14 ROCHELLE PLACE
STATEN ISLAND · Great Kills-Eltingville · BIN 5075120
💬 Discuss this project
1983Year Built
2Stories
B2Building Class
R3AZoning
—Gross Floor Area
2Units
Two family frame · 0.53 FAR built · Flood zone X
Locations of Work
Electrical
Roof4p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/08/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/08/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/30/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01382803-I1
04/17/2026
Permit issued — Solar
S01382803-I1-SL
04/08/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01382803-I1
04/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/08/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/03/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/17/2026
BISOTISSUEDSUNRUN INSTALLATION SVC01/29/2019
2 projects · most recent 04/08/2026
FiledStatusContractorScope
04/08/2026CompleteSUNRUN SOLAR ELECTL CORP—
01/29/2019CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/08/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/08/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/03/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/03/2026Energy Code Compliance InspectionsWalid Abdullaprogress
04/03/2026FinalWalid Abdullaprogress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026S01382803-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/25/2019540160902Open ↗
▸BISWORK PERMIT APPLICATION1
01/25/2019540160902Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S01382803-I1Open ↗
08/25/2026S01382803-I1Open ↗
08/25/2026S01382803-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S01382803-I1Open ↗
08/25/2026S01382803-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/25/2019540160902Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/25/2019540160902Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/25/2019540160902Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026S01382803-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
01/25/2019540160902Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/25/2019540160902Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026S01382803-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/02/2019540160902Open ↗
01/25/2019540160902Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/02/2019540160902Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
04/02/2019540160902Open ↗
▸BISNYCECC ANALYSIS1
01/25/2019540160902Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
01/25/2019540160902Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/25/2019540160902Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/02/2019540160902Open ↗
01/25/2019540160902Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/02/2019540160902Open ↗
01/25/2019540160902Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
04/02/2019540160902Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/02/2019540160902Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026S01382803-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/02/2019540160902Open ↗
01/25/2019540160902Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/25/2019540160902Open ↗