← Back
Office only, 2-6 stories
140 E 62ND STREET
MANHATTAN · BIN 1041992
💬 Discuss this project
1910Year Built
5Stories
O2Building Class
R8BZoning
30,946 sfGross Floor Area
3Units
LL97 Covered0 Open Violations
Office only, 2-6 stories · Owner of record: ANDREW W MELLON FOUNDATION · 12,049 sf lot · 2.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 4 docs
Cellar1p · 2 filings · 16 docs
3 jobs · most recent 08/17/2023
General Wiring
FiledStatusContractorScope
08/17/2023CompletePATRIOT ELECTRIC CORPGeneral Wiring
10/25/2021CompleteTOP SHELF ELECTRIC CORP—
07/21/2021CompletePATRIOT ELECTRIC CORP—
Building Lifecycle
All (23)Filed (6)Permit Issued (4)Signed Off (3)Violation (5)Inspection (1)Special Inspection (4)
06/08/2026
Signed off — Alteration
M00619873-I1
11/01/2024
Signed off — Alteration
This Alteration application is being filed for the replacement of boilers and hot water pumps. There are no change in use, egress or occupancy.
M01014026-I1
10/11/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/04/2024
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
10/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
09/25/2024
Filed — Alteration
This Alteration application is being filed for the replacement of boilers and hot water pumps. There are no change in use, egress or occupancy.
M01014026-P1
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
09/25/2024
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
07/25/2024
Signed off — Alteration
M00936615-I1
06/06/2024
Filed — Alteration
M00936615-I1
06/06/2024
Permit issued — Mechanical Systems
M00936615-I1-MS
05/09/2024
Permit issued — Boiler Equipment
M01014026-I1-BE
03/18/2024
Filed — Alteration
This Alteration application is being filed for the replacement of boilers and hot water pumps. There are no change in use, egress or occupancy.
M01014026-I1
11/18/2021
Filed — Alteration
M00619873-P1
10/28/2021
Permit issued — Supported Scaffold
M00619858-I1-SF
10/28/2021
Permit issued — Sidewalk Shed
M00619873-I1-SH
10/27/2021
Filed — Alteration
M00619873-I1
10/27/2021
Filed — Alteration
M00619858-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNIVERSAL SYSTEMS1007/08/2026
ANDREW W MELLON FOUNDATION1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALTIERISEBORWIEBER LLC209/25/2024
NEW AGE ENGINEERING PLLC106/06/2024
NAVI STRUCTURAL ENGINEERING, PLLC311/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING403/21/2026
EUROCELT EXPEDITING, INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNIVERSAL SYSTEMS INCGeneral Contractor407/08/2026
THE METRO GROUP, INCGeneral Contractor303/21/2026
CITY/SUBURBAN PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.254209/25/2024
NEW AGE ENGINEERING PLLC7746106/06/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTHE METRO GROUP, INC06/06/2024
DOB NOWBoiler EquipmentSigned-offCITY/SUBURBAN PLBG CORP05/09/2024
DOB NOWSupported ScaffoldPermit IssuedUNIVERSAL SYSTEMS INC10/28/2021
DOB NOWSidewalk ShedSigned-offSHAMAS CONTRACTING CO.INC10/28/2021
BISPLISSUEDNYC WATER MAIN WORKS,INC.07/19/1999
BISSPISSUEDN.K. PLBG & HTG CORP04/28/1999
BISOTISSUEDGEORGE & SON CONTRACTING04/22/1999
BISOTISSUEDGEORGE & SON CONTRACTING03/09/1999
BISPLISSUEDD.C.PLMB INC01/19/1999
BISOTISSUEDGEORGE & SON CONTRACTING01/11/1999
BISPLISSUEDD.C PLG INC10/01/1998
BISOTISSUEDGEORGE & SON CONTRACTING09/23/1998
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/11/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/04/2024Heating SystemsMAURICIO ANDRADEspecial
10/04/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/25/2024Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/25/2024Heating SystemsMAURICIO ANDRADEspecial
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026M00619873-P1Request digital key ↗
09/03/2026M00619873-I1Request digital key ↗
09/03/2026M00619858-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026M00619873-I1Open ↗
09/03/2026M00619873-P1Open ↗
09/03/2026M00619858-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M01014026-I1Open ↗
08/24/2026M01014026-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026M01014026-P1Open ↗
08/27/2026M01014026-I1Open ↗
08/27/2026M00936615-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/27/2026M00936615-I1Open ↗
08/13/2026M01014026-I1Open ↗
08/13/2026M01014026-P1Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026M01014026-I1Open ↗
08/13/2026M01014026-P1Open ↗