← Back
Telephone utility
Co/vzt/14010 183rd St/springfield Gardens/ny
140 AVENUE · BIN 4280539
💬 Discuss this project
0Year Built
—Stories
U4Building Class
R3-2Zoning
0 sfGross Floor Area
0Units
1 Open Violation ▸FDNY Report ↗
Telephone utility · Owner of record: NYNEX · 23,595 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingOther
Floor 52p · 3 filings · 19 docs
Floor 4
Floor 31p · 1 filing · 12 docs
Floor 2
Floor 13p · 2 filings · 15 docs
Cellar6p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERIZON1807/08/2026
SPRING SCAFFOLDING LLC1503/22/2026
VERIZON WIRELESS303/22/2026
NYNEX303/22/2026
TISHMAN-1095 AVE OF THE AMERICAN103/21/2026
MANAGER OF CONSTRUCTION SERVICES403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WB ENGINEERS & CONSULTANTS PLLC505/05/2022
URBAN INTEGRATIONS410/12/2021
WFC ARCHITECTS104/23/2021
WILLIAM F. COLLINS ARCHITECTS104/09/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1003/21/2026
UNITED SAFETY CONSULTANTS403/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor603/21/2026
ON-TRAC CONSTRUCTION ASSOGeneral Contractor507/08/2026
TISHMAN INTERIORS CORPGeneral Contractor403/21/2026
GDO CONTRACTING CORPGeneral Contractor203/21/2026
FAST TRACK ELECTRIC CORPGeneral Contractor203/21/2026
PINTO & TEGER ELEC. CORP.Electrical103/22/2026
EKG PLUMBING & HEATING LLPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544605/05/2022
Building Lifecycle
All (114)Filed (11)Permit Issued (12)Signed Off (7)Violation (42)Inspection (7)Objection (16)Special Inspection (19)
11/13/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (FDNY_ORDER, closed)
09/09/2024
Violation issued (FDNY_NOV, closed)
07/31/2024
Violation issued (FDNY_NOV, closed)
01/16/2024
Signed off — Alteration
Replacement of Fuel Oil Piping. No change to existing remaining tank
Q00518050-I1
01/16/2024
Signed off — Alteration
Q00473012-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/20/2022
Signed off — Alteration
Removal and replacement of mechanical piping, ductwork and related mechanical equipment as shown on drawings filed herewith. No change to use, egress, or occupancy under this application
Q00480819-I1
09/12/2022
Signed off — Alteration
Filing for replacement of ductwork, fans, dry cooler, fuel oil pump, related to installation of Emergency Generator as shown on drawings filed herewith.
Q00503931-I1
09/02/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/02/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2022
Permit issued — General Construction
Q00473012-I1-GC
06/02/2022
Signed off — Alteration
Barrier and chainlink installed per plans, no change in use egress or occupancy
Q00582090-I1
06/02/2022
Permit issued — Plumbing
Q00503937-I1-PL
05/27/2022
Permit issued — Mechanical Systems
Q00480819-I1-MS
05/11/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
EUGENE BIFULCO
05/05/2022
Signed off — Alteration
PIPE SCAFFOLDING INSTALLED PER PLAN , NO CHANGE IN USE ,EGRESS OR OCCUPANCY
Q00573358-I1
05/05/2022
Filed — Alteration
Replacement of Fuel Oil Piping. No change to existing remaining tank
Q00518050-P1
05/04/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
EUGENE BIFULCO
04/22/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/08/2022
Permit issued — Boiler Equipment
Q00518050-I1-BE
03/03/2022
Permit issued — General Construction
Q00473012-I1-GC
10/20/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/20/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/15/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/14/2021
Special inspection requirement — Final
DANNY TRUJILLO
10/12/2021
Filed — Alteration
PIPE SCAFFOLDING INSTALLED PER PLAN , NO CHANGE IN USE ,EGRESS OR OCCUPANCY
Q00573358-P2
08/25/2021
Permit issued — Protection and Mechanical Methods
Q00582090-I1-PM
08/24/2021
Filed — Alteration
Barrier and chainlink installed per plans, no change in use egress or occupancy
Q00582090-I1
08/19/2021
Filed — Alteration
PIPE SCAFFOLDING INSTALLED PER PLAN , NO CHANGE IN USE ,EGRESS OR OCCUPANCY
Q00573358-P1
08/12/2021
Permit issued — Boiler Equipment
Q00518050-I1-BE
08/11/2021
Permit issued — Supported Scaffold
Q00573358-I1-SF
08/10/2021
Filed — Alteration
PIPE SCAFFOLDING INSTALLED PER PLAN , NO CHANGE IN USE ,EGRESS OR OCCUPANCY
Q00573358-I1
08/02/2021
Objection resolved — Addressed
07/30/2021
Permit issued — Mechanical Systems
Q00503931-I1-MS
06/29/2021
Permit issued — General Construction
Q00473012-I1-GC
06/28/2021
Objection raised — Energy
05/21/2021
Permit issued — Mechanical Systems
Q00480819-I1-MS
05/13/2021
Filed — Alteration
Replacement of Fuel Oil Piping. No change to existing remaining tank
Q00518050-I1
05/13/2021
Filed — Alteration
Filing for replacement of ductwork, fans, dry cooler, fuel oil pump, related to installation of Emergency Generator as shown on drawings filed herewith.
