← Back
Office with commercial, 1-6 stories
140-15 20 AVENUE
QUEENS · College Point · BIN 4314678
💬 Discuss this project
1991Year Built
2Stories
O5Building Class
M1-1Zoning
47,498 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 1802 PETRACCA PLACE LLC · 169,345 sf lot · 0.28 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionOther
Roof4p · 1 filing · 20 docs
Floor 25p · 3 filings · 20 docs
Floor 13p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
18-02 PETRACCA PLACE503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSF ENGINEERING, PC606/02/2022
WERFEL, LOPINTO, AND ASSOCIATES, AR104/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASS1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
154-21 CORPGeneral Contractor1507/08/2026
GO GREENER PLUMBING LLCFire Protection107/08/2026
GO GREENER PLUMBING LLCPlumbing107/08/2026
PETER MICELI PLUMBINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TSF ENGINEERING, PC1274706/02/2022
Building Lifecycle
All (75)Filed (7)Permit Issued (10)Signed Off (4)Violation (21)Inspection (3)Special Inspection (30)
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/19/2024
Signed off — Alteration
installation of new HVAC Rooftop units and modification and/or replacement of existing ductwork as shown on plans. Application filed in conjunction with Q00502725 (General Construction)
Q00502787-I1
04/19/2024
Signed off — Alteration
it is proposed to modify plumbing and sprinkler systems as shown on plans. Application filed in conjunction with Q00502725
Q00502819-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/15/2022
Signed off — Alteration
Q00503070-I1
06/23/2022
Signed off — Alteration
Q00502725-I1
06/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
06/03/2022
Special inspection requirement — Maintenance information
Nicholas Tucci
06/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
06/03/2022
Special inspection requirement — Heating Systems
Nicholas Tucci
06/03/2022
Special inspection requirement — Mechanical Systems
Nicholas Tucci
06/03/2022
Special inspection requirement — Final
Nicholas Tucci
06/03/2022
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
06/03/2022
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
06/03/2022
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
06/02/2022
Filed — Alteration
installation of new HVAC Rooftop units and modification and/or replacement of existing ductwork as shown on plans. Application filed in conjunction with Q00502725 (General Construction)
Q00502787-P2
05/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
05/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
05/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
05/02/2022
Special inspection requirement — Heating Systems
Nicholas Tucci
05/02/2022
Special inspection requirement — Mechanical Systems
Nicholas Tucci
05/02/2022
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
05/02/2022
Special inspection requirement — Final
Nicholas Tucci
05/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
05/02/2022
Special inspection requirement — Maintenance information
Nicholas Tucci
03/02/2022
Permit issued — General Construction
Q00502725-I1-GC
12/21/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/08/2021
Permit issued — General Construction
Q00502725-I1-GC
12/08/2021
Permit issued — Mechanical Systems
Q00502787-I1-MS
09/29/2021
Permit issued — Boiler Equipment
Q00503070-I1-BE
09/22/2021
Filed — Alteration
installation of new HVAC Rooftop units and modification and/or replacement of existing ductwork as shown on plans. Application filed in conjunction with Q00502725 (General Construction)
Q00502787-P1
09/16/2021
Special inspection requirement — Sprinkler Systems
Nicholas Tucci
09/16/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
09/13/2021
Filed — Alteration
it is proposed to modify plumbing and sprinkler systems as shown on plans. Application filed in conjunction with Q00502725
Q00502819-P1
08/25/2021
Permit issued — General Construction
Q00502725-I1-GC
08/25/2021
Permit issued — Mechanical Systems
Q00502787-I1-MS
08/09/2021
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
08/09/2021
Special inspection requirement — Heating Systems
Nicholas Tucci
08/09/2021
Special inspection requirement — Mechanical Systems
Nicholas Tucci
08/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
08/09/2021
Special inspection requirement — Final
Nicholas Tucci
08/09/2021
Special inspection requirement — Maintenance information
Nicholas Tucci
08/09/2021
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
08/09/2021
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
08/09/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
08/09/2021
Special inspection requirement — Sprinkler Systems
Nicholas Tucci
07/30/2021
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/22/2021
Permit issued — Mechanical Systems
Q00502787-I1-MS
06/23/2021
Permit issued — Plumbing
Q00502819-I1-PL
06/23/2021
Permit issued — Plumbing
Q00502819-I1-EW-SP
06/23/2021
Permit issued — General Construction
Q00502725-I1-GC
05/03/2021
Filed — Alteration
it is proposed to modify plumbing and sprinkler systems as shown on plans. Application filed in conjunction with Q00502725
Q00502819-I1
05/03/2021
Filed — Alteration
Q00503070-I1
04/30/2021
Filed — Alteration
installation of new HVAC Rooftop units and modification and/or replacement of existing ductwork as shown on plans. Application filed in conjunction with Q00502725 (General Construction)
Q00502787-I1
04/29/2021
Filed — Alteration
Q00502725-I1
01/07/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-off154-21 CORP03/02/2022
