HPD06/05/2026§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD06/05/2026§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD06/05/2026§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
HPD06/05/2026§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
DOB12/02/2010FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB12/02/2010FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB10/15/2010NB OCCUPIED W/O A VALID CO NOTED:BLDG OCCUPIED AS PER JOB#401861829 HAS BEEN COMPLETED & CURRENTLY OCCUPIED.REM:OBTAIN FINAL CONothing owed — awaiting certificate of correction
ECB08/24/2010NEW BLDG OCCUPIED W/ A VALID C/O NB UNDER JOB #401861829 ALL WORK COMPLETED AND OCCUPIED THROUGHOUT APPLICATION NOT SIGNED OFF C/O NEVER OBTAINED REM: OBTAIN A VALID C/ONothing owed — awaiting certificate of correction
ECB08/24/2010RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES DOB RECORDS NB401861829 INDICATES PREMISES TO BE LEGALLY APPROVED FOR 2FAMILY 1ST & 2ND W/ CELLAR FOR ACCESSORNothing owed — awaiting certificate of correction
ECB08/24/2010WORK W/O A PERMIT WORK NOTED AT CELLAR LVL ERECTED FULL HEIGHT PARTITIONS CREATED ROOMS INSTALLED WATER & WASTE LINES FOR 3PC BATH TOILET SINK SHOWER A RESIDENTIAL SINK AND GAS LINE W/ STOVE AT KTCN REM: OBTAINNothing owed — awaiting certificate of correction