← Back
BuildNYC
Elevator cooperative
140 CLAREMONT AVENUE
MANHATTAN · Morningside Heights · BIN 1059848
💬 Discuss this project
1905Year Built
6Stories
D4Building Class
R8Zoning
36,623 sfGross Floor Area
61Units
LL97 CoveredRent Stabilized7 Active Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 140 Claremont Owners · 8,850 sf lot · 4.14 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWeber-farhat Realty3p · 1 filing · 11 docs
Floor 6Unit 6A13p · 1 filing · 8 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
CellarWeber-farhat Realty17p · 3 filings · 20 docs
Site & exteriorWeber-farhat Realty9p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
140 Claremont Owners1603/22/2026
Weber-Farhat Realty1407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Colombo Architectural Studio209/08/2025
Bazini Engineering907/08/2024
Green Design103/16/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Parsons ConstructionScaffold207/08/2026
Budget Plumbing & HeatingPlumbing207/03/2026
Dual Fuel Plumbing & HeatingPlumbing207/08/2026
Norlin Electrical ContractorsElectrical103/21/2026
Dual Fuel CompanyGeneral Contractor107/08/2026
RJ InteriorsGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Colombo Architectural Stu4930108/07/2025
Bazini Engineering1808607/08/2024
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
07/06/2026
Signed off — Alteration
Replacement of fixtures in connection with general construction application.
M01255339-S1
06/29/2026
Boiler inspection report filed
Initial · no defects · Accepted
06/01/2026
Co-op apartment 5K sold for $340,000
05/11/2026
Signed off — Alteration
Replacement of fixtures in connection with general construction application.
M01255339-I1
146 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRJ Interiors09/18/2025
DOB NOWPlumbingSigned-offBudget Plumbing & Heating09/17/2025
DOB NOWBoiler EquipmentSigned-offAmerican Boiler & Welding07/25/2024
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating09/27/2023
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating07/21/2023
DOB NOWMechanical SystemsSigned-offDual Fuel Company07/20/2023
DOB NOWSidewalk ShedPermit IssuedParsons Construction10/13/2020
DOB NOWSidewalk ShedPermit IssuedParsons Construction03/17/2020
BISOTISSUEDOM General Contractors Co06/16/2020
BISOTISSUEDTitan Restoration06/28/2012
BISOTISSUEDMilton Garay Construction02/14/2007
BISPLISSUEDPeter Miceli Plumbing02/14/2007
BISEQISSUEDAdvanced Installation11/07/2005
BISEQISSUEDColgate Scaffolding09/09/2005
BISOTISSUEDBellet Construction Co09/01/2005
BISOTISSUEDJ.M. Group Contracting09/17/2002
1 project · most recent 09/08/2025
Water/Sanitary
FiledStatusContractorScope
09/08/2025Signed-offBudget Plumbing & HeatingWater/Sanitary
4 projects · most recent 10/22/2026
General Wiring
FiledStatusContractorScope
10/22/2026Permit IssuedShuir Electrical ContractorsGeneral Wiring
04/13/2026CompleteJoseph Weinstein ElectricGeneral Wiring
02/17/2023CompleteE-J Electric Installation CoGeneral Wiring
03/16/2020Permit IssuedRichard Neu—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/17/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/04/2025FinalYahaira Volquez Colomboprogress
08/04/2025Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
06/25/2024Tenant Protection Plan ComplianceJoseph Bazinispecial
04/11/2024Tenant Protection Plan ComplianceJoseph Bazinispecial
04/09/2024Tenant Protection Plan Compliance—special
11/14/2023Mechanical SystemsJoseph Bazinispecial
11/14/2023FinalJoseph Baziniprogress
11/14/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
11/14/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
11/14/2023HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
11/14/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
11/14/2023Chimneys and ventsJoseph Bazinispecial
11/13/2023Tenant Protection Plan Compliance—special
11/10/2023FinalJoseph Baziniprogress
11/10/2023Tenant Protection Plan Compliance—special
11/10/2023Mechanical SystemsJoseph Bazinispecial
11/10/2023Chimneys and ventsJoseph Bazinispecial
08/14/2023Tenant Protection Plan Compliance—special
70 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account