Elevator cooperative
140 CLAREMONT AVENUE
MANHATTAN · Morningside Heights · BIN 1059848
💬 Discuss this project
1905Year Built
6Stories
D4Building Class
R8Zoning
36,623 sfGross Floor Area
61Units
LL97 CoveredRent Stabilized7 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 140 CLAREMONT OWNERS LTD · 8,850 sf lot · 4.14 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipment
Roof3p · 1 filing · 11 docs
Floor 613p · 1 filing · 8 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar17p · 3 filings · 20 docs
Site & exterior9p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
140 CLAREMONT OWNERS1603/22/2026
WEBER-FARHAT REALTY1407/08/2026
PARSONS CONSTRUCTION507/08/2026
TOTAL MANAGEMENT NYC504/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLOMBO ARCHITECTURAL STUDIO PC209/08/2025
BAZINI ENGINEERING, P.C.907/08/2024
GREEN DESIGN103/16/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARSONS CONSTRUCTION INCGeneral Contractor207/08/2026
BUDGET PLBG & HTG LLCPlumbing207/03/2026
DUAL FUEL PLUBING & HTINGPlumbing207/08/2026
NORMAN TCHERNOFFElectrical103/21/2026
DUAL FUEL COMPANY LLCGeneral Contractor107/08/2026
RJ INTERIORS CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLOMBO ARCHITECTURAL STU4930108/07/2025
BAZINI ENGINEERING, P.C.1808607/08/2024
Building Lifecycle
All (119)Filed (12)Permit Issued (8)Signed Off (6)Facade (FISP) (17)Violation (41)Inspection (11)Objection (6)Special Inspection (18)
07/06/2026
Signed off — Alteration
Replacement of fixtures in connection with general construction application.
M01255339-S1
05/11/2026
Signed off — Alteration
Replacement of fixtures in connection with general construction application.
M01255339-I1
02/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/22/2025
Violation issued (HPD, closed)
C
10/22/2025
Violation issued (HPD, closed)
C
10/22/2025
Violation issued (HPD, closed)
C
10/20/2025
Violation issued (HPD, closed)
C
10/20/2025
Violation issued (HPD, closed)
C
09/18/2025
Permit issued — General Construction
M01255339-I1-GC
09/17/2025
Permit issued — Plumbing
M01255339-S1-PL
09/08/2025
Filed — Alteration
Replacement of fixtures in connection with general construction application.
M01255339-S1
09/05/2025
Objection resolved — Addressed
09/03/2025
Objection raised — Energy
09/03/2025
Objection raised — Scope
09/03/2025
Objection resolved — Addressed
08/07/2025
Filed — Alteration
Replacement of fixtures in connection with general construction application.
M01255339-I1
08/04/2025
Special inspection requirement — Final
Yahaira Volquez Colombo
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
05/28/2025
Violation issued (HPD, open)
B
05/28/2025
Violation issued (HPD, open)
A
05/28/2025
Violation issued (HPD, open)
B
05/28/2025
Violation issued (HPD, open)
B
05/28/2025
Violation issued (HPD, open)
B
05/28/2025
Violation issued (HPD, open)
A
05/28/2025
Violation issued (HPD, open)
A
01/02/2025
Signed off — Alteration
REMOVE EXISTING FUEL OIL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00897662-S1
12/23/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/08/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/04/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/04/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/04/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
07/25/2024
Signed off — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY AS PER PLANS. INSTALL NEW EXHAUST VENT AND AIR INTAKE VENT FOR NEW HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00897682-I1
07/25/2024
Signed off — Alteration
REMOVE EXISTING FUEL OIL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00897662-I1
07/25/2024
Signed off — Alteration
INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. INSTALL NEW HOT WATER HEATER AND NEW HOT WATER STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00898517-I1
07/25/2024
Permit issued — Boiler Equipment
M00897662-S1-BE
07/08/2024
Filed — Alteration
REMOVE EXISTING FUEL OIL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00897662-S1
06/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
04/17/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/11/2024
Filed — Alteration
INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. INSTALL NEW HOT WATER HEATER AND NEW HOT WATER STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00898517-P3
04/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
04/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
04/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/14/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
11/14/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Joseph Bazini
11/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
11/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
11/14/2023
Special inspection requirement — Chimneys and vents
Joseph Bazini
11/14/2023
Special inspection requirement — Mechanical Systems
Joseph Bazini
11/14/2023
Special inspection requirement — Final
Joseph Bazini
11/13/2023
Filed — Alteration
REMOVE EXISTING FUEL OIL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00897662-P1
11/13/2023
Filed — Alteration
INSTALL NEW GAS PIPING AND GAS METER FOR REPLACEMENT GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. INSTALL NEW HOT WATER HEATER AND NEW HOT WATER STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00898517-P2
