← Back
Converted dwellings or rooming house
14 MT HOPE PLACE
BRONX · BIN 2008220
💬 Discuss this project
1910Year Built
4Stories
C5Building Class
R8Zoning
16,685 sfGross Floor Area
54Units
Rent Stabilized115 Open Violations ▸
Converted dwellings or rooming house · Owner of record: 81W LLC · 6,250 sf lot · 2.67 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction40p · 5 filings · 20 docs
Floor 5Under Construction1p · 1 filing · 4 docs
Floor 4Under Construction36p · 5 filings · 20 docs
Floor 3Under Construction35p · 5 filings · 20 docs
Floor 2Under Construction35p · 5 filings · 20 docs
Floor 1Under Construction37p · 5 filings · 20 docs
CellarUnder Construction39p · 4 filings · 20 docs
BasementUnder Construction17p · 1 filing · 20 docs
Sub-BasementUnder Construction19p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J N H CONSTRUCTION703/22/2026
81W LLC103/22/2026
14-16 MT HOPE PLACE303/21/2026
BRONX MOUNT HOPE LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/31/2023$4.0M—— → —$240/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC205/29/2026
GEORGE E. BERGER & ASSOC.603/14/2025
ASHRAF CORP103/29/2024
MOTTOLA RINI ENGINEERS303/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASSOCIATES1803/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MLA CONSTRUCTION INCGeneral Contractor1307/08/2026
J.N.H. CONSTRUCTION CORPGeneral Contractor603/21/2026
TOPLINE NYC INCGeneral Contractor507/08/2026
MOHAMMED M HOSSAINGeneral Contractor203/21/2026
TMS PLBG & HEATING CORPPlumbing207/08/2026
F.S. WORKS INCFire Protection107/08/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILTIADIS LEPTOURGOS, PE508503/14/2025
MOTTOLA RINI ENGINEERS, P3251203/07/2024
Building Lifecycle
All (155)Filed (12)Permit Issued (19)Violation (60)Inspection (5)Objection (30)Special Inspection (29)
06/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/29/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01407714-I1
05/29/2026
Permit issued — Supported Scaffold
X01407714-I1-SF
04/30/2026
Permit issued — Plumbing
X01016591-I1-PL
04/28/2026
Permit issued — General Construction
X01110331-I1-GC
04/28/2026
Permit issued — Construction Fence
X01110331-S1-FN
04/28/2026
Permit issued — General Construction
X00969989-I1-GC
04/23/2026
Permit issued — Mechanical Systems
X01006316-I1-MS
04/09/2026
Permit issued — Sprinklers
X01005847-I1-EW-SP
04/07/2026
Permit issued — Plumbing
X01016591-I1-PL
12/05/2025
Permit issued — Construction Fence
X01110331-S1-FN
12/05/2025
Permit issued — Sidewalk Shed
X01159200-I1-SH
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/06/2025
Permit issued — General Construction
X01110331-I1-GC
10/31/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/30/2025
Permit issued — General Construction
X00969989-I1-GC
10/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/24/2025
Special inspection requirement — Lighting in dwelling units
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Fenestration air leakage
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Air barrier - visual inspection
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Interior lighting power
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Lighting controls
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Fenestration areas
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Insulation placement and R values
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
03/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Miltiadis Leptourgos
03/14/2025
Filed — Alteration CO
IT IS PROPOSED TO RENOVATE THE EXISTING BUILDING, RELOCATE COMMUNITY KITCHEN & ADD BATHROOM ON EACH FL & ELIMINATE THE SUPERINTENDENTS APARTMENT. GENERAL CONSTRUCTION, PLUMBING, MECHANICAL & SPRINKLER WORK TO BE FILED SEPARATELY. SEE CONH DATED 7/10/202
X01110331-P1
03/13/2025
Special inspection requirement — Air barrier - visual inspection
Miltiadis Leptourgos
03/13/2025
Special inspection requirement — Insulation placement and R values
Miltiadis Leptourgos
03/13/2025
Special inspection requirement — Lighting controls
Miltiadis Leptourgos
03/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
