| Owner | Filings | Most Recent |
|---|---|---|
| NRCF 2GC | 1,018 | 07/08/2026 |
| Two Grand Central Tower | 179 | 03/21/2026 |
| BXP | 128 | 03/21/2026 |
| 2GC Owners | 101 | 10/13/2026 |
| Grand Regent | 24 | 03/21/2026 |
| Fifth Avenue Acquisition | 10 | 03/21/2026 |
| Harry Macklowe Real Estate Co | 7 | 03/21/2026 |
| McGraw Hudson Construction | 2 | 03/21/2026 |
| Rockwood Capital | 1 | 03/22/2026 |
| Papyrus | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/04/2025 | $273.0M | — | NRCF 2GC → 2GC Owners | $434/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| Fogarty Finger Architecture | 21 | 09/28/2026 |
| Latimer Sommers & Associates | 17 | 08/31/2026 |
| Aztec Associates | 9 | 08/31/2026 |
| Ospino Engineering | 2 | 08/26/2026 |
| AMA Consulting Engineers | 69 | 08/20/2026 |
| Env Architects | 6 | 07/22/2026 |
| Spectorgroup Architecture | 2 | 04/20/2026 |
| Rigid Structural Design | 3 | 04/17/2026 |
| Thornton Tomasetti | 4 | 03/03/2026 |
| Gilsanz Murray Steficek | 1 | 04/21/2025 |
| Laurence G. Jones Architects | 1 | 01/27/2025 |
| Tuller/McNealus/Feld | 1 | 09/09/2024 |
| PS Engineers | 3 | 04/11/2024 |
| TPG Architecture | 1 | 12/19/2023 |
| Tohfaz Uddin PE | 1 | 08/04/2023 |
| Bazini Engineering | 1 | 08/19/2022 |
| Kaback Enterprises | 1 | 05/19/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| Codegreen | 86 | 03/21/2026 |
| Paul Fusco Consulting | 22 | 03/21/2026 |
| PS Engineers | 8 | 03/21/2026 |
| Hierarch-E | 2 | 03/21/2026 |
| Custodio Consulting | 6 | 03/21/2026 |
| Beam Living | 3 | 03/21/2026 |
| Spring Scaffolding | 2 | 03/21/2026 |
| Dynamic Building Consultants | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Core Four Construction | General Contractor | 29 | 07/08/2026 |
| Gannon Contracting | General Contractor | 24 | 07/08/2026 |
| Folor | General Contractor | 19 | 09/22/2026 |
| A&A Plumbing | Plumbing | 7 | 07/08/2026 |
| DK Construction One | General Contractor | 6 | 03/21/2026 |
| Ceprine Construction | Scaffold | 5 | 10/06/2026 |
| Premier Sanitation | General Contractor | 5 | 07/08/2026 |
| CM Plumbing | Plumbing | 5 | 07/23/2026 |
| Sound Refrigeration & Air | specialty_contractor | 5 | 07/08/2026 |
| P & D Mechanical | Fire Protection | 5 | 09/15/2026 |
| James E Fitzgerald | General Contractor | 4 | 07/08/2026 |
| Icon Interiors | General Contractor | 4 | 07/08/2026 |
| Briggs Services | General Contractor | 4 | 09/03/2026 |
| Spring Scaffolding | Scaffold | 3 | 04/09/2026 |
| Standard Fire Supp | Fire Protection | 3 | 07/08/2026 |
| F&S Contracting Group | General Contractor | 3 | 03/21/2026 |
| Sean Coakley P & H | Plumbing | 3 | 07/08/2026 |
| Bedrock Mechanical | Fire Protection | 3 | 07/08/2026 |
| Full Capacity Fire | Fire Protection | 2 | 07/08/2026 |
| Absolute Electrical Contg | Electrical | 2 | 03/21/2026 |
| Polyhase Electrical Sol | Electrical | 2 | 03/21/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 2 | 03/21/2026 |
| Brennan Operating | General Contractor | 2 | 03/21/2026 |
| SPK/Lewis Construction | General Contractor | 2 | 03/21/2026 |
| Tribute Restoration | Scaffold | 2 | 07/08/2026 |
| A + Sprinkler | Fire Protection | 2 | 07/08/2026 |
| Bedrock Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Impact Plumbing | Plumbing | 2 | 10/10/2026 |
| Liberty Pipe | Fire Protection | 2 | 07/08/2026 |
| Mega Plumbing | Fire Protection | 2 | 07/08/2026 |
| Mega Plumbing | Plumbing | 2 | 07/08/2026 |
| Sean Coakley P & H | Fire Protection | 2 | 07/08/2026 |
| Soh Par Sprinkler | Fire Protection | 2 | 07/08/2026 |
| Tristate Plumbing Services | Plumbing | 2 | 07/08/2026 |
| A.T. Elect'l Construction | Electrical | 1 | 03/22/2026 |
| Chapman & Chapman Electrical | Electrical | 1 | 03/21/2026 |
| Penn Electl Contracting | Electrical | 1 | 03/21/2026 |
| Broadway Electric | Electrical | 1 | 03/21/2026 |
| Denko Mechanical | Fire Protection | 1 | 07/08/2026 |
| Dependable Mechanical | Fire Protection | 1 | 07/08/2026 |
| DPH Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Five Borough NYC | Fire Protection | 1 | 10/10/2026 |
| High Quality Electric of | Electrical | 1 | 03/21/2026 |
| Geoffrey A. Lagas & Associates | Plumbing | 1 | 07/08/2026 |
| Tower Fire Protection | Fire Protection | 1 | 07/08/2026 |
| K.M.D. Mechanical 1443 | Fire Protection | 1 | 08/12/2026 |
