← Back
Office only, 2-6 stories
140 E 62ND STREET
MANHATTAN · BIN 1083879
💬 Discuss this project
1910Year Built
5Stories
O2Building Class
R8BZoning
30,946 sfGross Floor Area
3Units
LL97 Covered0 Open Violations
Office only, 2-6 stories · Owner of record: ANDREW W MELLON FOUNDATION · 12,049 sf lot · 2.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 7 docs
Cellar1p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ANDREW W MELLON FOUNDATION1103/22/2026
UNIVERSAL SYSTEMS INC.503/22/2026
ELSYIUM CONSTRUCTION203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALTIERISEBORWIEBER LLC209/25/2024
NEW AGE ENGINEERING PLLC106/06/2024
NAVI STRUCTURAL ENGINEERING, PLLC110/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING403/21/2026
EUROCELT EXPEDITING, INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE METRO GROUP, INCGeneral Contractor303/21/2026
UNIVERSAL SYSTEMS INCGeneral Contractor303/21/2026
PATRIOT ELECTRIC CORPElectrical203/22/2026
CITY/SUBURBAN PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.254209/25/2024
NEW AGE ENGINEERING PLLC7746106/06/2024
Building Lifecycle
All (21)Filed (4)Permit Issued (3)Signed Off (3)Violation (3)Inspection (1)Special Inspection (7)
06/08/2026
Signed off — Alteration
M00619756-I1
11/04/2024
Signed off — Alteration
This Alteration is being filed for the replacement of boiler & hot water pump. There are no change in use, egress or occupancy under this application.
M01014687-I1
10/22/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
10/08/2024
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
09/25/2024
Filed — Alteration
This Alteration is being filed for the replacement of boiler & hot water pump. There are no change in use, egress or occupancy under this application.
M01014687-P1
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
09/25/2024
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
07/25/2024
Signed off — Alteration
INSTALL NEW CHIMNEY LINER AND EXTENSION AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00936586-I1
06/06/2024
Filed — Alteration
INSTALL NEW CHIMNEY LINER AND EXTENSION AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00936586-I1
06/06/2024
Permit issued — Mechanical Systems
M00936586-I1-MS
05/09/2024
Permit issued — Boiler Equipment
M01014687-I1-BE
03/18/2024
Filed — Alteration
This Alteration is being filed for the replacement of boiler & hot water pump. There are no change in use, egress or occupancy under this application.
M01014687-I1
09/20/2023
Special inspection requirement — Mechanical Systems
Stephen Shishko
09/20/2023
Special inspection requirement — Chimneys and vents
Stephen Shishko
09/20/2023
Special inspection requirement — Final
Stephen Shishko
11/01/2021
Permit issued — Supported Scaffold
M00619756-I1-SF
10/27/2021
Filed — Alteration
M00619756-I1
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTHE METRO GROUP, INC06/06/2024
DOB NOWBoiler EquipmentSigned-offCITY/SUBURBAN PLBG CORP05/09/2024
DOB NOWSupported ScaffoldSigned-offUNIVERSAL SYSTEMS INC11/01/2021
2 projects · most recent 10/26/2021
General Wiring
FiledStatusContractorScope
10/26/2021CompletePATRIOT ELECTRIC CORPGeneral Wiring
07/21/2021CompletePATRIOT ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/22/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/08/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
10/08/2024Heating SystemsMAURICIO ANDRADEspecial
09/25/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/25/2024Heating SystemsMAURICIO ANDRADEspecial
09/20/2023Mechanical SystemsStephen Shishkospecial
09/20/2023Chimneys and ventsStephen Shishkospecial
09/20/2023FinalStephen Shishkoprogress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/03/2026M00619756-I1Request digital key ↗
08/27/2026M01014687-I1Request digital key ↗
08/27/2026M01014687-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00619756-I1Open ↗
08/27/2026M01014687-I1Open ↗
08/27/2026M01014687-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M01014687-I1Open ↗
09/01/2026M00936586-I1Open ↗
09/01/2026M00936586-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026M00936586-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026M01014687-I1Open ↗
08/27/2026M01014687-P1Open ↗
08/13/2026M00936586-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026M01014687-P1Open ↗
08/13/2026M01014687-I1Open ↗
08/13/2026M00936586-I1Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026M01014687-I1Open ↗
08/13/2026M01014687-P1Open ↗