)
A
04/15/2025
Violation issued (HPD, closed)
C
04/15/2025
Violation issued (HPD, closed)
C
04/15/2025
Violation issued (HPD, closed)
B
04/15/2025
Violation issued (HPD, closed)
C
02/16/2025
Violation issued (HPD, open)
B
02/03/2025
Violation issued (HPD, closed)
A
01/26/2025
Violation issued (HPD, closed)
C
01/26/2025
Violation issued (HPD, closed)
C
01/26/2025
Violation issued (HPD, closed)
C
09/06/2024
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS, SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
X00966878-I1
09/06/2024
Violation issued (HPD, open)
C
09/06/2024
Violation issued (HPD, closed)
B
09/06/2024
Violation issued (HPD, closed)
B
09/06/2024
Violation issued (HPD, closed)
B
03/18/2024
Violation issued (HPD, closed)
C
03/18/2024
Violation issued (HPD, open)
C
02/12/2024
Cycle 9 facade report submitted
02/12/2024
Cycle 9 facade report signed — SAFE
01/17/2024
Cycle 9 facade inspection completed
01/09/2024
Permit issued — Suspended Scaffold
X00966878-I1-SC
01/09/2024
Objection resolved — Addressed
01/08/2024
Objection raised — Other
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM01/09/2024
DOB NOWSidewalk ShedSigned-offLEMX CORP12/18/2020
DOB NOWSidewalk ShedSigned-offLEMX CORP03/23/2020
BISOTISSUEDTWO-TONE CONTRACTING CORP.07/21/2020
BISOTISSUEDVINCO BUILDERS LLC01/25/2017
BISOTISSUEDHOBO CONSTRUCTION CO02/03/2016
BISEQISSUEDROCK GROUP NY CORP07/31/2015
BISOTISSUEDHOBO CONSTRUCTION CO07/09/2015
BISPLISSUEDTHE RIGHT CONNECTION P&H07/24/2002
BISEQRE-ISSUEDSPRING SCAFFOLDING04/16/2002
BISOTISSUEDPPC CONSTRUCTION LLC07/24/2001
BISOTISSUEDPPC CONSTRUCTION LLC07/17/2000
BISOTISSUEDPPC CONSTRUCTION LLC05/09/2000
BISPLRE-ISSUEDBLUEPRINT PLG CORP05/09/2000
1 project · most recent 03/23/2020
FiledStatusContractorScope
03/23/2020CompleteELPO ELECTRICAL CONTG INC—
Nothing on file for this building.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00336048-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/21/2026X00966878-I1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION17
07/15/2020220726953Open ↗
06/19/2020220726953Open ↗
06/17/2020220726953Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION5
07/21/2020220726953Open ↗
01/26/2017220537765Open ↗
02/16/2016220447933Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/08/2020220726953Open ↗
▸Seals & Professional Certifications15
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
02/25/2020220726953Open ↗
07/16/2018220471601Open ↗
05/24/2018220471601Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/24/2018220471601Open ↗
06/22/2016220537765Open ↗
08/01/2015220471601Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/24/2018220471601Open ↗
06/22/2016220537765Open ↗
08/01/2015220471601Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/26/2026X00336048-I1Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
02/25/2020220726953Open ↗
06/22/2016220537765Open ↗
06/22/2016220537765Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00336048-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/25/2020220726953Open ↗
01/26/2017220537765Open ↗
01/05/2017220537765Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
02/25/2020220726953Open ↗
02/13/2018220537765Open ↗
01/23/2017220447933Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
05/05/2021220726953Open ↗
02/13/2018220537765Open ↗
01/23/2017220447933Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/05/2021220726953Open ↗
05/12/2020220726953Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/05/2021220726953Open ↗
07/21/2020220726953Open ↗
07/08/2020220726953Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
08/10/2021220726953Open ↗
05/29/2018220537765Open ↗
02/13/2018220537765Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/25/2020220726953Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
05/05/2021220726953Open ↗
07/08/2020220726953Open ↗
02/25/2020220726953Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION5
02/25/2020220726953Open ↗
05/24/2018220471601Open ↗
01/05/2017220537765Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
02/25/2020220726953Open ↗
06/22/2016220537765Open ↗
08/01/2015220471601Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
07/16/2018220471601Open ↗
02/13/2018220537765Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026X00966878-I1Open ↗