← Back
Office with commercial, 1-6 stories
14 SLOSSON TERRACE
STATEN ISLAND · BIN 5106474
💬 Discuss this project
1951Year Built
2Stories
O5Building Class
C4-2Zoning
15,370 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 120 BAY STREET REALTY, LLC C/O GRYMES HILL ROAD · 15,800 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 5 docs
Floor 26p · 2 filings · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HANCO PROPERTY MANGEMENT COMPANY304/09/2026
120 BAY STREET REALT HANC203/22/2026
DEPT. OF WELL FARE 098103/22/2026
120 BAY STREET REALTY803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC810/20/2025
PERMANENT ENGINEERING P.C.109/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SEAMENS SOCIETY FOR CHILDREN F403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAISE THE ROOF GC INCGeneral Contractor407/08/2026
SCARAN OIL SERVICE INCGeneral Contractor104/09/2026
V & M DRAIN CLEANING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216810/20/2025
RELIANCE ENGINEERING, P.C322109/22/2025
Building Lifecycle
All (66)Filed (9)Permit Issued (4)Signed Off (3)Violation (11)Inspection (7)Objection (2)Special Inspection (30)
03/11/2026
Signed off — Alteration
S01284591-I1
03/03/2026
Signed off — Alteration
INSTALLATION OF 3- HVAC UNITS AND AN ERV SYSTEM FOR THE 2ND FLOOR.
S00956195-I1
10/23/2025
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
10/23/2025
Special inspection requirement — Subgrade Inspections
Steven Savino
10/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
10/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
10/23/2025
Special inspection requirement — Air barrier - visual inspection
Steven Savino
10/23/2025
Special inspection requirement — Interior lighting power
Steven Savino
10/23/2025
Special inspection requirement — Fenestration air leakage
Steven Savino
10/23/2025
Special inspection requirement — Fenestration areas
Steven Savino
10/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
10/23/2025
Special inspection requirement — Lighting controls
Steven Savino
10/23/2025
Special inspection requirement — Insulation placement and R values
Steven Savino
10/22/2025
Permit issued — Mechanical Systems
S01284591-I1-MS
10/22/2025
Objection resolved — Addressed
10/20/2025
Filed — Alteration
INSTALLATION OF 3- HVAC UNITS AND AN ERV SYSTEM FOR THE 2ND FLOOR.
S00956195-P1
10/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
10/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
10/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
10/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
10/20/2025
Special inspection requirement — Final
Steven Savino
10/20/2025
Special inspection requirement — Mechanical Systems
Steven Savino
09/22/2025
Filed — Alteration
S01284591-I1
09/22/2025
Objection raised — Scope
09/11/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF NON-BEARING PARTITIONS, CEILING, FLOORING, DOORS FOR THE PROPOSED PER-SCHOOL FACILITY ON THE SECOND FLOOR AND FILE FOR NEW CERTIFICATE OF OCCUPANCY.
S00664277-P4
09/09/2025
Special inspection requirement — Mechanical Systems
Ralph Giorgio
09/09/2025
Special inspection requirement — Final
Ralph Giorgio
09/05/2025
Special inspection requirement — Insulation placement and R values
09/05/2025
Special inspection requirement — Interior lighting power
Steven Savino
09/05/2025
Special inspection requirement — Fenestration areas
09/05/2025
Special inspection requirement — Fenestration air leakage
09/05/2025
Special inspection requirement — Lighting controls
Steven Savino
09/05/2025
Special inspection requirement — Air barrier - visual inspection
09/05/2025
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
09/05/2025
Special inspection requirement — Subgrade Inspections
Steven Savino
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
08/14/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/03/2025
Violation issued (FDNY_ORDER, closed)
04/03/2025
Violation issued (FDNY_NOV, closed)
11/19/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF NON-BEARING PARTITIONS, CEILING, FLOORING, DOORS FOR THE PROPOSED PER-SCHOOL FACILITY ON THE SECOND FLOOR AND FILE FOR NEW CERTIFICATE OF OCCUPANCY.
S00664277-P3
11/08/2023
Permit issued — Mechanical Systems
S00956195-I1-MS
11/02/2023
Filed — Alteration
INSTALLATION OF 3- HVAC UNITS AND AN ERV SYSTEM FOR THE 2ND FLOOR.
S00956195-I1
11/02/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF NON-BEARING PARTITIONS, CEILING, FLOORING, DOORS FOR THE PROPOSED PER-SCHOOL FACILITY ON THE SECOND FLOOR AND FILE FOR NEW CERTIFICATE OF OCCUPANCY.
S00664277-P2
10/27/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/05/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF NON-BEARING PARTITIONS, CEILING, FLOORING, DOORS FOR THE PROPOSED PER-SCHOOL FACILITY ON THE SECOND FLOOR AND FILE FOR NEW CERTIFICATE OF OCCUPANCY.
S00664277-P1
08/03/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/28/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/18/2023
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING ON THE SECOND FLOOR FOR THE PROPOSED DAY CARE.
S00756930-I1
04/14/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2023
Permit issued — Plumbing
S00756930-I1-PL
03/10/2023
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING ON THE SECOND FLOOR FOR THE PROPOSED DAY CARE.
S00756930-I1
02/21/2023
Permit issued — General Construction
S00664277-I1-GC
06/22/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF NON-BEARING PARTITIONS, CEILING, FLOORING, DOORS FOR THE PROPOSED PER-SCHOOL FACILITY ON THE SECOND FLOOR AND FILE FOR NEW CERTIFICATE OF OCCUPANCY.
