← Back
Elevator cooperative
140-15 HOLLY AVENUE
QUEENS · East Flushing · BIN 4117387
💬 Discuss this project
1960Year Built
7Stories
D4Building Class
R3-2Zoning
99,338 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized20 Open Violations 19 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: 140-15 HOLLY AVE OWNERS CORP · 48,000 sf lot · 2.07 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 4 docs
Floor 7Under Construction16p · 1 filing · 20 docs
Floor 6Under Construction16p · 1 filing · 20 docs
Floor 5Under Construction16p · 1 filing · 20 docs
Floor 4Under Construction16p · 1 filing · 20 docs
Floor 3Under Construction16p · 1 filing · 20 docs
Floor 2Under Construction16p · 1 filing · 20 docs
Floor 1Under Construction18p · 1 filing · 20 docs
CellarUnder Construction20p · 2 filings · 20 docs
Site & exteriorUnder Construction8p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVARGA CONSTRUCTION407/08/2026
140-15 HOLLY AVE OWNERS303/22/2026
HOLLY INC203/21/2026
K S R COMPANY203/21/2026
KSR103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JME BUILDING CONSULTING203/21/2026
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
NEW YORK ENGINEERING603/21/2026
LEVIN ENGINEERING PLLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARATHON MECHANICAL LLCPlumbing507/08/2026
AVARGA CONSTRUCTION CORPGeneral Contractor407/08/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor303/21/2026
ALPHONSE, MICHAELElectrical103/21/2026
BIG APPLE FIRE SPRKL CO IFire Protection107/08/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
PEREIRA, WESLLEYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEVIN ENGINEERING PLLC1267208/15/2024
DEAN MENDEZ ARCHITECT, P.8621101/11/2023
NEW YORK ENGINEERING ASSO851607/07/2022
Building Lifecycle
All (129)Filed (10)Permit Issued (11)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (2)Special Inspection (28)
05/11/2026
Permit issued — Plumbing
Q00232012-I1-PL
05/08/2026
Violation issued (HPD, closed)
C
05/08/2026
Violation issued (HPD, open)
A
05/08/2026
Violation issued (HPD, closed)
C
05/08/2026
Violation issued (HPD, open)
B
05/08/2026
Violation issued (HPD, open)
B
05/08/2026
Violation issued (HPD, closed)
C
02/26/2026
Violation issued (HPD, closed)
A
02/26/2026
Violation issued (HPD, closed)
C
10/04/2025
Violation issued (HPD, closed)
C
10/04/2025
Violation issued (HPD, closed)
C
10/04/2025
Violation issued (HPD, closed)
B
08/29/2025
Violation issued (HPD, closed)
C
08/29/2025
Violation issued (HPD, open)
A
08/29/2025
Violation issued (HPD, closed)
C
08/29/2025
Violation issued (HPD, closed)
C
08/29/2025
Violation issued (HPD, closed)
C
08/29/2025
Violation issued (HPD, closed)
C
08/29/2025
Violation issued (HPD, closed)
C
08/28/2025
Violation issued (ECB, closed)
Elevators
05/28/2025
Violation issued (HPD, open)
A
05/23/2025
Violation issued (HPD, closed)
C
05/23/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
B
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
05/14/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, closed)
C
04/25/2025
Violation issued (HPD, closed)
C
04/17/2025
Permit issued — Plumbing
Q00232012-I1-PL
04/15/2025
Violation issued (HPD, open)
B
04/15/2025
Violation issued (HPD, closed)
B
04/15/2025
Violation issued (HPD, closed)
C
04/15/2025
Violation issued (HPD, closed)
C
04/15/2025
Violation issued (HPD, closed)
C
04/15/2025
Violation issued (HPD, closed)
C
04/15/2025
Violation issued (HPD, closed)
A
04/15/2025
Violation issued (HPD, closed)
B
04/15/2025
Violation issued (HPD, closed)
A
04/15/2025
Violation issued (HPD, closed)
A
04/15/2025
Violation issued (HPD, closed)
C
04/15/2025
Violation issued (HPD, closed)
C
04/15/2025
Violation issued (HPD, closed)
B
04/15/2025
Violation issued (HPD, closed)
B
04/15/2025
Violation issued (HPD, closed)
B
04/15/2025
Violation issued (HPD, closed)
B
04/15/2025
Violation issued (HPD, closed)
B
02/11/2025
Violation issued (HPD, open)
C
02/11/2025
Violation issued (HPD, closed)
B
02/11/2025
Violation issued (HPD, closed)
B
02/11/2025
Violation issued (HPD, closed)
B
