ECB12/30/2025FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPARTMENT OF BUILDING FOR SUMMONS 35636484R., FILE A CERTIFICATE OF CORRECTION$6K due
DOB12/28/2022FULL VACATE ORDER-BLDG EXTERIOR APPEARS TO BE IN A SUBSTANTAILLY DETERIORATED CONDITION WITH MULTIPLE LARGE CRACKS IN FACADE AND PORTIONS OF THE FACADE IN DANGER OF FALLING ONTO THE PUBLIC SIDEWALK FDNY MARKINGS NOTE ROOF & FLR OPENINGS. BLDG IS UNSAFE TO BE OCCUPIED REMEDY:FULLY VACATE ENTIRE PREMISES @ 140-17 GUY R BREWER BLVD, QNS
DOB09/14/2022FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.
ECB03/21/2022FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER NOTED:FOLLOWING (1)@EXP1(FRONT LEFT) MULTIPLE CRACKS IN WALL (2)@EXP3 MISSING SIDING IN VARIOUS LOCATIONS (3)@EXP2&3 MISSING/BROKEN SIDING&WALLS SHEATHING W/HOLE$12K due
DOB02/02/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB11/24/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB11/08/2021FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED OBSERVED AT EXP1 FRONT OF BUILDING PARAPET LEVEL,THERE ARE CRACKS,MISSING BRICKSLEFT SIDE BOTTOM SECTION BULGING OUTWARD HOLE OPEN AT VARIOUS LOCATION$12K due
DOB09/29/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB09/01/2021FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE AT FRONT EXO1 THE BRICK AND STONE FACADE IS CRACKED BULGING OUTWARD AND IN SEVEREDISREPAIR.OPEN HOLE AT EXP4 AT GRADE LEVEL ALLOWING WEATHER AND WATER$12K due
DOB07/21/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB07/07/2021FAILURE TO MAINTAIN BUILDING CODE COMPLIANT MANNER.NOTED:AT FRONT BRICK FACADE IS DETACHING FROM THE STRUCTURE WOOD SOFFIT IS ROTTED.AT EXP#4,BIG HOLE IN THE RETAINING WALL.OPEN WALL ELEMENTS.PHOTO TAKEN.REMEDY$12K due
DOB06/24/2021FTM-EXP1 PARTLY DTACHD ABOVE MAIN ENTRNCE&WNDWS.EXP2 PARAPET SAGGING& LEANING/BULGING IN TWRDS ROOF@CENTR OF BLDG.ROOF SAGGING.EXP3 BOARD UP W/APPRX 3'X3'OPENING@ROOF LVL NEAR EXP2/3 CRNR.EXP3 INADEQUATE WEATHER PROOFING.OWNR RTAIN NYSPE-EVALU BLDG&PREPR+FILE RPAIR DWGS.BLDG RPAIR UNDR PRMT STRT BY 8/2/21 &COMPLT/SIGN OFF BY 9/10/21
ECB05/01/2021LEFT SIDE OF ROOF(EXPOSURE 2)IS CAVING IN ALSO FIRST STORY HAS PARTIALLY COLLAPSED,FACADE BRICK AT FRONT OF BUILDING IS DETACHING FROM STRUCTURE.REM:REPAIR OR REPLACE,SECURE & STABLILIZE THE BUILDING.$6K due
DOB08/18/2010V-DOB VIOLATION - ACTIVE
DOB01/20/1989JD
ECB09/19/1988FAILURE TO MAINTAIN DEFECT- 1ST STORY FL. JOISTS AT NORTH FOUNDATION WALL ARE ROTTED+DECAYED BEAM SIZE. REMEDY: OBTAIN A ARCHITECT ON LICENSED ENGINER + FILE WITH THIS DEPT. METHOD OF REPAIRS.Nothing owed — awaiting certificate of correction