← Back
Elevator apt, semi-fireproof without stores
14 WEST 107 STREET
MANHATTAN · Upper West Side-Manhattan Valley · BIN 1055663
💬 Discuss this project
1910Year Built
6Stories
D1Building Class
R8Zoning
68,200 sfGross Floor Area
89Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: WEST 107TH STREET ASSOCIATE · 12,110 sf lot · 5.63 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES NY807/08/2026
SHP MANAGEMENT704/21/2026
WEST 107TH STREET ASSOCIATE903/22/2026
METRO MANAGEMENT DEVE103/22/2026
METRO MGMT DEVELOPMENT503/22/2026
WEST 107 ST ASSOCIATE503/22/2026
METRO MGM'T DEVELOP103/22/2026
WEST 107 ST.ASSOCIATES103/22/2026
W 107 ST ASSOCIATES103/22/2026
WEST 107 PARTNERS1003/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.404/13/2026
ASHRAF CORP111/16/2023
PVE ENGINEERING111/03/2023
ENTHINK ENGINEERS LLC101/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING303/21/2026
NORTHEAST EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK ENTERPRISES NY INCGeneral Contractor603/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
MAC DESIGN CORPGeneral Contractor303/21/2026
TRISTAR PLBG & HTG INCPlumbing207/08/2026
TOP TIER ELECTRIC INCElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
PARK CONTRACTING GROUPGeneral Contractor107/08/2026
GREGORY PAPANTONIOUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851404/13/2026
PARTRIDGE VENTURE ENGINEE7690111/03/2023
Building Lifecycle
All (117)Filed (7)Permit Issued (7)Signed Off (2)Facade (FISP) (12)Violation (60)Inspection (6)Special Inspection (23)
04/14/2026
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
04/14/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
04/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
04/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
04/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
04/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
04/13/2026
Filed — Alteration
REPLACE DOMESTIC HOT WATER BOILER WITH GAS FIRED WATER HEATER. GAS CONNECTIONS TO REPLACEMENT GAS SPACE HEATING BOILERS AND WATER HEATER. INSTALL SPECIAL GAS VENT FROM CELLAR TO ROOF.
M01250612-P2
04/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
04/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
04/10/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
04/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
04/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
04/10/2026
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
04/08/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2026
Filed — Alteration
REPLACE DOMESTIC HOT WATER BOILER WITH GAS FIRED WATER HEATER. GAS CONNECTIONS TO REPLACEMENT GAS SPACE HEATING BOILERS AND WATER HEATER. INSTALL SPECIAL GAS VENT FROM CELLAR TO ROOF.
M01250612-P1
01/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
01/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
01/21/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
01/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
01/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
01/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/07/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/11/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/01/2025
Permit issued — Plumbing
M01250612-S1-PL
07/31/2025
Permit issued — Boiler Equipment
M01250612-I1-BE
07/29/2025
Filed — Alteration
REPLACE DOMESTIC HOT WATER BOILER WITH GAS FIRED WATER HEATER. GAS CONNECTIONS TO REPLACEMENT GAS SPACE HEATING BOILERS AND WATER HEATER. INSTALL SPECIAL GAS VENT FROM CELLAR TO ROOF.
M01250612-S1
07/29/2025
Filed — Alteration
REPLACE DOMESTIC HOT WATER BOILER WITH GAS FIRED WATER HEATER. GAS CONNECTIONS TO REPLACEMENT GAS SPACE HEATING BOILERS AND WATER HEATER. INSTALL SPECIAL GAS VENT FROM CELLAR TO ROOF.
M01250612-I1
07/28/2025
Permit issued — Sidewalk Shed
M00962285-I1-SH
05/10/2025
Violation issued (HPD, closed)
C
04/24/2025
Violation issued (HPD, closed)
C
04/24/2025
Violation issued (HPD, open)
C
11/14/2024
Permit issued — Sidewalk Shed
M00962285-I1-SH
10/17/2024
Violation issued (HPD, closed)
A
10/17/2024
Violation issued (HPD, closed)
C
10/17/2024
Violation issued (HPD, closed)
A
09/27/2024
Cycle 9 facade report signed — SAFE
07/22/2024
Cycle 9 facade inspection completed
07/13/2024
Violation issued (HPD, closed)
C
04/08/2024
Violation issued (ECB, closed)
Elevators
03/13/2024
Signed off — Alteration
EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00946595-I1
02/21/2024
Cycle 9 facade report submitted
11/28/2023
Permit issued — General Construction
M00946595-I1-GC
11/17/2023
Permit issued — Sidewalk Shed
M00962285-I1-SH
11/16/2023
Filed — Alteration
M00962285-I1
11/03/2023
Filed — Alteration
EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00946595-I1
10/11/2023
Special inspection requirement — Air barrier - visual inspection
ALAN DUDLEY
10/11/2023
Special inspection requirement — Energy Code Compliance Inspections
ALAN DUDLEY
10/11/2023
Special inspection requirement — Final
ALAN DUDLEY
10/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALAN DUDLEY
10/11/2023
Special inspection requirement — Masonry
ALAN DUDLEY
09/18/2023
Violation issued (HPD, closed)
B
09/14/2023
Violation issued (HPD, closed)
B
09/14/2023
Violation issued (HPD, closed)
C
09/14/2023
Violation issued (HPD, closed)
B
09/13/2023
Violation issued (HPD, closed)
A
09/13/2023
Violation issued (HPD, closed)
B
09/13/2023