02/11/2025
Violation issued (HPD, closed)
B
02/11/2025
Violation issued (HPD, closed)
B
02/11/2025
Violation issued (HPD, closed)
C
02/11/2025
Violation issued (HPD, open)
C
02/11/2025
Violation issued (HPD, closed)
B
02/11/2025
Violation issued (HPD, closed)
B
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMARATHON MECHANICAL LLC05/11/2026
DOB NOWPlumbingPermit IssuedMARATHON MECHANICAL LLC04/17/2025
DOB NOWSprinklersSigned-offBIG APPLE FIRE SPRKL CO I07/10/2024
DOB NOWPlumbingPermit IssuedMARATHON MECHANICAL LLC04/11/2024
DOB NOWGeneral ConstructionSigned-offAVARGA CONSTRUCTION CORP04/12/2023
DOB NOWSidewalk ShedSigned-offAVARGA CONSTRUCTION CORP02/10/2023
DOB NOWBoiler EquipmentSigned-offNEW YORK HEATING CORP07/19/2022
DOB NOWPlumbingPermit IssuedMARATHON MECHANICAL LLC06/22/2022
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME08/12/2020
DOB NOWBoiler EquipmentSigned-offNEW YORK HEATING CORP07/08/2020
DOB NOWPlumbingPermit IssuedMARATHON MECHANICAL LLC06/25/2020
BIS—ISSUEDCITY STONE WORLD INC06/28/2022
BISSPISSUEDJEM FIRE PREVENTION INC07/02/2019
BISPLISSUEDHP SERVICES INC05/20/2019
BIS—ISSUEDCITY STONE WORLD INC10/25/2018
BISOTISSUEDCITY STONE WORLD INC04/23/2018
BISPLISSUEDCATMAN PLUMBING INC05/25/2017
BISOTISSUEDJUN'S CONSTRUCTION INC05/19/2017
BISOTISSUEDKSR AND CO01/07/2013
BISOTISSUEDKSR INC05/25/2012
BISOTISSUEDFUTURA BUILDERS GROUP INC.05/25/2011
BISOTISSUEDFUTURA BUILDERS GROUP INC.09/02/2010
BISEQISSUEDMETRO CONTRACTING NY, INC.07/15/2010
BISOTISSUEDR.M.R. CONSTRUCTION01/19/1994
BISOTISSUEDR.M.R. CONSTRUCTION CORP01/19/1994
BISOTISSUEDR.M.R. CONSTRUCTION CORP01/19/1994
BISFSISSUEDDUEL FUEL PLUMBING03/31/1993
BISBLISSUEDDUAL FUEL PLUMBING10/30/1992
1 project · most recent 07/07/2022
Others
FiledStatusContractorScopeMake / Model / Capacity
07/07/2022Signed-offGUARANTEED HOME IMPROVEMEOthers
Other
Lifetime Chimney Supply X10 Chimney ×2
1 project · most recent 08/15/2024
FiledStatusContractorScope
08/15/2024Signed-offBIG APPLE FIRE SPRKL CO I—
1 project · most recent 07/07/2022
Gas
FiledStatusContractorScope
07/07/2022Permit IssuedMARATHON MECHANICAL LLCGas
7 projects · most recent 01/26/2026
General Wiring
FiledStatusContractorScope
01/26/2026CompleteCL ELECTRICAL CORPGeneral Wiring
12/15/2025CompleteCL ELECTRICAL CORPGeneral Wiring
12/15/2025CompleteCL ELECTRICAL CORPGeneral Wiring
02/09/2023Permit IssuedHIGH QUALITY ELECTRIC OF—
12/04/2020Permit IssuedSTAR ELEC'L CONTRACTORS C—
01/10/2019CompleteC & A ELECTRICAL CORPGeneral Wiring
09/10/2018CompleteABSOLUTE ADVANCED ELEC IN1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/28/2024Fire-Resistant Penetrations and JointsDmitry Levinspecial
08/28/2024Sprinkler SystemsDmitry Levinspecial
08/28/2024Tenant Protection Plan ComplianceDmitry Levinspecial
08/28/2024Post-installed AnchorsDmitry Levinspecial
08/14/2024Post-installed AnchorsDmitry Levinspecial
08/14/2024Tenant Protection Plan Compliance—special
08/14/2024Fire-Resistant Penetrations and JointsDmitry Levinspecial
08/14/2024Sprinkler SystemsDmitry Levinspecial
07/08/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
07/08/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
07/07/2022FinalLOUIS ARENAprogress
07/07/2022HVAC and service water heating equipment LOUIS ARENAenergy_progress
07/07/2022Maintenance informationLOUIS ARENAenergy_progress
07/07/2022HVAC and service water heating system controls LOUIS ARENAenergy_progress
07/07/2022Mechanical SystemsLOUIS ARENAspecial
07/07/2022Chimneys and ventsLOUIS ARENAspecial
07/07/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
07/07/2022Heating SystemsLOUIS ARENAspecial
04/04/2022Heating SystemsLOUIS ARENAspecial
04/04/2022HVAC and service water heating equipment LOUIS ARENAenergy_progress
04/04/2022HVAC and service water heating system controls LOUIS ARENAenergy_progress
04/04/2022Maintenance informationLOUIS ARENAenergy_progress
04/04/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
04/04/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
01/03/2022Chimneys and ventsLOUIS ARENAspecial
Latest 25 of 28.
