← Back
BuildNYC
Elevator cooperative
Coop City
140 ALCOTT PLACE · Co-op City · BIN 2095394
💬 Discuss this project
1969Year Built
33Stories
D4Building Class
R6Zoning
13,540,113 sfGross Floor Area
10,948Units
LL97 CoveredRent Stabilized4,928 Active Violations 4,922 unresolved · 6 paperwork only 1 likely answered ▸FISP: SAFE
Elevator cooperative · Owner of record: Riverbay · 5,048,550 sf lot · 2.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsFacade and balcony restoration1 filing
Floor 1E-z Permit NY, LLC2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Riverbay3403/22/2026
E-Z Permit NY1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Enthink Engineers201/25/2023
Merritt Engineering Consultants111/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Merritt Engineering Consultant203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Exo IndustriesScaffold903/21/2026
Exo IndustriesGeneral Contractor303/21/2026
E-J Electric Installation CoElectrical103/22/2026
Express PL SWR & WTR APlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Dean Mendez Architect, P8621111/08/2022
Merritt Engineering Consulting460111/08/2022
Building Lifecycle
All (88)Filed (3)Permit Issued (4)Signed Off (3)Facade (FISP) (13)Violation (60)Special Inspection (5)
06/03/2026
Violation issued (HPD, closed)
A
06/03/2026
Violation issued (HPD, closed)
B
06/03/2026
Violation issued (HPD, closed)
B
07/15/2025
Violation issued (HPD, open)
B
07/15/2025
Violation issued (HPD, open)
B
07/15/2025
Violation issued (HPD, open)
B
04/16/2024
Violation issued (HPD, closed)
A
02/20/2024
Cycle 9 facade report submitted
02/20/2024
Cycle 9 facade inspection completed
02/16/2024
Cycle 9 facade report signed — SAFE
02/15/2024
Signed off — Alteration
FACADE AND BALCONY RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00619229-I1
02/07/2024
Signed off — Alteration
X00813230-I1
02/07/2024
Signed off — Alteration
X00813868-I1
01/10/2024
Permit issued — Sidewalk Shed
X00813230-I1-SH
01/05/2024
Violation issued (HPD, closed)
C
01/05/2024
Violation issued (HPD, closed)
B
01/05/2024
Violation issued (HPD, closed)
C
01/05/2024
Violation issued (HPD, closed)
C
01/05/2024
Violation issued (HPD, closed)
C
01/05/2024
Violation issued (HPD, closed)
C
07/19/2023
Violation issued (HPD, open)
A
04/24/2023
Permit issued — General Construction
X00619229-I1-GC
01/25/2023
Filed — Alteration
X00813868-I1
01/25/2023
Permit issued — Construction Fence
X00813868-I1-FN
01/17/2023
Filed — Alteration
X00813230-I1
01/17/2023
Permit issued — Sidewalk Shed
X00813230-I1-SH
11/08/2022
Filed — Alteration
FACADE AND BALCONY RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00619229-I1
11/08/2022
Special inspection requirement — Tenant Protection Plan Compliance
Dean Mendez
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
C
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
B
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
B
09/26/2022
Violation issued (HPD, open)
B
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
B
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
A
09/26/2022
Violation issued (HPD, open)
C
09/26/2022
Violation issued (HPD, open)
A
07/25/2022
Violation issued (HPD, open)
B
07/25/2022
Violation issued (HPD, open)
A
07/25/2022
Violation issued (HPD, open)
B
05/11/2022
Special inspection requirement — Masonry
Christopher Krepcio
05/11/2022
Special inspection requirement — Post-installed Anchors
Christopher Krepcio
05/11/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Krepcio
03/08/2022
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
I
10/26/2021
Special inspection requirement — Final
Christopher Krepcio
04/16/2021
Violation issued (HPD, closed)
A
09/12/2020
Violation issued (HPD, open)
A
09/12/2020
Violation issued (HPD, open)
B
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offExo Industries01/10/2024
DOB NOWGeneral ConstructionSigned-offExo Industries04/24/2023
DOB NOWConstruction FenceSigned-offExo Industries01/25/2023
DOB NOWSidewalk ShedSigned-offExo Industries01/17/2023
BISEQISSUEDRiverbay04/16/2010
BISEQISSUEDProto Construction & DVLP04/13/2010
BISEQISSUEDRiverbay04/12/2010
BISEQISSUEDRiverbay05/12/2009
BISEQISSUEDRiverbay05/12/2009
BISEQISSUEDProto Construction & Development10/23/2008
BISOTISSUEDProto Construction & Development09/26/2008
BISEQISSUEDRiverbay03/21/2008
BISOTISSUEDProto Construction & Development01/28/2008
BISEQISSUEDRiverbay01/18/2008
BISEQISSUEDProto Construction & Development04/25/2007
BISOTISSUEDProto Construction & Development04/05/2007
BISEQISSUEDRiverbay01/29/2007
BISEQISSUEDRiverbay01/29/2007
BISEQISSUEDRiverbay01/20/2006
BISEQISSUEDRiverbay01/20/2006
BISEQISSUEDRiverbay01/05/2005
BISEQISSUEDRiverbay01/05/2005
BISEQISSUEDRiverbay12/29/2003
BISEQISSUEDRiverbay12/29/2003
BISEQISSUEDRiverbay02/24/2003
BISEQISSUEDRiverbay02/24/2003
BISEQISSUEDRiverbay08/14/2002
BISOTISSUEDNab Construction05/26/1998
BISOTISSUEDNab Construction04/29/1997
BISMHISSUEDNab Construction04/28/1997
BISOTISSUEDNab Construction10/07/1996
4 projects · most recent 01/18/2023
General Wiring
FiledStatusContractorScope
01/18/2023CompleteRichard Neu—
09/23/2022CompleteE-J Electric Installation CoGeneral Wiring
07/16/2021Permit IssuedStar Electrical Contractors—
03/23/2021Permit IssuedStar Electrical Contractors—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/08/2022Tenant Protection Plan ComplianceDean Mendezspecial
05/11/2022MasonryChristopher Krepciospecial
05/11/2022Post-installed AnchorsChristopher Krepciospecial
05/11/2022Structural Stability – Alterations of existing buildingsChristopher Krepciospecial
10/26/2021FinalChristopher Krepcioprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026X00619229-I1Request digital key ↗
08/23/2026X00813230-I1Request digital key ↗
08/23/2026X00813868-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026X00619229-I1Open ↗
08/23/2026X00813230-I1Open ↗
08/23/2026X00813868-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026X00619229-I1Open ↗
09/02/2026X00619229-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026X00619229-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026X00619229-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026X00813230-I1Open ↗
08/13/2026X00813868-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/02/2022201118352Open ↗