← Back
BuildNYC
Two family frame
140-38 QUINCE AVENUE
QUEENS · BIN 4118160
💬 Discuss this project
1930Year Built
2.5Stories
B2Building Class
R3XZoning
1,764 sfGross Floor Area
2Units
Two family frame · 2,525 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Basement1p · 1 filing · 5 docs
Sub-Basement1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hidamari Engineering Services503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM Engineering Services108/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PHS Consulting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RRP PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM Engineering Services8449108/02/2024
Building Lifecycle
10/28/2024
Signed off — Alteration
remove existing oil tank and oil boiler. install (2) new gas boilers and (2) gas water heaters in existing boiler room for existing 2-family house.
Q01088913-I1
09/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2024
Permit issued — Plumbing
Q01088913-I1-PL
08/02/2024
Filed — Alteration
remove existing oil tank and oil boiler. install (2) new gas boilers and (2) gas water heaters in existing boiler room for existing 2-family house.
Q01088913-I1
9 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRRP Plumbing08/12/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/30/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/30/2024HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
07/30/2024HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
07/30/2024HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
5 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account