03/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Miltiadis Leptourgos
03/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
Miltiadis Leptourgos
03/13/2025
Special inspection requirement — Fenestration areas
Miltiadis Leptourgos
03/13/2025
Special inspection requirement — Interior lighting power
Miltiadis Leptourgos
03/13/2025
Special inspection requirement — Lighting in dwelling units
Miltiadis Leptourgos
03/13/2025
Special inspection requirement — Fenestration air leakage
Miltiadis Leptourgos
03/13/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Miltiadis Leptourgos
02/26/2025
Permit issued — General Construction
X01110331-I1-GC
01/31/2025
Objection raised — Other
01/31/2025
Objection resolved — Addressed
01/30/2025
Objection resolved — Addressed
01/30/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/27/2025
Permit issued — General Construction
X00969989-I1-GC
12/30/2024
Permit issued — Sidewalk Shed
X01159200-I1-SH
12/26/2024
Filed — Alteration
X01159200-I1
12/16/2024
Objection raised — Other
12/16/2024
Objection resolved — Addressed
12/11/2024
Objection resolved — Addressed
12/11/2024
Objection resolved — Addressed
12/11/2024
Objection resolved — Addressed
12/11/2024
Objection resolved — Addressed
12/10/2024
Permit issued — Construction Fence
X01110331-S1-FN
12/02/2024
Filed — Alteration CO
IT IS PROPOSED TO RENOVATE THE EXISTING BUILDING, RELOCATE COMMUNITY KITCHEN & ADD BATHROOM ON EACH FL & ELIMINATE THE SUPERINTENDENTS APARTMENT. GENERAL CONSTRUCTION, PLUMBING, MECHANICAL & SPRINKLER WORK TO BE FILED SEPARATELY. SEE CONH DATED 7/10/202
X01110331-S1
11/14/2024
Objection resolved — Addressed
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedTOPLINE NYC INC05/29/2026
DOB NOWPlumbingPermit IssuedTMS PLBG & HEATING CORP04/30/2026
DOB NOWGeneral ConstructionPermit IssuedMLA CONSTRUCTION INC04/28/2026
DOB NOWConstruction FencePermit IssuedMLA CONSTRUCTION INC04/28/2026
DOB NOWGeneral ConstructionPermit IssuedMLA CONSTRUCTION INC04/28/2026
DOB NOWMechanical SystemsPermit IssuedMLA CONSTRUCTION INC04/23/2026
DOB NOWSprinklersPermit IssuedF.S. WORKS INC04/09/2026
DOB NOWPlumbingPermit IssuedTMS PLBG & HEATING CORP04/07/2026
DOB NOWConstruction FencePermit IssuedMLA CONSTRUCTION INC12/05/2025
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC12/05/2025
DOB NOWGeneral ConstructionPermit IssuedMLA CONSTRUCTION INC11/06/2025
DOB NOWGeneral ConstructionPermit IssuedMLA CONSTRUCTION INC10/30/2025
DOB NOWGeneral ConstructionPermit IssuedMLA CONSTRUCTION INC02/26/2025
DOB NOWGeneral ConstructionPermit IssuedMLA CONSTRUCTION INC01/27/2025
DOB NOWSidewalk ShedPermit IssuedTOPLINE NYC INC12/30/2024
DOB NOWConstruction FencePermit IssuedMLA CONSTRUCTION INC12/10/2024
DOB NOWSupported ScaffoldPermit IssuedJ.N.H. CONSTRUCTION CORP03/29/2024
DOB NOWSidewalk ShedPermit IssuedJ.N.H. CONSTRUCTION CORP03/29/2024
DOB NOWGeneral ConstructionPermit IssuedMLA CONSTRUCTION INC01/24/2024
BISPLISSUEDDMT PLUMBING & HEATING CORP.12/08/2016
BISBLISSUEDDMT PLUMBING&HEATING CORP12/08/2016
BISBLISSUEDDMT PLUMBING&HEATING CORP11/23/2015
BISPLRE-ISSUEDDMT PLUMBING & HEATING CORP.11/23/2015
BISOTISSUED14-16 MT. HOPE PLACE LLC.04/21/2003
BISOTISSUEDMT. HOPE RESIDENCE LLC06/17/2002
1 project · most recent 03/07/2024
FiledStatusContractorScope
03/07/2024Permit IssuedF.S. WORKS INC207 heads
2 projects · most recent 12/31/2024
General Wiring
FiledStatusContractorScope
12/31/2024Permit IssuedRICHARD NEU—
11/30/2023Permit IssuedHV ELECTRIC CORPGeneral Wiring
1 project · most recent 05/29/2026
Scaffold
FiledStatusContractorScope
05/29/2026Permit IssuedTOPLINE NYC INCScaffold
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
03/24/2025Lighting in dwelling unitsMiltiadis Leptourgosenergy_progress
03/24/2025Fenestration air leakageMiltiadis Leptourgosenergy_progress
03/24/2025Air barrier - visual inspectionMiltiadis Leptourgosenergy_progress
03/24/2025Interior lighting powerMiltiadis Leptourgosenergy_progress
03/24/2025Lighting controlsMiltiadis Leptourgosenergy_progress
03/24/2025Fenestration areasMiltiadis Leptourgosenergy_progress
