← Back
Office only, 2-6 stories
18 WHITWELL PLACE
BROOKLYN · BIN 3007702
💬 Discuss this project
1931Year Built
3Stories
O2Building Class
M1-4/R6BZoning
4,232 sfGross Floor Area
5Units
0 Open Violations
Office only, 2-6 stories · Owner of record: 14 WHITWELL GT LLC · 1,800 sf lot · 2.35 FAR built · Flood zone X
Locations of Work
StructuralMechanicalFire Protection
Roof2p · 2 filings · 9 docs
Floor 31p · 1 filing · 4 docs
Floor 22p · 2 filings · 9 docs
Floor 11p · 1 filing · 4 docs
Cellar2p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
14 WHITWELL GT1103/22/2026
BLDG INC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/30/2019$2.3M—— → —$549/sf building
08/10/2018$1.4M—— → —$343/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEROY STREET STUDIO202/22/2024
WAVIC ENGINEERING PLLC109/18/2023
BLUE SKY DESIGN, INC.203/21/2022
ENTHINK ENGINEERS LLC112/20/2021
NEW YORK ENGINEERS LLC105/10/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/08/2026
BLDG INCORPORATEDGeneral Contractor407/08/2026
ASCO SPRINKLER CO.,INCFire Protection207/08/2026
DONATO, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WAVIC ENGINEERING PLLC1733109/18/2023
BLUE SKY DESIGN, INC.1908110/22/2020
RYAN SPECIAL ENGINEERING2018105/10/2020
Building Lifecycle
All (66)Filed (7)Permit Issued (8)Signed Off (5)Violation (6)Inspection (4)Objection (32)Special Inspection (4)
09/16/2024
Signed off — Alteration
B00347473-I1
08/09/2024
Signed off — Alteration
FILING HEREWITH PLUMBING MODIFICATION ON THE CELLAR,,1ST 2ND AND3RD FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY
B00583781-I1
08/08/2024
Signed off — Alteration
FILING HEREWITH SPRINKLER MODIFICATION ON THE CELLAR, 1ST2ND AND 3RD FLOOR AS IDICATED ON TH DRAWINGS. NO CHNAGE IN USE EGRESS OR OCCUPANCY.
B00913129-I1
07/19/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/16/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/21/2024
Permit issued — Mechanical Systems
B00347473-I1-MS
05/03/2024
Permit issued — Sprinklers
B00913129-I1-EW-SP
05/02/2024
Signed off — Alteration
Foundation work
B00357044-I1
03/26/2024
Permit issued — Structural
B00357044-I1-ST
02/22/2024
Filed — Alteration
FILING HEREWITH PLUMBING MODIFICATION ON THE CELLAR,,1ST 2ND AND3RD FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY
B00583781-P1
11/06/2023
Permit issued — Sprinklers
B00913129-I1-EW-SP
10/15/2023
Objection resolved — Addressed
10/11/2023
Objection resolved — Addressed
10/11/2023
Objection resolved — Addressed
09/20/2023
Objection raised — Scope
09/20/2023
Objection raised — Structural
09/20/2023
Objection raised — Structural
09/18/2023
Filed — Alteration
FILING HEREWITH SPRINKLER MODIFICATION ON THE CELLAR, 1ST2ND AND 3RD FLOOR AS IDICATED ON TH DRAWINGS. NO CHNAGE IN USE EGRESS OR OCCUPANCY.
B00913129-I1
09/06/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
B00650403-I1
08/02/2023
Special inspection requirement — Sprinkler Systems
DARIUSZ LUCZAK
12/19/2022
Violation issued (ECB, closed)
Unknown
12/19/2022
Violation issued (ECB, closed)
Construction
12/19/2022
Violation issued (ECB, closed)
Construction
12/19/2022
Violation issued (ECB, closed)
Construction
12/19/2022
Violation issued (ECB, closed)
Construction
12/17/2022
Permit issued — Protection and Mechanical Methods
B00650403-I1-PM
11/14/2022
Permit issued — Plumbing
B00583781-I1-PL
10/14/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/25/2022
Objection resolved — Addressed
06/24/2022
Objection raised — Other
06/24/2022
Objection raised — Inspections
06/24/2022
Objection raised — Other
06/24/2022
Objection raised — Structural
06/24/2022
Objection raised — Other
06/24/2022
Objection raised — Other
06/24/2022
Objection raised — Other
06/24/2022
Objection raised — Other
06/24/2022
Objection raised — Scope
06/24/2022
Objection raised — Admin
06/24/2022
Objection raised — Admin
06/24/2022
Objection raised — Admin
06/24/2022
Objection raised — Structural
04/12/2022
Objection resolved — Addressed
03/29/2022
Objection raised — Inspections
03/21/2022
Filed — Alteration
Foundation work
B00357044-S1
03/15/2022
Objection resolved — Addressed
03/15/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/11/2022
Special inspection requirement — Final
03/11/2022
Special inspection requirement — Footing and Foundation
02/25/2022
Objection raised — Admin
02/24/2022
Objection resolved — Addressed
02/11/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/20/2021
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
B00650403-I1
12/20/2021
Permit issued — Protection and Mechanical Methods
B00650403-I1-PM
11/16/2021
Permit issued — Plumbing
B00583781-I1-PL
11/09/2021
Objection raised — Other
11/09/2021
Objection resolved — Addressed
11/08/2021
Objection resolved — Addressed
11/05/2021
Objection raised — Other
11/03/2021
Filed — Alteration
FILING HEREWITH PLUMBING MODIFICATION ON THE CELLAR,,1ST 2ND AND3RD FLOOR AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY
B00583781-I1
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBLDG INCORPORATED06/21/2024
DOB NOWSprinklersSigned-offASCO SPRINKLER CO.,INC05/03/2024