Violation issued (HPD, closed)
C
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTRISTAR PLBG & HTG INC08/01/2025
DOB NOWBoiler EquipmentSigned-offTRISTAR PLBG & HTG INC07/31/2025
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP07/28/2025
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES NY INC11/14/2024
DOB NOWGeneral ConstructionSigned-offMAC DESIGN CORP11/28/2023
DOB NOWSidewalk ShedPermit IssuedMNK ENTERPRISES NY INC11/17/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC01/20/2022
BISOTISSUEDREAL DEAL DECORATION LLC02/05/2020
BISOTISSUEDLAWRENCE EXTERIOR RESTORATION04/22/2019
BISOTISSUEDXINOS CONSTRUCTION CORP03/06/2007
BISEQISSUEDXINOS CONSTRUCTION CORP03/05/2007
BISEQISSUEDXINOS CONSTRUCTION CORP01/12/2007
BISOTISSUEDXINOS CONSTRUCTION CORP01/02/2007
BISEQISSUEDSPRING SCAFFOLDING11/18/2004
1 project · most recent 04/13/2026
Gas
FiledStatusContractorScope
04/13/2026Signed-offTRISTAR PLBG & HTG INCGas
4 projects · most recent 11/16/2023
General Wiring
FiledStatusContractorScope
11/16/2023Permit IssuedRICHARD NEU—
01/21/2022CompleteBOROWIDE ELECT'L CONTR'S—
02/07/2020Permit IssuedTOP TIER ELECTRIC INCGeneral Wiring
09/27/2019CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/08/2026Pass-Final Boiler Equipment InspectionPassView ↗
02/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/07/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/11/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
04/14/2026Energy Code Compliance InspectionsLOUIS ARENAprogress
04/14/2026Maintenance informationLOUIS ARENAenergy_progress
04/14/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
04/14/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
04/14/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
04/14/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/10/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
04/10/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
04/10/2026Maintenance informationLOUIS ARENAenergy_progress
04/10/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
04/10/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
04/10/2026Energy Code Compliance InspectionsLOUIS ARENAprogress
01/21/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/21/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
01/21/2026Energy Code Compliance InspectionsLOUIS ARENAprogress
01/21/2026Maintenance informationLOUIS ARENAenergy_progress
01/21/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/21/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/11/2023Air barrier - visual inspectionALAN DUDLEYenergy_progress
10/11/2023Energy Code Compliance InspectionsALAN DUDLEYprogress
10/11/2023FinalALAN DUDLEYprogress
10/11/2023Tenant Protection Plan ComplianceALAN DUDLEYspecial
10/11/2023MasonryALAN DUDLEYspecial
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026M00665345-I1Request digital key ↗
08/28/2026M00946595-I1Request digital key ↗
08/28/2026M00962285-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION6
02/24/2020140885068Open ↗
02/20/2020140885068Open ↗
02/14/2020140838556Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION2
02/04/2020140885068Open ↗
04/19/2019140838556Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026M01250612-P1Open ↗
09/02/2026M01250612-P1Open ↗
08/26/2026M01250612-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00665345-I1Open ↗
08/28/2026M00946595-I1Open ↗
08/19/2026M01250612-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026M01250612-P1Open ↗
08/26/2026M01250612-S1Open ↗
08/25/2026M00946595-I1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/04/2020140885068Open ↗
04/19/2019140838556Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/04/2020140885068Open ↗
04/19/2019140838556Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/04/2020140885068Open ↗
04/19/2019140838556Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
02/20/2020140838556Open ↗
02/20/2020140838556Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES3
02/04/2020140885068Open ↗
04/19/2019140838556Open ↗
02/24/2020140885068Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026M00946595-I1Open ↗
08/19/2026M01250612-P2Open ↗
08/19/2026M01250612-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/24/2020140885068Open ↗
02/04/2020140885068Open ↗
04/19/2019140838556Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
02/04/2020140885068Open ↗
04/19/2019140838556Open ↗
▸BISNYCECC ANALYSIS2
02/04/2020140885068Open ↗
04/19/2019140838556Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/20/2020140838556Open ↗
02/20/2020140838556Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/20/2020140838556Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/04/2020140885068Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/04/2020140885068Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/20/2020140838556Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00962285-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
02/24/2020140885068Open ↗
02/20/2020140838556Open ↗
02/14/2020140838556Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms7
▸BISBOROUGH INTAKE FORM3
02/20/2020140838556Open ↗
02/20/2020140885068Open ↗
02/14/2020140838556Open ↗
▸BISADDITIONAL INFORMATION2
02/24/2020140885068Open ↗
02/14/2020140838556Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
02/04/2020140885068Open ↗
04/19/2019140838556Open ↗