Q00503931-I1
05/13/2021
Special inspection requirement — Emergency and Standby Power Systems (Generator)
EUGENE BIFULCO
05/05/2021
Filed — Alteration
Removal & relocation of plumbing fixtures as shown on drawings filed herewith
Q00503937-I1
04/27/2021
Filed — Alteration
Removal and replacement of mechanical piping, ductwork and related mechanical equipment as shown on drawings filed herewith. No change to use, egress, or occupancy under this application
Q00480819-I1
04/23/2021
Filed — Alteration
Q00473012-I1
04/21/2021
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
04/21/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
04/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
04/21/2021
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
04/21/2021
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
04/14/2021
Special inspection requirement — Final
EUGENE BIFULCO
04/14/2021
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
04/12/2021
Signed off — Alteration
Verizon - Installation of telecommunication antenna sectors with related antennas and antenna components. Installation of GPS units and equipment cabinets on steel platform on the roof. All work is in compliance with TPPN 5/98. No change in occupancy, use or egress.
Q00098397-I1
03/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
03/04/2021
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
03/04/2021
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
03/04/2021
Special inspection requirement — Final
EUGENE BIFULCO
03/04/2021
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
03/04/2021
Special inspection requirement — Maintenance information
EUGENE BIFULCO
03/04/2021
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offON-TRAC CONSTRUCTION ASSO06/08/2022
DOB NOWPlumbingPermit IssuedEKG PLUMBING & HEATING LL06/02/2022
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP05/27/2022
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP03/08/2022
DOB NOWGeneral ConstructionSigned-offON-TRAC CONSTRUCTION ASSO03/03/2022
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC08/25/2021
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP08/12/2021
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC08/11/2021
DOB NOWMechanical SystemsSigned-offBROADWAY CONSTRUCTION GRO07/30/2021
DOB NOWGeneral ConstructionSigned-offON-TRAC CONSTRUCTION ASSO06/29/2021
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP05/21/2021
DOB NOWAntennaSigned-offFAST TRACK ELECTRIC09/29/2020
BISOTISSUEDH.M. HUGHES CO. INC02/06/2018
BISMHISSUEDH.M. HUGHES CO. INC02/06/2018
BISMHISSUEDH.M. HUGHES CO. INC03/29/2017
BISOTISSUEDH.M. HUGHES CO. INC03/29/2017
BISEQISSUEDSPRING SCAFFOLDING LLC12/08/2016
BISMHISSUEDWESTROCK MECHANICAL CORP11/28/2005
BISMHISSUEDTISHMAN CONSTRUCTION CORP08/03/2005
BISOTISSUEDTISHMAN CONSTRUCTION CORP01/12/2004
BISOTISSUEDTISHMAN CONSTRUCTION CORP12/03/2003
BISMHISSUEDYORK SCAFFOLD EQUIPMENT CORP.12/03/2003
BISOTISSUEDTISHMAN CONSTRUCTION CORP04/28/2003
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.03/28/2003
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.07/09/2002
BISOTISSUEDYORK SCAFFOLD EQUIPMENT CORP.01/24/2002
BISMHISSUEDYORK SCAFFOLD EQUIPMENT CORP.01/24/2002
BISMHISSUEDTISHMAN CONSTRUCTION CORP03/01/2001
BISOTISSUEDTISHMAN CONSTRUCTION CORP03/01/2001
BISMHISSUEDTISHMAN CONSTRUCTION CORP08/24/2000
BISOTISSUEDTISHMAN CONSTRUCTION CORP08/24/2000
BISMHISSUEDMADAD CONT CORP01/29/1998
BISOTISSUEDMADAD CONT CORP01/29/1998
BISOTISSUEDTISHMAN CONSTRUCTION CORP12/08/1997
BISPLISSUEDBROOK PLUMBING & HTG CORP10/17/1995
BISOTISSUEDLEHRER MCGOVERN BOVIS09/12/1995
BISMHISSUEDMONARCH CONSTRUCTION CORP05/03/1995
BISMHISSUEDM.H. KANE CONSTRUCTION INC.03/17/1993
BISSDISSUEDMETRO MECHANICAL GROUP IN03/05/1992
BISPLISSUEDMETRO MECHANICAL GROUP IN03/05/1992
