← Back
BuildNYC
Two family frame
140-18 COOMBS STREET
QUEENS · BIN 4458011
💬 Discuss this project
1997Year Built
2Stories
B2Building Class
R3-1Zoning
—Gross Floor Area
2Units
Two family frame · 0.51 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoof-mounted solar panel installation1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering109/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation ServiceGeneral Contractor109/24/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272109/16/2026
Building Lifecycle
09/23/2026
Permit issued — Solar
Q01459407-I1-SL
09/16/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01459407-I1
09/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/16/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
09/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
7 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service09/23/2026
BISOTISSUEDAmergy Solar12/21/2016
BISPLISSUEDJ.r.piping/Bogart's PLG01/29/1998
BIS—ISSUEDRazi Construction08/14/1997
2 projects · most recent 09/16/2026
General Wiring
FiledStatusContractorScope
09/16/2026CompleteSunrun Solar Electl—
06/29/2018CompleteNoble Electrical Contracting CoGeneral Wiring
1 project · most recent 09/16/2026
FiledStatusContractorScope
09/16/2026Signed-offSunrun Installation Service—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/16/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/16/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
09/14/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
09/14/2026Energy Code Compliance InspectionsWalid Abdullaprogress
09/14/2026FinalWalid Abdullaprogress
27 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account