← Back
Two family frame
140 DAWSON CIRCLE
STATEN ISLAND · New Springville-Willowbrook-Bulls Head-Travis · BIN 5036325
💬 Discuss this project
1970Year Built
2Stories
B2Building Class
R3XZoning
2,010 sfGross Floor Area
2Units
Two family frame · 5,499 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI208/10/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSS LLCGeneral Contractor107/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841208/10/2026
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/13/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
S01426034-I1
08/10/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
S01426034-P1
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
08/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
08/10/2026
Special inspection requirement — Final
ROBERT MASONE
08/10/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
07/09/2026
Permit issued — Solar
S01426034-I1-SL
07/06/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
S01426034-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC07/09/2026
1 project · most recent 07/02/2026
FiledStatusContractorScope
07/02/2026CompleteNY SOLAR ELECTRICAL LLC—
1 project · most recent 08/10/2026
FiledStatusContractorScope
08/10/2026Signed-offNYSS LLC38 panels, 16.72 kw
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/10/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
08/10/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
08/10/2026Energy Code Compliance InspectionsROBERT MASONEprogress
08/10/2026FinalROBERT MASONEprogress
08/10/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026S01426034-P1Request digital key ↗
08/16/2026S01426034-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026S01426034-P1Open ↗
08/16/2026S01426034-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026S01426034-P1Open ↗
08/27/2026S01426034-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026S01426034-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026S01426034-P1Open ↗
08/16/2026S01426034-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/16/2026S01426034-I1Open ↗