← Back
Miscellaneous one family
140-09 14 AVENUE
QUEENS · BIN 4101013
💬 Discuss this project
1920Year Built
2Stories
A9Building Class
R2AZoning
2,080 sfGross Floor Area
1Units
Rent Stabilized65 Open Violations ▸
Miscellaneous one family · 4,010 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3JC4 NY INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/05/2021$1.2M—— → —$567/sf building
01/31/2020$750K—3JC4 NY INC → THRIVE HOME BUYERS LLC$361/sf building
03/27/2018$500K—— → —$240/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURE DESIGN, PLLC504/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KSTM EXPEDIRING SERVICES503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KWARTENG, ISAACElectrical103/21/2026
MAVROGIANNIS, CONSTANTINOSElectrical103/21/2026
ALL HOUR SEWER SERVICE CO.Plumbing107/08/2026
ROM PIPING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519504/27/2021
Building Lifecycle
All (96)Filed (5)Permit Issued (2)Signed Off (1)Violation (60)Objection (8)Special Inspection (20)
11/25/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
11/18/2022
Violation issued (HPD, open)
I
03/17/2022
Violation issued (HPD, open)
I
09/27/2021
Signed off — Alteration
Proposed installation of 3 piece bathroom and weil-mclain boiler in cellar floor and 5 piece master bathroom on second floor as per plans filed herewith.
Q00342251-I1
07/01/2021
Permit issued — Plumbing
Q00342251-I1-PL
05/24/2021
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
05/24/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/24/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/24/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
05/24/2021
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
04/27/2021
Filed — Alteration
Proposed installation of 3 piece bathroom and weil-mclain boiler in cellar floor and 5 piece master bathroom on second floor as per plans filed herewith.
Q00342251-P4
04/21/2021
Violation issued (HPD, open)
I
03/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/15/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
03/15/2021
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
03/15/2021
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
03/15/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
02/12/2021
Filed — Alteration
Proposed installation of 3 piece bathroom and weil-mclain boiler in cellar floor and 5 piece master bathroom on second floor as per plans filed herewith.
Q00342251-P3
01/21/2021
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
01/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
01/21/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/21/2021
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
01/21/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
12/07/2020
Filed — Alteration
Proposed installation of 3 piece bathroom and weil-mclain boiler in cellar floor and 5 piece master bathroom on second floor as per plans filed herewith.
Q00342251-P2
12/07/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/07/2020
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
12/07/2020
Special inspection requirement — Maintenance information
Younes Abouyaala
12/07/2020
Special inspection requirement — HVAC and service water heating equipment
Younes Abouyaala
12/07/2020
Special inspection requirement — HVAC and service water heating system controls
Younes Abouyaala
11/12/2020
Filed — Alteration
Proposed installation of 3 piece bathroom and weil-mclain boiler in cellar floor and 5 piece master bathroom on second floor as per plans filed herewith.
Q00342251-P1
10/14/2020
Permit issued — Plumbing
Q00342251-I1-PL
07/29/2020
Objection raised — Other
07/29/2020
Objection resolved — Addressed
07/24/2020
Objection raised — Mechanical
07/24/2020
Objection resolved — Addressed
07/24/2020
Objection raised — Fire_Protection
07/24/2020
Objection resolved — Addressed
07/24/2020
Objection raised — Scope
07/24/2020
Objection resolved — Addressed
07/21/2020
Filed — Alteration
Proposed installation of 3 piece bathroom and weil-mclain boiler in cellar floor and 5 piece master bathroom on second floor as per plans filed herewith.
Q00342251-I1
11/07/2019
Violation issued (HPD, open)
I
03/22/2019
Violation issued (ECB, closed)
Construction
05/01/2017
Violation issued (ECB, closed)
Construction
01/12/2017
Violation issued (HPD, open)
C
01/12/2017
Violation issued (HPD, open)
C
12/30/2016
Violation issued (HPD, closed)
C
12/30/2016
Violation issued (HPD, open)
C
12/30/2016
Violation issued (HPD, open)
B
12/30/2016
Violation issued (HPD, open)
B
11/16/2016
Violation issued (HPD, open)
C
11/02/2016
Violation issued (HPD, open)
C
10/15/2016
Violation issued (HPD, open)
A
10/15/2016
Violation issued (HPD, open)
B
10/15/2016
Violation issued (HPD, open)
B
10/15/2016
Violation issued (HPD, open)
A
10/15/2016
Violation issued (HPD, open)
B
10/15/2016
Violation issued (HPD, open)
A
10/15/2016
Violation issued (HPD, open)
B
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROM PIPING & HTG INC07/01/2021
DOB NOWPlumbingSigned-offALL HOUR SEWER SERVICE CO.10/14/2020
BISOTISSUEDSK GROUP NYC CORP09/22/2020
1 project · most recent 09/24/2020
General Wiring
FiledStatusContractorScope
09/24/2020CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/24/2021HVAC and service water heating equipment Younes Abouyaalaenergy_progress
05/24/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/24/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/24/2021Maintenance informationYounes Abouyaalaenergy_progress
05/24/2021HVAC and service water heating system controls Younes Abouyaalaenergy_progress
03/15/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
03/15/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
03/15/2021HVAC and service water heating equipment Younes Abouyaalaenergy_progress
03/15/2021HVAC and service water heating system controls Younes Abouyaalaenergy_progress
03/15/2021Maintenance informationYounes Abouyaalaenergy_progress
01/21/2021HVAC and service water heating system controls Younes Abouyaalaenergy_progress
01/21/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
01/21/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/21/2021HVAC and service water heating equipment Younes Abouyaalaenergy_progress
01/21/2021Maintenance informationYounes Abouyaalaenergy_progress
12/07/2020Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/07/2020Energy Code Compliance InspectionsYounes Abouyaalaprogress
12/07/2020Maintenance informationYounes Abouyaalaenergy_progress
12/07/2020HVAC and service water heating equipment Younes Abouyaalaenergy_progress
12/07/2020HVAC and service water heating system controls Younes Abouyaalaenergy_progress
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing5
08/28/2026Q00342251-P4Request digital key ↗
08/15/2026Q00342251-P1Request digital key ↗
08/15/2026Q00342251-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
08/30/2021421773398Open ↗
07/24/2020421773398Open ↗
▸BISWORK PERMIT APPLICATION1
09/22/2020421773398Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
07/27/2020421773398Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature16
09/28/2026Q00342251-P3Open ↗
09/28/2026Q00342251-P3Open ↗
09/28/2026Q00342251-P3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026Q00342251-P4Open ↗
08/28/2026Q00342251-P3Open ↗
08/28/2026Q00342251-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/28/2026Q00342251-P3Open ↗
09/02/2026Q00342251-P4Open ↗
08/23/2026Q00342251-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026Q00342251-P1Open ↗
08/28/2026Q00342251-P4Open ↗
08/28/2026Q00342251-P3Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/17/2020421773398Open ↗
▸Energy Compliance3
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
06/17/2020421773398Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/28/2021421773398Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/28/2021421773398Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/28/2021421773398Open ↗
09/28/2021421773398Open ↗
09/28/2021421773398Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/30/2020421773398Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/07/2021421773398Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
10/07/2021421773398Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
06/17/2020421773398Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
09/01/2021421773398Open ↗
▸BISEFILING COVER SHEET1
06/15/2020421773398Open ↗