DOB NOWStructuralSigned-offBLDG INCORPORATED03/26/2024
DOB NOWSprinklersSigned-offASCO SPRINKLER CO.,INC11/06/2023
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC12/17/2022
DOB NOWPlumbingSigned-offDONATO, INC11/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC12/20/2021
DOB NOWPlumbingSigned-offDONATO, INC11/16/2021
BIS—ISSUEDBLDG INCORPORATED06/26/2023
BIS—ISSUEDBLDG INCORPORATED04/14/2023
BIS—ISSUEDBLDG INCORPORATED04/04/2023
BIS—ISSUEDBLDG INCORPORATED04/28/2022
BISOTISSUEDJABUS BUILDING CORP10/22/2009
2 projects · most recent 05/10/2022
General Wiring
FiledStatusContractorScope
05/10/2022CompleteFRITZMARTIN ELECTRIC INC.General Wiring
01/02/2019CompleteFOSTER ELEC'L SVC., INC.1 meters, 1 new_meters
1 project · most recent 03/21/2022
Steel Concrete
FiledStatusContractorScope
03/21/2022Signed-offBLDG INCORPORATEDSteel, Concrete
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/14/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/11/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/02/2023Sprinkler SystemsDARIUSZ LUCZAKspecial
03/15/2022Structural Stability – Alterations of existing buildings—special
03/11/2022Final—progress
03/11/2022Footing and Foundation—progress
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/31/2026B00583781-P1Request digital key ↗
08/31/2026B00650403-I1Request digital key ↗
08/26/2026B00913129-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00347473-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026B00357044-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION11
10/30/2024321590587Open ↗
10/25/2024321590587Open ↗
02/09/2024321590587Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION2
06/09/2021321590587Open ↗
10/22/2009320070962Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/05/2019320070962Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
04/19/2024321590587Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/01/2021321590587Open ↗
▸BISVERIFY TAX LOT1
09/19/2024321590587Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/18/2024321590587Open ↗
▸BISZONING DIAGRAM1
05/03/2021321590587Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/01/2021321590587Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026B00583781-P1Open ↗
08/31/2026B00583781-I1Open ↗
08/26/2026B00913129-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
01/24/2019320070962Open ↗
01/24/2019320070962Open ↗
01/18/2019320070962Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B00913129-I1Open ↗
▸Trade Schedules & Equipment1
▸BISPLUMBING (PL) SIGNOFF1
09/18/2024321590587Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
10/19/2020321590587Open ↗
09/02/2020321590587Open ↗
09/21/2009320070962Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/28/2021321590587Open ↗
▸BISSTREET TREE SIGNOFF1
12/18/2024321590587Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/26/2026B00913129-I1Open ↗
08/15/2026B00583781-I1Open ↗
08/13/2026B00357044-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/21/2009320070962Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/28/2021321590587Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/28/2021321590587Open ↗
10/19/2020321590587Open ↗
10/19/2020321590587Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/23/2024321590587Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/10/2024321590587Open ↗
▸BISLIGHTING CONTROLS1
04/10/2024321590587Open ↗
▸BISEXTERIOR LIGHTING POWER1
04/10/2024321590587Open ↗
▸BISINTERIOR LIGHTING POWER1
04/10/2024321590587Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00347473-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/28/2021321590587Open ↗
10/19/2020321590587Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/10/2024321590587Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/17/2024321590587Open ↗
▸Approvals, Objections & Sign-offs12
▸BISSCHEDULE A - OCCUPANCY / USE7
10/30/2024321590587Open ↗
10/25/2024321590587Open ↗
04/22/2021321590587Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/24/2019320070962Open ↗
01/18/2019320070962Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/21/2009320070962Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
09/18/2024321590587Open ↗
▸BISCURB CUT (CC) SIGNOFF1
12/17/2024321590587Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT3
01/24/2019320070962Open ↗
01/18/2019320070962Open ↗
09/21/2009320070962Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/16/2024321590587Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
04/06/2021321590587Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/09/2021321590587Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
12/26/2024321590587Open ↗
04/08/2024321590587Open ↗
04/06/2021321590587Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
01/24/2019320070962Open ↗
01/18/2019320070962Open ↗
▸BISEFILING COVER SHEET1
09/21/2009320070962Open ↗
▸Other Documents3
▸BISMAINTENANCE INFORMATION1
04/10/2024321590587Open ↗
▸BISPLOT DIAGRAM1
04/13/2021321590587Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
04/06/2021321590587Open ↗