+ 2 more permits on file
1 project · most recent 05/05/2021
Water/Sanitary
FiledStatusContractorScope
05/05/2021Permit IssuedEKG PLUMBING & HEATING LLWater/Sanitary
2 projects · most recent 06/28/2022
General Wiring
FiledStatusContractorScope
06/28/2022CompletePINTO & TEGER ELEC. CORP.General Wiring
08/19/2021CompletePINTO & TEGER ELEC. CORP.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/22/2022Pass-Final Boiler Equipment InspectionPassView ↗
10/20/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/15/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
05/11/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsEUGENE BIFULCOspecial
05/04/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsEUGENE BIFULCOspecial
10/14/2021FinalDANNY TRUJILLOprogress
05/13/2021Emergency and Standby Power Systems (Generator)EUGENE BIFULCOspecial
04/21/2021Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
04/21/2021HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
04/21/2021Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
04/21/2021Energy Code Compliance InspectionsEUGENE BIFULCOprogress
04/21/2021HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
04/14/2021FinalEUGENE BIFULCOprogress
04/14/2021Mechanical SystemsEUGENE BIFULCOspecial
03/04/2021Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
03/04/2021Mechanical SystemsEUGENE BIFULCOspecial
03/04/2021Energy Code Compliance InspectionsEUGENE BIFULCOprogress
03/04/2021FinalEUGENE BIFULCOprogress
03/04/2021Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
03/04/2021Maintenance informationEUGENE BIFULCOenergy_progress
03/04/2021HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
03/04/2021HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/27/2026Q00480819-I1Request digital key ↗
08/27/2026Q00503937-I1Request digital key ↗
08/27/2026Q00582090-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/27/2026Q00473012-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION5
05/18/2017421482283Open ↗
05/18/2017421482283Open ↗
05/12/2017421480203Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION5
02/07/2018421482283Open ↗
02/07/2018421482283Open ↗
04/11/2017421417746Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature12
08/28/2026Q00503931-I1Open ↗
08/28/2026Q00503931-I1Open ↗
08/28/2026Q00503931-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026Q00473012-I1Open ↗
08/27/2026Q00503937-I1Open ↗
08/27/2026Q00582090-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
02/07/2018421482283Open ↗
12/13/2017421407757Open ↗
05/18/2017421482283Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q00518050-I1Open ↗
09/02/2026Q00518050-P1Open ↗
08/28/2026Q00503931-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/09/2016421407757Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/07/2018421482283Open ↗
01/09/2017421417746Open ↗
12/09/2016421407757Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/27/2026Q00473012-I1Open ↗
08/27/2026Q00503937-I1Open ↗
08/13/2026Q00518050-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00098397-I1Open ↗
08/13/2026Q00480819-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/18/2017421482283Open ↗
04/11/2017421417746Open ↗
01/09/2017421417746Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00480819-I1Open ↗
08/13/2026Q00503931-I1Open ↗
08/13/2026Q00098397-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/13/2026Q00582090-I1Open ↗
08/13/2026Q00573358-P1Open ↗
08/13/2026Q00573358-P2Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/13/2017421407757Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
05/18/2017421482283Open ↗
05/18/2017421482283Open ↗
05/12/2017421480203Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET6
05/18/2017421482283Open ↗
05/18/2017421482283Open ↗
05/12/2017421480203Open ↗
Showing 3 of 6 on file for this type