ECB07/28/2026BC 3314.1 AT TIME OF INSPECTION OBSERVED WORKER AT ROOF LEVEL WORKING ON A SUPPORTED SCAFFOLD NOT IN THE STATE OF READINESS, NO TOEBOARDS, NO PLANKS TIED DOWN OR GUARDRAIL SYSTEM AS REQUIRED IN 3314.5, 3314.5.5$2K due
ECB07/17/2026OBSERVED: ACTIVE SITE CP PRESENT UPON INSPECTION NOTED FAILURE TO MAINTAIN HOUSEKEEPING,CARDBOARD, CEMENT AND DEBRIS MATERIALS IT NOTED IN DIFERENT LEVEL AND LOCATIONS CREATING HAZARDS CONDITION FOR WORKERS ON$2K due
ECB06/12/20266/11/2026 6:41PM WHILE PERFORMING A SEVERE WEATHER ADVISORY INSPECTION OBSERVED AN 8 STORY RESIDENTIAL BUILDING W/ NO CONSTRUCTION ACTIVITY UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALERT WAT$2K due
ECB02/02/2026ATOI OF A 8-STORY NEW BUILDING, BUILDING APPX. 27,653 SQ FT. SITE CLOSED AND THERE WAS NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALERT WATCHPERSON AND TO VERIFY COMPL$2K due
ECB04/08/2025JOB FENCE JOB#Q00220245 PERMIT EXPIRED ON 10/10/2022.@INACTIVE EXPIRED PERMIT 8STORY NB SITE OBSERVE JOB FENCE IN PLACE AT EXP#1 ADJACENT TO SIDEWALK AND I VERIFIED PER DEPARTMENTS RECORDS, THE JOB FENCE JOB#Q0$3K due
ECB04/03/202500000000000000000000000000000000000000000000$3K due
ECB09/27/2023AT TIME OF INSPECTION NO COMPETENT PERSON, OR ANYONE IN CHARGE ON SITE. ONLY 2 WORKERS THAT DID NOT SPEAK ENGLISH ON SITE. SIGNALED WORKER TO CALL "BOSS". WAITED 15 MINUTES, NO ONE SHOWED., PROVIDE APPROVED /AC$1 due
ECB06/20/2023AT THE TIME OF MY INSPECTION OF A ACTIVE PROPOSED 8 STORY CONSTRUCTION SITE I OBSERVED A ROOF UNPROTECTED AT EXPOSURE 3. UPON REVIEW OF THE APPROVED SSP ROOF PROTECTION( FOAM & WOOD) SHOULD OF BEEN PROVIDED AT$3K due
ECB02/04/2022CONSTRUCTION SITE JOB FENCE PERMIT EXPIRED ON 01-13-2022 #Q00220245.ATTIME OF INSPECTION ON AN ACTIVE 8 STORY NB PERMIT SITE IN SOE/FOUNDATION PHASE I OBSERVED JOB FENCE IN PLACE WHERE REQUIRED & UPON RESEARCH$625 due
ECB01/21/2022JOB FENCE NOT CONSTRUCTED/MAINTAINED PER CODE EXPOSING ADJOINING PROPERTY OCCUPANTS AT EXP.#4 140-40 SANFORD AVE TO FALL HAZARD OVER 6 FT INTO SITE.AT TIME OF INSPECTION IN RESPONSE TO COMPLAINT I OBSERVED INAC$12K due
ECB01/06/2022DURING EXCAVATION WORK IN PROGRESS AT EXPOSURE 2, EXISTING FOUNDATION WALL OF ADJACENT PROPERTY 42-04 UNION ST. EARTHWORK HAS PUNCTURED FOUNDATION WALL AND CREATED LARGE VERTICAL CRACK., SAFEGUARD PUBLIC AND PR$10K due
ECB01/05/2022FAILURE TO OBTAIN REGISTERED DESIGN PROFESSIONAL EVALUATION PRIOR TO USING EXISTING STRUCTURE(ADJOINING PROPERTIES FOUNDATION WALLS)TO SUPPORT SITES CONCRETE FOUNDATION CONSTRUCTION.AT TIME OF INSPECTION ON A A$12K due
ECB05/19/2026BC3307.6.4.10 AT THE TIME OF INSPECTION OF AN 8-STORY ACTIVE JOB SITE, THE SIDEWALK SHED AT EXP# 1 AND 2 WAS OBSERVED NOT MAINTAINED, WITH DETERIORATED MODSEAL THROUGHOUT THE STRUCTURE, CREATING A HAZARDOUS COHearing held — result not yet published$2K proposed
ECB02/25/2026ALTERNATE METHODS OF PROTECTION FOR ADJOINING PROPERTIES ARE CONTRARY TO SSP. OBS PIPESCAFFOLD INSTALLED @EXPOS 1,2,3 NOT SHOWN ON SSP PROVIDED. HOIST BEING INSTALLED @EXPO3 NOT SHOWN ON SSP. NEEDLEBEAMS INSTALHearing held — result not yet published$2K proposed
ECB02/25/20263314.3PIPE SCAFFOLDS CONTRARY TO PLANS &UNSAFE.EXPO1 TRUSS INSTALLED AT 2FLR LEVEL ON SF NOT SHOWN ON PLANS.SF @EXPO1 IS 2 LAYERS: 1 5FT SECTION & 1 3FT SECTION, THIS NOT SHOWN ON PLANS.AT ENDS OF SF @EXPO1 LARHearing held — result not yet published$2K proposed
ECB01/08/2019BC3301.2. FAILURE TO INSTITUTE AND MAINTAIN TEMPORARY EQUIPMENT MEASURES AND TEMPORARY CONSTRUCTION (OVERHEAD PROTECTION). AT THE TIME OF A 3 STORY BUILDIING, DEMOLITION OPERATION IN PROGRESS, I OBSERVED THAT TNothing owed — awaiting certificate of correction