← Back
BuildNYC
Elevator cooperative
140-15 HOLLY AVENUE
QUEENS · BIN 4117387
💬 Discuss this project
1960Year Built
7Stories
D4Building Class
R3-2Zoning
99,338 sfGross Floor Area
92Units
LL97 CoveredRent Stabilized18 Active Violations 16 unresolved · 2 paperwork only 1 likely answered 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: 140-15 Holly Ave Owners · 48,000 sf lot · 2.07 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBoiler replacementUnder Construction15p · 1 filing · 20 docs
BulkheadBuilding Alterations Energy Code Compliance1p · 1 filing · 4 docs
Floor 7Boiler replacementUnder Construction15p · 1 filing · 20 docs
Floor 6Boiler replacementUnder Construction15p · 1 filing · 20 docs
Floor 5Boiler replacementUnder Construction15p · 1 filing · 20 docs
Floor 4Boiler replacementUnder Construction15p · 1 filing · 20 docs
Floor 3Boiler replacementUnder Construction15p · 1 filing · 20 docs
Floor 2Boiler replacementUnder Construction15p · 1 filing · 20 docs
Floor 1Boiler replacementUnder Construction17p · 1 filing · 20 docs
CellarBoiler replacementUnder Construction20p · 2 filings · 20 docs
Site & exteriorBoiler replacementUnder Construction8p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Kiddie Child Care903/21/2026
140-15 Holly Ave Owners303/22/2026
Holly203/21/2026
K & M Associates203/21/2026
KSR103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Levin Engineering208/15/2024
Ospino Engineering102/10/2023
Merritt Engineering Consultants101/11/2023
New York & Company607/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jme Building Consulting203/21/2026
Merritt Engineering Consultant203/21/2026
New York & Company603/21/2026
Levin Engineering403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Marathon MechanicalPlumbing507/08/2026
Avarga ConstructionGeneral Contractor303/21/2026
Guaranteed Home ImprovemeGeneral Contractor303/21/2026
Bestco General Electric MainElectrical103/21/2026
Avarga ConstructionScaffold107/08/2026
Big Apple Fire Sprinkler Co IFire Protection107/08/2026
High Quality Electric ofElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Levin Engineering1267208/15/2024
Dean Mendez Architect, P8621101/11/2023
New York Engineering Associates851607/07/2022
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
08/28/2026
Co-op apartment 2M sold for $418,000
08/20/2026
Boiler inspection report filed
Initial · no defects · Accepted
05/11/2026
Permit renewed — Plumbing
Renewed without changes
Q00232012-I1-PL
05/08/2026
§ 27-2005, 27-2007, 27-2041.1 hmc, §238, § 309; § 107 (2) ( c) mdl and 28 rcny §25-171: replace or repair the self-closing doors that is missing or…
HPD violation · closed
298 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMarathon Mechanical05/11/2026
DOB NOWPlumbingPermit IssuedMarathon Mechanical04/17/2025
DOB NOWSprinklersSigned-offBig Apple Fire Sprinkler Co I07/10/2024
DOB NOWPlumbingPermit IssuedMarathon Mechanical04/11/2024
DOB NOWGeneral ConstructionSigned-offAvarga Construction04/12/2023
DOB NOWSidewalk ShedSigned-offAvarga Construction02/10/2023
DOB NOWBoiler EquipmentSigned-offNew York Heating07/19/2022
DOB NOWPlumbingPermit IssuedMarathon Mechanical06/22/2022
DOB NOWMechanical SystemsSigned-offGuaranteed Home Improveme08/12/2020
DOB NOWBoiler EquipmentSigned-offNew York Heating07/08/2020
DOB NOWPlumbingPermit IssuedMarathon Mechanical06/25/2020
BIS—ISSUEDCity Stone World06/28/2022
BISSPISSUEDJem Fire Prevention07/02/2019
BISPLISSUEDHP Services05/20/2019
BIS—ISSUEDCity Stone World10/25/2018
BISOTISSUEDCity Stone World04/23/2018
BISPLISSUEDCatman Plumbing05/25/2017
BISOTISSUEDJun's Construction05/19/2017
BISOTISSUEDKSR and Co01/07/2013
BISOTISSUEDKSR05/25/2012
BISOTISSUEDFutura Builders Group05/25/2011
BISOTISSUEDFutura Builders Group09/02/2010
BISEQISSUEDMetro Contracting NY07/15/2010
BISOTISSUEDR.M.R. Construction01/19/1994
BISOTISSUEDR.M.R. Construction01/19/1994
BISOTISSUEDR.M.R. Construction01/19/1994
BISFSISSUEDDuel Fuel Plumbing03/31/1993
BISBLISSUEDDual Fuel Plumbing10/30/1992
1 project · most recent 07/07/2022
Others
FiledStatusContractorScope
07/07/2022Signed-offGuaranteed Home ImprovemeOthers
1 project · most recent 08/15/2024
FiledStatusContractorScope
08/15/2024Signed-offBig Apple Fire Sprinkler Co I—
1 project · most recent 07/07/2022
Gas
FiledStatusContractorScope
07/07/2022Permit IssuedMarathon MechanicalGas
7 projects · most recent 01/26/2026
General Wiring
FiledStatusContractorScope
01/26/2026CompleteCL ElectricalGeneral Wiring
12/15/2025CompleteCL ElectricalGeneral Wiring
12/15/2025CompleteCL ElectricalGeneral Wiring
02/09/2023Permit IssuedHigh Quality Electric of—
12/04/2020Permit IssuedStar Electrical Contractors—
01/10/2019CompleteC & A ElectricalGeneral Wiring
09/10/2018CompleteAbsolute Advanced Electric—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/28/2024Tenant Protection Plan ComplianceDmitry Levinspecial
08/28/2024Post-installed AnchorsDmitry Levinspecial
08/28/2024Sprinkler SystemsDmitry Levinspecial
08/28/2024Fire-Resistant Penetrations and JointsDmitry Levinspecial
08/14/2024Post-installed AnchorsDmitry Levinspecial
08/14/2024Fire-Resistant Penetrations and JointsDmitry Levinspecial
08/14/2024Tenant Protection Plan Compliance—special
08/14/2024Sprinkler SystemsDmitry Levinspecial
07/08/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
07/08/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
07/07/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
07/07/2022FinalLOUIS ARENAprogress
07/07/2022Heating SystemsLOUIS ARENAspecial
07/07/2022HVAC and service water heating equipment LOUIS ARENAenergy_progress
07/07/2022Maintenance informationLOUIS ARENAenergy_progress
07/07/2022HVAC and service water heating system controls LOUIS ARENAenergy_progress
07/07/2022Mechanical SystemsLOUIS ARENAspecial
07/07/2022Chimneys and ventsLOUIS ARENAspecial
04/04/2022HVAC and service water heating system controls LOUIS ARENAenergy_progress
04/04/2022Maintenance informationLOUIS ARENAenergy_progress
04/04/2022HVAC and service water heating equipment LOUIS ARENAenergy_progress
04/04/2022Heating SystemsLOUIS ARENAspecial
04/04/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
04/04/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
01/03/2022FinalLOUIS ARENAprogress
Latest 25 of 28.
351 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account