← Back
Two family frame
140 BOWNE STREET
BRONX · BIN 2119011
💬 Discuss this project
1983Year Built
2Stories
B2Building Class
R3AZoning
1,030 sfGross Floor Area
2Units
0 Open Violations
Two family frame · 1,967 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Floor 23p · 1 filing · 8 docs
Floor 1
Cellar3p · 2 filings · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/02/2021$370K—Private party → Private party$359/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC212/18/2024
PATRICK E ALLEN ARCHITECT PC302/28/2023
TSL ARCHITECT,P.C.111/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
NOEL BUILDING CONSULTING INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KEVIN PAINTING & HOME IMPGeneral Contractor107/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
JOHNNY'S P&H CONTRAC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272212/18/2024
MARCH CHADWICK, ARCHITECT2253302/28/2023
Building Lifecycle
All (33)Filed (6)Permit Issued (3)Signed Off (3)Violation (2)Inspection (3)Objection (2)Special Inspection (14)
08/14/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01143937-I1
12/18/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01143937-P1
12/18/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/18/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
12/18/2024
Special inspection requirement — Final
Walid Abdulla
12/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/17/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
12/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/17/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/17/2024
Special inspection requirement — Final
Walid Abdulla
12/17/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/27/2024
Permit issued — Solar
X01143937-I1-SL
11/22/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01143937-I1
02/05/2024
Violation issued (ECB, closed)
Construction
02/05/2024
Violation issued (ECB, closed)
Zoning
04/07/2023
Signed off — Alteration
X00753062-I1
04/07/2023
Signed off — Alteration
FILING TO INSTALL NEW TOILET AND LAV AND UTILITY CLOSET AT CELLAR, NEW WINDOW AT FIRST FL AND ENLARGE EXISTING WINDOW AT SECOND FL. FILING TO LEGALIZE CONCRETE SLAB AND GRAVEL PITS AT FRONT YARDS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X00746657-I1
03/02/2023
Special inspection requirement — Final
MARCH CHADWICK
03/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARCH CHADWICK
02/28/2023
Filed — Alteration
FILING TO INSTALL NEW TOILET AND LAV AND UTILITY CLOSET AT CELLAR, NEW WINDOW AT FIRST FL AND ENLARGE EXISTING WINDOW AT SECOND FL. FILING TO LEGALIZE CONCRETE SLAB AND GRAVEL PITS AT FRONT YARDS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X00746657-P1
01/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/28/2022
Permit issued — Plumbing
X00753062-I1-PL
10/26/2022
Permit issued — General Construction
X00746657-I1-GC
08/18/2022
Filed — Alteration
X00753062-I1
08/14/2022
Objection resolved — Addressed
06/22/2022
Objection raised — Admin
06/21/2022
Filed — Alteration
FILING TO INSTALL NEW TOILET AND LAV AND UTILITY CLOSET AT CELLAR, NEW WINDOW AT FIRST FL AND ENLARGE EXISTING WINDOW AT SECOND FL. FILING TO LEGALIZE CONCRETE SLAB AND GRAVEL PITS AT FRONT YARDS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X00746657-I1
11/10/2021
Filed — Alteration
X00627174-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC11/27/2024
DOB NOWPlumbingSigned-offJOHNNY NANHU10/28/2022
DOB NOWGeneral ConstructionSigned-offKEVIN PAINTING & HOME IMP10/26/2022
1 project · most recent 11/22/2024
General Wiring
FiledStatusContractorScope
11/22/2024Permit IssuedSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
12/18/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
12/18/2024Energy Code Compliance InspectionsWalid Abdullaprogress
12/18/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/18/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/18/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
12/18/2024FinalWalid Abdullaprogress
12/17/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/17/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
12/17/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/17/2024Energy Code Compliance InspectionsWalid Abdullaprogress
12/17/2024FinalWalid Abdullaprogress
12/17/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
03/02/2023FinalMARCH CHADWICKprogress
03/02/2023Fire-Resistant Penetrations and JointsMARCH CHADWICKspecial
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026X00627174-I1Request digital key ↗
08/24/2026X00746657-P1Request digital key ↗
08/24/2026X00753062-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026X00746657-I1Open ↗
09/01/2026X01143937-P1Open ↗
09/01/2026X01143937-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026X00746657-I1Open ↗
09/01/2026X01143937-P1Open ↗
09/01/2026X01143937-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026X00627174-I1Open ↗
08/24/2026X00746657-P1Open ↗
08/24/2026X00746657-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X00746657-P1Open ↗
08/20/2026X01143937-I1Open ↗
08/15/2026X00746657-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01143937-I1Open ↗