140 E 62ND STREET
MANHATTAN · BIN 1041991
💬 Discuss this project
1910Year Built
5Stories
O2Building Class
R8BZoning
30,946 sfGross Floor Area
3Units
LL97 Covered0 Open Violations
Office only, 2-6 stories · Owner of record: ANDREW W MELLON FOUNDATION · 12,049 sf lot · 2.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipment
Permit Issued — active, not yet Signed-off
Roof15p · 3 filings · 20 docs
Floor 4Under Construction97p · 4 filings · 20 docs
Floor 3Under Construction101p · 4 filings · 20 docs
Floor 2Under Construction98p · 5 filings · 20 docs
Floor 1Under Construction104p · 4 filings · 20 docs
CellarUnder Construction112p · 5 filings · 20 docs
BasementUnder Construction41p · 2 filings · 20 docs
Sub-BasementUnder Construction55p · 2 filings · 20 docs
1 job · most recent 01/02/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/02/2024Permit IssuedYORKE CONSTRUCTION CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Aaon RN-009-3-0 195,000 BTU · Rooftop Unit ×1
Carrier 30RC011 9 tons · Air Cooled Chiller ×1
Ventilation
N/A NA 200 CFM · Exhaust Fan ×1
1 job · most recent 03/03/2026
FiledStatusContractorScope
03/03/2026Signed-offUNITED PLBG MECHANICAL IN114 heads
1 job · most recent 03/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/03/2026Permit IssuedCITY/SUBURBAN PLBG CORPGas, Storm, Water/Sanitary
4 jobs · most recent 06/24/2025
General Wiring
FiledStatusContractorScope
06/24/2025Permit IssuedTRANSEL ELEV. & ELEC. INCGeneral Wiring
05/02/2025Permit IssuedFRED GELLER ELEC'L INC.General Wiring
04/01/2024Permit IssuedILLUMINOUS ELECTRIC CORP.—
10/25/2021Permit IssuedTOP SHELF ELECTRIC CORP—
2 jobs · most recent 04/15/2026
Steel Concrete
FiledStatusContractorScope
04/15/2026Permit IssuedYORKE CONSTRUCTION CORPSteel, Concrete
07/01/2024Permit IssuedYORKE CONSTRUCTION CORP2 scope_items
4 jobs · most recent 04/21/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
04/21/2026Permit IssuedSOLID DEVELOPMENT GROUPScaffold
10/28/2025Permit IssuedPLATINUM SERVICES NY LLCFence, Scaffold, Sidewalk Shed
11/18/2021Permit IssuedUNIVERSAL SYSTEMS INCSidewalk Shed
10/28/2021Permit IssuedUNIVERSAL SYSTEMS INCScaffold
Building Lifecycle
All (209)Filed (31)Permit Issued (44)Signed Off (8)Violation (13)Inspection (11)Objection (72)Special Inspection (30)
09/21/2026
Permit issued — Construction Fence
M01024103-I1-SH
09/18/2026
Permit issued — General Construction
M00955745-I1-GC
08/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/06/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.THE ROOF PROTECTION AT THE EAST NEIGHBOR'S ROOF.
M01149979-S2
07/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/29/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.THE ROOF PROTECTION AT THE EAST NEIGHBOR'S ROOF.
M01149979-S1
06/22/2026
Permit issued — Construction Fence
M01024103-I1-SH
06/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2026
Permit issued — Sprinklers
M00962341-I1-PL
05/22/2026
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Electrical motors and elevators
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Exterior lighting power
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Insulation placement and R values
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Air barrier - visual inspection
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Fenestration areas
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Fenestration air leakage
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Duct leakage testing, insulation and design
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Sprayed fire-resistant materials
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Masonry
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Combustible Exterior Wall Coverings
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Lighting controls
MAURICIO ANDRADE
05/22/2026
Special inspection requirement — Interior lighting power
MAURICIO ANDRADE
04/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
04/21/2026
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01088017-P1
04/20/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
04/15/2026
Filed — Alteration CO
The Proposed project is adding this portion (146 E 62nd St.) to the existing Mellon foundation building (136-144 E 62nd St.). New Rear extension and elevator and stair bulkhead and change use.
M00955745-P3
04/01/2026
Permit issued — Sprinklers
M00962341-I1-EW-SP
03/30/2026
Permit issued — Sidewalk Shed
M01024103-I1-FN
03/30/2026
Permit issued — Supported Scaffold
M01024103-I1-SF
03/30/2026
Permit issued — Construction Fence
M01024103-I1-SH
03/27/2026
Permit issued — Sprinklers
M00962341-S1-EW-SP
03/26/2026
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
03/26/2026
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
03/24/2026
Permit issued — Boiler Equipment
M00964424-I1-BE
03/17/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.THE ROOF PROTECTION AT THE EAST NEIGHBOR'S ROOF.