03/24/2025Insulation placement and R valuesMiltiadis Leptourgosenergy_progress
03/24/2025Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
03/24/2025Fire-Resistance Rated ConstructionMiltiadis Leptourgosprogress
03/24/2025Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
03/24/2025Fenestration and door U-factor and product ratingsMiltiadis Leptourgosenergy_progress
03/13/2025Air barrier - visual inspectionMiltiadis Leptourgosenergy_progress
03/13/2025Insulation placement and R valuesMiltiadis Leptourgosenergy_progress
03/13/2025Lighting controlsMiltiadis Leptourgosenergy_progress
03/13/2025Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
03/13/2025Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
03/13/2025Fire-Resistance Rated ConstructionMiltiadis Leptourgosprogress
03/13/2025Fenestration areasMiltiadis Leptourgosenergy_progress
03/13/2025Interior lighting powerMiltiadis Leptourgosenergy_progress
03/13/2025Lighting in dwelling unitsMiltiadis Leptourgosenergy_progress
03/13/2025Fenestration air leakageMiltiadis Leptourgosenergy_progress
03/13/2025Fenestration and door U-factor and product ratingsMiltiadis Leptourgosenergy_progress
04/23/2024Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
04/23/2024Energy Code Compliance InspectionsMiltiadis Leptourgosprogress
04/23/2024FinalMiltiadis Leptourgosprogress
Latest 25 of 29.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/21/2026X01006316-I1Request digital key ↗
08/21/2026X01005847-I1Request digital key ↗
08/21/2026X01016591-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits8
▸BISWORK PERMIT APPLICATION6
12/12/2016240123772Open ↗
12/12/2016240123772Open ↗
12/12/2016240123772Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
11/18/2015240123772Open ↗
02/29/2012220171141Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026X01110331-I1Open ↗
08/13/2026X01110331-P1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/21/2026X01016591-I1Open ↗
08/21/2026X00969989-P2Open ↗
08/21/2026X00969989-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026X00969989-P1Open ↗
09/01/2026X00969989-P1Open ↗
08/25/2026X01110331-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026X00969989-P1Open ↗
08/25/2026X01110331-P1Open ↗
08/25/2026X00969989-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/18/2015240123772Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/18/2015240123772Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/18/2015240123772Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
11/18/2015240123772Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/18/2015240123772Open ↗
▸Safety & Tenant Protection16
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist12
08/16/2026X01407714-I1Open ↗
08/13/2026X00969989-P1Open ↗
08/13/2026X00969989-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWStreet Tree Checklist2
08/13/2026X01110331-I1Open ↗
08/13/2026X01110331-P1Open ↗
▸BISSTREET TREE CHECKLIST1
02/29/2012220171141Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
11/18/2015240123772Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026X01016591-I1Open ↗
08/21/2026X00969989-I1Open ↗
08/21/2026X00969989-P2Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/18/2015240123772Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/18/2015240123772Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/18/2015240123772Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/18/2015240123772Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSCHEDULE A - OCCUPANCY / USE1
02/29/2012220171141Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/29/2012220171141Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/18/2015240123772Open ↗
02/29/2012220171141Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
03/08/2017240123772Open ↗
11/16/2016240123772Open ↗
▸BISEFILING COVER SHEET1
02/29/2012220171141Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/18/2015240123772Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/20/2026X01110331-P1Open ↗
08/20/2026X01110331-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/18/2015240123772Open ↗
▸BISPLOT DIAGRAM1
02/29/2012220171141Open ↗