S00664277-I1
09/03/2021
Violation issued (ECB, closed)
Boilers
08/18/2021
Violation issued (ECB, closed)
Boilers
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSCARAN OIL SERVICE INC10/22/2025
DOB NOWMechanical SystemsSigned-offRAISE THE ROOF GC INC11/08/2023
DOB NOWPlumbingSigned-offV & M DRAIN CLEANING INC03/11/2023
DOB NOWGeneral ConstructionPermit IssuedRAISE THE ROOF GC INC02/21/2023
BISOTISSUEDRAISE THE ROOF GC INC01/20/2023
BISOTISSUEDRAISE THE ROOF GC INC01/17/2023
BISOTISSUEDRAISE THE ROOF GC INC06/07/2022
BISOTISSUEDRAISE THE ROOF GC INC05/12/2022
BISOTISSUEDJVN RESTORATION ENVIRONMENTAL10/07/2011
BISMHISSUEDSCARAN PLUMBING INC12/19/1997
2 projects · most recent 10/10/2022
General Wiring
FiledStatusContractorScope
10/10/2022CompleteALLBRIGHT ELECTRIC, INC—
09/26/2022CompleteFICHERA ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/14/2025Fail-Final CND-Occupancy InspectionFailView ↗
10/27/2023Fail-Final CND-Occupancy InspectionFailView ↗
08/03/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/28/2023Fail-Final CND-Occupancy InspectionFailView ↗
04/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
10/23/2025Concrete - Cast-In-PlaceSteven Savinospecial
10/23/2025Fire-Resistant Penetrations and JointsSteven Savinospecial
10/23/2025Subgrade InspectionsSteven Savinospecial
10/23/2025Fire-Resistance Rated ConstructionSteven Savinoprogress
10/23/2025Energy Code Compliance InspectionsSteven Savinoprogress
10/23/2025Air barrier - visual inspectionSteven Savinoenergy_progress
10/23/2025Interior lighting powerSteven Savinoenergy_progress
10/23/2025Fenestration air leakageSteven Savinoenergy_progress
10/23/2025Fenestration areasSteven Savinoenergy_progress
10/23/2025Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
10/23/2025Lighting controlsSteven Savinoenergy_progress
10/23/2025Insulation placement and R valuesSteven Savinoenergy_progress
10/20/2025HVAC-R and service water heating equipmentSteven Savinoenergy_progress
10/20/2025HVAC-R and service water heating system controlsSteven Savinoenergy_progress
10/20/2025HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
10/20/2025Energy Code Compliance InspectionsSteven Savinoprogress
10/20/2025FinalSteven Savinoprogress
10/20/2025Mechanical SystemsSteven Savinospecial
09/09/2025Mechanical SystemsRalph Giorgiospecial
09/09/2025FinalRalph Giorgioprogress
09/05/2025Insulation placement and R values—energy_progress
09/05/2025Interior lighting powerSteven Savinoenergy_progress
09/05/2025Fenestration areas—energy_progress
09/05/2025Fenestration air leakage—energy_progress
09/05/2025Lighting controlsSteven Savinoenergy_progress
Latest 25 of 58.
▾Documents — 118 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026S00756930-I1Request digital key ↗
08/18/2026S00664277-P4Request digital key ↗
08/18/2026S00664277-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION8
05/22/2023520104440Open ↗
05/22/2023520123367Open ↗
04/24/2022520123367Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
01/20/2023520123367Open ↗
06/07/2022520104440Open ↗
05/12/2022520123367Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00664277-I1Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature25
09/23/2026S00664277-P1Open ↗
09/23/2026S00664277-P1Open ↗
09/02/2026S00664277-P2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026S00664277-P1Open ↗
09/23/2026S00664277-P1Open ↗
09/02/2026S00664277-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/18/2026S00664277-P4Open ↗
08/18/2026S00664277-P2Open ↗
08/18/2026S00664277-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/12/2013520123367Open ↗
06/26/2012520104440Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/06/2011520080199Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/06/2011520080199Open ↗
▸Safety & Tenant Protection4
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
05/04/2022520123367Open ↗
05/04/2022520104440Open ↗
▸BISSTREET TREE CHECKLIST2
06/26/2012520104440Open ↗
10/06/2011520080199Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/18/2026S00664277-P3Open ↗
08/18/2026S00664277-P2Open ↗
08/18/2026S00664277-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
07/20/2012520104440Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/06/2011520080199Open ↗
▸Inspections & Test Reports12
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
05/04/2022520104440Open ↗
05/04/2022520123367Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION2
05/04/2022520104440Open ↗
05/04/2022520123367Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION2
05/04/2022520104440Open ↗
05/04/2022520123367Open ↗
▸BISMASONRY2
05/04/2022520104440Open ↗
05/04/2022520123367Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/04/2022520104440Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
05/04/2022520104440Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/06/2022520104440Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
05/04/2022520104440Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS2
02/21/2013520123367Open ↗
06/26/2012520104440Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
10/17/2012520104440Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/20/2011520080199Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/17/2012520104440Open ↗
12/20/2011520080199Open ↗
10/06/2011520080199Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION3
07/28/2023520123367Open ↗
07/28/2023520104440Open ↗
10/06/2011520080199Open ↗
▸BISEFILING COVER SHEET3
02/21/2013520123367Open ↗
06/26/2012520104440Open ↗
10/06/2011520080199Open ↗
▸BISBOROUGH INTAKE FORM1
01/20/2023520123367Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial5
08/13/2026S00664277-P2Open ↗
08/13/2026S00664277-P1Open ↗
08/13/2026S00664277-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/18/2026S00664277-P4Open ↗
08/18/2026S00664277-P3Open ↗
08/18/2026S00664277-P2Open ↗
Showing 3 of 5 on file for this type