11/13/2023
Filed — Alteration
INSTALL NEW CHIMNEY LINER IN EXISTING MASONRY CHIMNEY AS PER PLANS. INSTALL NEW EXHAUST VENT AND AIR INTAKE VENT FOR NEW HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00897682-P1
11/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
11/10/2023
Special inspection requirement — Chimneys and vents
Joseph Bazini
11/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
11/10/2023
Special inspection requirement — Mechanical Systems
Joseph Bazini
11/10/2023
Special inspection requirement — Final
Joseph Bazini
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRJ INTERIORS CORP09/18/2025
DOB NOWPlumbingSigned-offBUDGET PLBG & HTG LLC09/17/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING07/25/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING09/27/2023
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING07/21/2023
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC07/20/2023
DOB NOWSidewalk ShedPermit IssuedPARSONS CONSTRUCTION INC10/13/2020
DOB NOWSidewalk ShedPermit IssuedPARSONS CONSTRUCTION INC03/17/2020
BISOTISSUEDOM GENERAL CONTRACTORS CO06/16/2020
BISOTISSUEDTITAN RESTORATION INC06/28/2012
BISOTISSUEDMILTON GARAY CONSTRUCTION02/14/2007
BISPLISSUEDPETER MICELI PLUMBING02/14/2007
BISEQISSUEDADVANCED INSTALL INC11/07/2005
BISEQISSUEDCOLGATE SCAFFOLDING09/09/2005
BISOTISSUEDBELLET CONSTRUCTION CO.IN09/01/2005
BISOTISSUEDJ.M. GROUP CONTR., LLC09/17/2002
1 project · most recent 09/08/2025
Water/Sanitary
FiledStatusContractorScope
09/08/2025Signed-offBUDGET PLBG & HTG LLCWater/Sanitary
3 projects · most recent 04/13/2026
General Wiring
FiledStatusContractorScope
04/13/2026CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
02/17/2023CompleteE-J ELEC. INSTALLATION COGeneral Wiring
03/16/2020Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
02/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2024Pass-Final Boiler Equipment InspectionPassView ↗
11/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/04/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/04/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/04/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
04/17/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/04/2025FinalYahaira Volquez Colomboprogress
08/04/2025Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
06/25/2024Tenant Protection Plan ComplianceJoseph Bazinispecial
04/11/2024Tenant Protection Plan ComplianceJoseph Bazinispecial
04/09/2024Tenant Protection Plan Compliance—special
11/14/2023HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
11/14/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsJoseph Bazinispecial
11/14/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
11/14/2023Tenant Protection Plan ComplianceJoseph Bazinispecial
11/14/2023Chimneys and ventsJoseph Bazinispecial
11/14/2023Mechanical SystemsJoseph Bazinispecial
11/14/2023FinalJoseph Baziniprogress
11/13/2023Tenant Protection Plan Compliance—special
11/10/2023Chimneys and ventsJoseph Bazinispecial
11/10/2023Tenant Protection Plan Compliance—special
11/10/2023Mechanical SystemsJoseph Bazinispecial
11/10/2023FinalJoseph Baziniprogress
08/14/2023Tenant Protection Plan Compliance—special
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
08/29/2026M00897682-P1Request digital key ↗
08/29/2026M00897682-I1Request digital key ↗
08/29/2026M00898517-P3Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00333125-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
08/27/2019140866249Open ↗
06/22/2012121123774Open ↗
▸BISWORK PERMIT APPLICATION2
06/16/2020140866249Open ↗
07/03/2012121123774Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/29/2026M00897682-P1Open ↗
08/29/2026M00897682-I1Open ↗
08/29/2026M00898517-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026M00897662-S1Open ↗
09/23/2026M00897662-I1Open ↗
09/23/2026M00897662-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026M00897662-I1Open ↗
09/01/2026M00897682-I1Open ↗
08/26/2026M01255339-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION2
07/03/2012121123774Open ↗
06/22/2012121123774Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/27/2019140866249Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/27/2019140866249Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/27/2019140866249Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
08/27/2019140866249Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00333125-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/29/2026M00897682-P1Open ↗
08/29/2026M00897682-I1Open ↗
08/29/2026M00898517-P3Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
06/22/2012121123774Open ↗
08/27/2019140866249Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
06/22/2012121123774Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/27/2019140866249Open ↗
▸BISTR8: Energy Code Progress Inspections1
06/25/2012121123774Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/27/2019140866249Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/27/2019140866249Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
06/22/2012121123774Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/27/2019140866249Open ↗
06/22/2012121123774Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
06/22/2012121123774Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/27/2019140866249Open ↗