▾Documents — 351 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch4
08/25/2026Q00734896-I1Request digital key ↗
08/25/2026Q00824157-I1Request digital key ↗
08/22/2026Q01026036-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/28/2026Q00232012-S1Request digital key ↗
08/28/2026Q00232012-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00232012-P2Request digital key ↗
08/28/2026Q00232012-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00232012-S2Request digital key ↗
08/15/2026Q00232012-P1Request digital key ↗
▸Applications & Permits77
▸BISPLAN / WORK APPROVAL APPLICATION54
02/26/2024421630373Open ↗
07/14/2022421630373Open ↗
05/31/2022400416867Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION14
09/07/2022421630373Open ↗
07/23/2019421663505Open ↗
05/30/2019421630373Open ↗
Showing 3 of 14 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1133
05/31/2022400416867Open ↗
05/31/2022400416858Open ↗
05/09/2022400415591Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
09/06/2017440406589Open ↗
Showing 1 of 3 on file for this type
▸BISBOROUGH COMMENT. MUST WORK ON SIGNINGOFF OPEN APPLICATIONS BY NEXT TCO RENEWAL1
01/20/2021421630373Open ↗
▸BISNOTE TO APPLICANT: MUST WORK ON SIGNING OFF OPEN APPLICATIONS1
01/25/2021421630373Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/24/2019421630373Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
07/14/2020421630373Open ↗
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026Q00232012-S1Open ↗
09/23/2026Q00232012-S1Open ↗
09/23/2026Q00232012-S1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
11/12/2019421663505Open ↗
11/21/2018421630373Open ↗
11/10/2018421663505Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/23/2026Q00232012-S1Open ↗
09/01/2026Q00232012-S2Open ↗
09/01/2026Q00232012-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026Q00232012-I1Open ↗
08/28/2026Q00232012-S1Open ↗
08/28/2026Q00232012-S2Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
11/10/2018421663505Open ↗
04/26/2018421623434Open ↗
Showing 2 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
11/10/2018421663505Open ↗
04/26/2018421623434Open ↗
05/23/2017440408042Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
10/15/2019421630373Open ↗
08/03/2019421630373Open ↗
08/01/2019421630373Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
12/05/2019421663499Open ↗
▸Safety & Tenant Protection14
▸DOB NOWTenant Protection Plan6
08/28/2026Q00232012-I1Open ↗
08/28/2026Q00232012-S1Open ↗
08/28/2026Q00232012-S2Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes5
01/05/2019421630373Open ↗
04/26/2018421623434Open ↗
05/23/2017440408042Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
05/24/2018421630373Open ↗
Showing 1 of 3 on file for this type
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/28/2026Q00232012-S1Open ↗
08/28/2026Q00232012-S2Open ↗
08/22/2026Q01026036-P1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
11/10/2018421663505Open ↗
10/20/2018421630373Open ↗
04/26/2018421623434Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/25/2026Q00734896-I1Open ↗
08/13/2026Q00232012-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
08/26/2020440408042Open ↗
07/14/2020421630373Open ↗
05/23/2017440408042Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
11/21/2018421630373Open ↗
10/20/2018421630373Open ↗
04/26/2018421623434Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/26/2020440408042Open ↗
07/14/2020421630373Open ↗
09/06/2017440406589Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISNYCECC ANALYSIS2
05/23/2017440408042Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY10
12/02/2021400416858Open ↗
09/01/2021421630373Open ↗
07/16/2021421630373Open ↗
Showing 3 of 10 on file for this type
▸BISHYDRO FLOW TEST LETTER1
11/10/2018421663505Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
11/09/2018421663505Open ↗
▸Approvals, Objections & Sign-offs55
▸BISLETTERS - SUPPORTING DOCUMENTATION20
05/31/2022400416867Open ↗
05/31/2022400416867Open ↗
05/31/2022400416858Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
06/03/2021420214477Open ↗
01/26/2021421630373Open ↗
01/25/2021421630373Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
07/14/2022421630373Open ↗
01/25/2022421630373Open ↗
12/14/2021421630373Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/25/2026Q00734896-I1Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT21
12/02/2021400416858Open ↗
08/26/2020440408042Open ↗
07/14/2020421630373Open ↗
Showing 3 of 21 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
09/07/2022421630373Open ↗
11/21/2018421630373Open ↗
▸Filing & Intake Forms39
▸BISADDITIONAL INFORMATION20
03/11/2024421630373Open ↗
07/15/2022421630373Open ↗
03/22/2022421630373Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET9
08/23/2018421663505Open ↗
08/23/2018421663499Open ↗
05/24/2018421630373Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM6
09/07/2022421630373Open ↗
09/07/2022421630373Open ↗
12/19/2019421663499Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q00232012-P2Open ↗
▸Other Documents9
▸DOB NOWDHCR Document5
08/13/2026Q01026036-P1Open ↗
08/13/2026Q00232012-I1Open ↗
08/13/2026Q00232012-S2Open ↗
Showing 3 of 5 on file for this type
▸BISDHCR DOCUMENT2
09/17/2020420015487Open ↗
08/25/2020440408042Open ↗
▸BISTCO MUST BE PAID1
07/16/2020421630373Open ↗
▸BISTCO FEE DUE1
01/26/2021421630373Open ↗