M01149979-I1
03/03/2026
Filed — Alteration
NEW REAR EXTENSION AND ELEVATOR AND STAIR BULKHEAD; COMBINE WITH OTHER BUILDINGS ON THE LOT AND CHANGE USE FROM RESIDENTIAL TO OFFICES. NO DWELLING UNITS IN THE BUILDING WILL BE OCCIPIED DURING CONSTRUCTION. PL and SP work here by filed.
M00962341-P2
03/02/2026
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
03/02/2026
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
01/29/2026
Signed off — Alteration
Underpinning in conjunction with M00955745
M00975892-S1
01/28/2026
Signed off — Alteration
Underpinning in conjunction with M00955745
M00975892-I1
01/28/2026
Signed off — Alteration
Interior demo and renovation of building, No change in use, egress, or occupancy.
M00892183-I1
12/30/2025
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.THE ROOF PROTECTION AT THE EAST NEIGHBOR'S ROOF.
M01149979-P2
12/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/25/2025
Filed — Alteration CO
The Proposed project is adding this portion (146 E 62nd St.) to the existing Mellon foundation building (136-144 E 62nd St.). New Rear extension and elevator and stair bulkhead and change use.
M00955745-P2
11/25/2025
Special inspection requirement — Combustible Exterior Wall Coverings
MAURICIO ANDRADE
11/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/17/2025
Permit issued — Protection and Mechanical Methods
M01149979-S1-PMM
11/17/2025
Permit issued — Supported Scaffold
M01149979-I1-SF
Latest 60 of 209 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY2109/22/2026
ANDREW W MELLON FOUNDATION8409/19/2026
UNIVERSAL SYSTEMS907/08/2026
TWG103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS103/21/2026
SPRING SCAFFOLDING LLC1003/21/2026
J CALLAHAN CONSULTING2803/21/2026
EUROCELT EXPEDITING, INC603/21/2026
HOWARD I SHAPIRO ASSOCIATES403/21/2026
KD DESIGNS303/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YORKE CONSTRUCTION CORPGeneral Contractor2109/19/2026
PLATINUM SERVICES NY LLCGeneral Contractor1709/22/2026
SPRING SCAFFOLDING LLCGeneral Contractor1207/08/2026
CITY/SUBURBAN PLBG CORPPlumbing307/08/2026
UNITED PLBG MECHANICAL INCFire Protection307/08/2026
UNIVERSAL SYSTEMS INCGeneral Contractor207/08/2026
SOLID DEVELOPMENT GROUP IGeneral Contractor107/08/2026
TRANSEL ELEV. & ELEC. INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665204/21/2026
PSI AGENCY INC.2541604/15/2026
MUESER RUTLEDGE CONSULTIN977202/14/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedPLATINUM SERVICES NY LLC09/21/2026
DOB NOWGeneral ConstructionPermit IssuedYORKE CONSTRUCTION CORP09/18/2026
DOB NOWConstruction FencePermit IssuedPLATINUM SERVICES NY LLC06/22/2026
DOB NOWSprinklersPermit IssuedCITY/SUBURBAN PLBG CORP06/01/2026
DOB NOWSprinklersSigned-offUNITED PLBG MECHANICAL INC04/01/2026
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC03/30/2026
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC03/30/2026
DOB NOWConstruction FencePermit IssuedPLATINUM SERVICES NY LLC03/30/2026
DOB NOWSprinklersSigned-offUNITED PLBG MECHANICAL INC03/27/2026
DOB NOWBoiler EquipmentPermit IssuedCITY/SUBURBAN PLBG CORP03/24/2026
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC11/17/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC11/17/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC11/17/2025
DOB NOWSupported ScaffoldPermit IssuedSOLID DEVELOPMENT GROUP09/30/2025
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP09/29/2025
DOB NOWStructuralPermit IssuedYORKE CONSTRUCTION CORP09/16/2025
DOB NOWStructuralPermit IssuedYORKE CONSTRUCTION CORP09/16/2025
DOB NOWFoundationPermit IssuedYORKE CONSTRUCTION CORP09/16/2025
DOB NOWFoundationSigned-offYORKE CONSTRUCTION CORP09/16/2025
DOB NOWGeneral ConstructionPermit IssuedYORKE CONSTRUCTION CORP07/22/2025
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC03/31/2025
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC03/31/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC03/31/2025
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC02/06/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC12/20/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC12/19/2024
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC12/19/2024
DOB NOWPlumbingPermit IssuedCITY/SUBURBAN PLBG CORP12/18/2024
DOB NOWGeneral ConstructionSigned-offYORKE CONSTRUCTION CORP10/04/2024
DOB NOWSprinklersPermit IssuedUNITED PLBG MECHANICAL INC09/27/2024
DOB NOWFoundationPermit IssuedYORKE CONSTRUCTION CORP08/29/2024
DOB NOWStructuralPermit IssuedYORKE CONSTRUCTION CORP08/29/2024
DOB NOWStructuralPermit IssuedYORKE CONSTRUCTION CORP08/14/2024
DOB NOWFoundationSigned-offYORKE CONSTRUCTION CORP08/08/2024
DOB NOWSupport of ExcavationSigned-offYORKE CONSTRUCTION CORP08/07/2024
