← Back
BuildNYC
Two family frame
140 BOWNE STREET
BRONX · BIN 2119011
💬 Discuss this project
1983Year Built
2Stories
B2Building Class
R3AZoning
1,030 sfGross Floor Area
2Units
0 Active Violations
Two family frame · 1,967 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar panel installation4p · 1 filing · 19 docs
Floor 2Enclose existing boiler room, new toilet, new window12p · 1 filing · 10 docs
Floor 1Solar panel installation10p · 2 filings · 20 docs
CellarInstall new toilet and lav at cellar13p · 2 filings · 12 docs
Site & exteriorEnclose existing boiler room, new toilet, new window9p · 1 filing · 10 docs
Filed — no permit issuedSite Paving Correction2p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/02/2021$370K—Private party → Private party$359/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering212/18/2024
Patrick E. Allen Architect302/28/2023
TSL Architect111/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun203/21/2026
MJB Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kevin Painting & Home Impspecialty_contractor107/08/2026
Sunrun Installation Servicespecialty_contractor107/08/2026
Johnny's P&HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272212/18/2024
March Chadwick, Architect2253302/28/2023
Building Lifecycle
08/14/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01143937-I1
12/18/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01143937-P1
12/18/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Walid Abdulla
12/18/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
35 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service11/27/2024
DOB NOWPlumbingSigned-offJohnny Nanhu10/28/2022
DOB NOWGeneral ConstructionSigned-offKevin Painting & Home Imp10/26/2022
1 project · most recent 11/22/2024
General Wiring
FiledStatusContractorScope
11/22/2024Permit IssuedSunrun Solar ElectlGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
12/18/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
12/18/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
12/18/2024Energy Code Compliance InspectionsWalid Abdullaprogress
12/18/2024FinalWalid Abdullaprogress
12/18/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/18/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/17/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
12/17/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Walid Abdullaspecial
12/17/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/17/2024Energy Code Compliance InspectionsWalid Abdullaprogress
12/17/2024FinalWalid Abdullaprogress
12/17/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/02/2023FinalMARCH CHADWICKprogress
03/02/2023Fire-Resistant Penetrations and JointsMARCH CHADWICKspecial
02/24/2023FinalMARCH CHADWICKprogress
02/24/2023Fire-Resistant Penetrations and JointsMARCH CHADWICKspecial
33 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account