DOB NOWGeneral ConstructionSigned-off154-21 CORP12/08/2021
DOB NOWMechanical SystemsSigned-off154-21 CORP12/08/2021
DOB NOWBoiler EquipmentSigned-offPETER MICELI PLUMBING09/29/2021
DOB NOWGeneral ConstructionSigned-off154-21 CORP08/25/2021
DOB NOWMechanical SystemsSigned-off154-21 CORP08/25/2021
DOB NOWMechanical SystemsSigned-off154-21 CORP07/22/2021
DOB NOWPlumbingSigned-offGO GREENER PLUMBING LLC06/23/2021
DOB NOWPlumbingSigned-offGO GREENER PLUMBING LLC06/23/2021
DOB NOWGeneral ConstructionSigned-off154-21 CORP06/23/2021
BISOTISSUEDBROOKSIDE ENVIRONMETAL IN11/23/2020
BISPLISSUEDSTELLMAR PLBG & MECH.CORP10/06/2017
BISSPISSUEDSTELLMAR PLBG & MECH CORP10/06/2017
BISOTISSUEDKAYCO CONSTRUCTION CORP09/26/2017
BISMHISSUEDKAYCO CONSTRUCTION CORP09/26/2017
BIS—ISSUEDPETRACCA & SONCS,INC02/14/2002
BIS—ISSUEDPETRACCA & SONCS,INC04/30/2001
BIS—ISSUEDROCKAWAY TRIANGLE ASSOCIATES LIM06/25/1992
1 project · most recent 03/03/2023
General Wiring
FiledStatusContractorScope
03/03/2023CompleteT.M.T ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/21/2021Pass-Final Boiler Equipment InspectionPassView ↗
08/09/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
07/30/2021Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
06/03/2022HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
06/03/2022Maintenance informationNicholas Tuccienergy_progress
06/03/2022Fire-Resistant Penetrations and JointsNicholas Tuccispecial
06/03/2022Heating SystemsNicholas Tuccispecial
06/03/2022Mechanical SystemsNicholas Tuccispecial
06/03/2022FinalNicholas Tucciprogress
06/03/2022Energy Code Compliance InspectionsNicholas Tucciprogress
06/03/2022HVAC-R and service water heating equipmentNicholas Tuccienergy_progress
06/03/2022HVAC-R and service water heating system controlsNicholas Tuccienergy_progress
05/02/2022HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
05/02/2022HVAC-R and service water heating system controlsNicholas Tuccienergy_progress
05/02/2022Fire-Resistant Penetrations and JointsNicholas Tuccispecial
05/02/2022Heating SystemsNicholas Tuccispecial
05/02/2022Mechanical SystemsNicholas Tuccispecial
05/02/2022Energy Code Compliance InspectionsNicholas Tucciprogress
05/02/2022FinalNicholas Tucciprogress
05/02/2022HVAC-R and service water heating equipmentNicholas Tuccienergy_progress
05/02/2022Maintenance informationNicholas Tuccienergy_progress
09/16/2021Sprinkler SystemsNicholas Tuccispecial
09/16/2021HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
08/09/2021Fire-Resistant Penetrations and JointsNicholas Tuccispecial
08/09/2021Heating SystemsNicholas Tuccispecial
08/09/2021Mechanical SystemsNicholas Tuccispecial
08/09/2021Energy Code Compliance InspectionsNicholas Tucciprogress
08/09/2021FinalNicholas Tucciprogress
Latest 25 of 35.
▾Documents — 131 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026Q00502725-I1Request digital key ↗
08/27/2026Q00503070-I1Request digital key ↗
08/27/2026Q00502819-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION26
02/09/2026401235588Open ↗
02/04/2026401235588Open ↗
01/08/2026401235588Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION2
06/05/2025401235588Open ↗
11/23/2020440648195Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE COMPLIANCE1
11/23/2020440648195Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/29/2021401235588Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
11/18/2020440648195Open ↗
▸Seals & Professional Certifications45
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026Q00503070-I1Open ↗
09/23/2026Q00503070-I1Open ↗
09/23/2026Q00503070-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026Q00503070-I1Open ↗
08/28/2026Q00502787-P2Open ↗
08/28/2026Q00502787-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00502725-I1Open ↗
08/27/2026Q00503070-I1Open ↗
08/27/2026Q00502819-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/18/2020440648195Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/18/2020440648195Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/18/2020440648195Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/01/2025401235588Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026Q00502725-I1Open ↗
08/27/2026Q00503070-I1Open ↗
08/27/2026Q00502819-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026Q00502787-I1Open ↗
08/13/2026Q00502819-I1Open ↗
08/13/2026Q00502725-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/13/2021440648195Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/18/2020440648195Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00503070-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/02/2024401235588Open ↗
04/28/2021440648195Open ↗
04/14/2021440648195Open ↗
Showing 3 of 4 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
11/23/2020440648195Open ↗
▸Approvals, Objections & Sign-offs15
▸BISSCHEDULE A - OCCUPANCY / USE11
02/04/2026401235588Open ↗
01/06/2026401235588Open ↗
12/18/2025401235588Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/06/2021440648195Open ↗
01/13/2021440648195Open ↗
▸BISFINAL1
11/23/2020440648195Open ↗
▸BISSUPERSEDING LETTER1
06/05/2025401235588Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT (FINAL): PW32
07/28/2025401235588Open ↗
01/13/2021440648195Open ↗
▸BISCOST AFFIDAVIT1
11/18/2020440648195Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION7
01/08/2026401235588Open ↗
09/09/2025401235588Open ↗
06/04/2024401235588Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/18/2020440648195Open ↗
▸BISBOROUGH INTAKE FORM1
06/05/2025401235588Open ↗
▸Other Documents1
▸BIS* FIRE STOPS 27-3451
07/25/2025401235588Open ↗