DOB NOWGeneral ConstructionPermit IssuedYORKE CONSTRUCTION CORP08/07/2024
DOB NOWMechanical SystemsPermit IssuedYORKE CONSTRUCTION CORP08/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC08/05/2024
DOB NOWConstruction FencePermit IssuedPLATINUM SERVICES NY LLC04/03/2024
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC04/03/2024
+ 4 more permits on file
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
08/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/27/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/09/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/09/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 113
DateRequirementInspectorRole
05/22/2026Fenestration areasMAURICIO ANDRADEenergy_progress
05/22/2026Insulation placement and R valuesMAURICIO ANDRADEenergy_progress
05/22/2026Fenestration air leakageMAURICIO ANDRADEenergy_progress
05/22/2026Duct leakage testing, insulation and designMAURICIO ANDRADEenergy_progress
05/22/2026Exterior lighting powerMAURICIO ANDRADEenergy_progress
05/22/2026Lighting controlsMAURICIO ANDRADEenergy_progress
05/22/2026Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
05/22/2026Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
05/22/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
05/22/2026Combustible Exterior Wall CoveringsMAURICIO ANDRADEspecial
05/22/2026Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
05/22/2026Sprayed fire-resistant materialsMAURICIO ANDRADEspecial
05/22/2026MasonryMAURICIO ANDRADEspecial
05/22/2026HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
05/22/2026Fenestration and door U-factor and product ratingsMAURICIO ANDRADEenergy_progress
05/22/2026Interior lighting powerMAURICIO ANDRADEenergy_progress
05/22/2026Electrical motors and elevatorsMAURICIO ANDRADEenergy_progress
05/22/2026Maintenance informationMAURICIO ANDRADEenergy_progress
05/22/2026Air barrier - visual inspectionMAURICIO ANDRADEenergy_progress
05/22/2026HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
05/22/2026HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
04/23/2026Post-installed AnchorsKarol Zdancewiczspecial
04/20/2026Post-installed AnchorsKarol Zdancewiczspecial
03/26/2026Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
03/26/2026Sprinkler SystemsMAURICIO ANDRADEspecial
Latest 25 of 113.
▾Documents — 171 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
09/03/2026M00619896-I1Request digital key ↗
09/03/2026M00619886-I1Request digital key ↗
09/03/2026M00619886-P1Request digital key ↗
Showing 3 of 31 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026M00955745-P1Open ↗
08/13/2026M00955745-I1Open ↗
08/13/2026M00955745-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026M00955745-P2Open ↗
08/13/2026M00955745-I1Open ↗
08/13/2026M00955745-P1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications67
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/03/2026M00619886-P1Open ↗
09/03/2026M00619886-I1Open ↗
08/25/2026M01149979-S1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/25/2026M00975892-S1Open ↗
09/25/2026M00975892-S1Open ↗
09/01/2026M00964618-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/25/2026M00975892-S1Open ↗
09/01/2026M00964618-I1Open ↗
09/01/2026M00955745-S2Open ↗
Showing 3 of 17 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWFDNY: Letter of No Objection3
08/13/2026M00962341-P1Open ↗
08/13/2026M00962341-P2Open ↗
08/13/2026M00962341-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026M00955745-I1Open ↗
08/13/2026M00955745-P1Open ↗
08/13/2026M00955745-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form11
08/18/2026M00962341-S1Open ↗
08/18/2026M00962341-I1Open ↗
08/17/2026M00955745-S3Open ↗
Showing 3 of 11 on file for this type
▸Approvals, Objections & Sign-offs24
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter24
08/25/2026M01149979-I1Open ↗
08/25/2026M01149979-P2Open ↗
08/25/2026M01149979-S3Open ↗
Showing 3 of 24 on file for this type
▸Other Documents23
▸DOB NOWPlot Diagram6
08/13/2026M00955745-I1Open ↗
08/13/2026M00955745-S2Open ↗
08/13/2026M00955745-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026M00955745-P1Open ↗
08/13/2026M00955745-I1Open ↗
08/13/2026M00955745-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026M00955745-P2Open ↗
08/13/2026M00955745-P1Open ↗
08/13/2026M00955745-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026M00955745-P1Open ↗
08/17/2026M00955745-I1Open ↗
08/17/2026M00955745-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProof of Historic Building3
08/13/2026M00964424-I1Open ↗
08/13/2026M00892183-I1Open ↗
08/13/2026M00964618-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00975892-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M01006416-I1Open ↗