| Pharaohs Restoration | specialty_contractor | 1 | 04/09/2026 |
| Usis Electric | Electrical | 1 | 03/22/2026 |
| Commercial Electric Cont | Electrical | 1 | 03/22/2026 |
| Tribute Restoration | specialty_contractor | 1 | 04/09/2026 |
| P. E. Stone | Electrical | 1 | 03/21/2026 |
| Sage Electrical Contracting | Electrical | 1 | 03/21/2026 |
| William C. Gerakaris P&H | Plumbing | 1 | 07/08/2026 |
| Commercial Electric Cont | Electrical | 1 | 03/21/2026 |
| Absolute Special Insptn | Fire Protection | 1 | 07/08/2026 |
| A&P Remodeling Co | Fire Protection | 1 | 07/08/2026 |
| Armon Mechanical | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Milrose Consultants | 2003 | 58 | 09/28/2026 |
| Twig Special Inspections | 885 | 27 | 08/31/2026 |
| Codegreen | 510 | 4 | 08/20/2026 |
| Howard L Zimmerman Architects | 1712 | 1 | 03/03/2026 |
| Laurence G. Jones Architects | 5560 | 1 | 01/27/2025 |
| AR Consulting Engineer P | 4054 | 3 | 04/11/2024 |
| Crosscheck Inspection Services | 544 | 1 | 07/26/2023 |
| Special Inspection Services | 1200 | 19 | 09/01/2022 |
| Bazini Engineering | 1808 | 1 | 08/19/2022 |
| Stracar Special Inspectio | 229 | 1 | 04/22/2020 |
| Custodio Consulting | 1835 | 1 | 04/17/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | Five Borough NYC | 10/09/2026 |
| DOB NOW | Plumbing | Permit Issued | Impact Plumbing | 10/09/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Ceprine Construction | 10/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Folor | 09/21/2026 |
| DOB NOW | Sprinklers | Permit Issued | P & D Mechanical | 09/14/2026 |
| DOB NOW | General Construction | Permit Issued | Briggs Services | 09/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Briggs Services | 09/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | K.M.D. Mechanical 1443 | 08/11/2026 |
| DOB NOW | General Construction | Permit Issued | Folor | 07/31/2026 |
| DOB NOW | Plumbing | Permit Issued | CM Plumbing | 07/22/2026 |
| DOB NOW | Plumbing | Permit Issued | CM Plumbing | 07/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | P & D Mechanical | 07/20/2026 |
| DOB NOW | Plumbing | Permit Issued | CM Plumbing | 07/17/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Folor | 07/15/2026 |
| DOB NOW | General Construction | Permit Issued | Folor | 07/15/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Ceprine Construction | 07/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | P & D Mechanical | 06/22/2026 |
| DOB NOW | General Construction | Signed-off | Folor | 06/09/2026 |
| DOB NOW | General Construction | Permit Issued | Folor | 06/08/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Folor | 06/08/2026 |
| DOB NOW | General Construction | Signed-off | Folor | 06/03/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Folor | 06/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | P & D Mechanical | 06/02/2026 |
| DOB NOW | General Construction | Signed-off | Premier Sanitation | 05/26/2026 |
| DOB NOW | Plumbing | Permit Issued | CM Plumbing | 05/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | P & D Mechanical | 04/24/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Folor | 04/23/2026 |
| DOB NOW | General Construction | Permit Issued | Folor | 04/23/2026 |
| DOB NOW | Plumbing | Permit Issued | CM Plumbing | 04/23/2026 |
| DOB NOW | General Construction | Permit Issued | Folor | 04/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Folor | 04/22/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Ceprine Construction | 04/17/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Ceprine Construction | 04/17/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | Ceprine Construction | 04/17/2026 |
| DOB NOW | Plumbing | Signed-off | Bedrock Plumbing & Heating | 02/20/2026 |
| DOB NOW | Sprinklers | Signed-off | Bedrock Mechanical | 02/20/2026 |
| DOB NOW | General Construction | Signed-off | Folor | 02/19/2026 |
| DOB NOW | General Construction | Signed-off | Premier Sanitation | 02/19/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Folor | 02/19/2026 |
| DOB NOW | General Construction | Permit Issued | Pharaohs Restoration | 02/17/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/16/2026 | Permit Issued | Folor | Heating and Air Conditioning Systems | Heat / Cool Trane GEHV036 1,140 CFM · Rooftop Unit ×1 |
| 06/04/2026 | Permit Issued | Folor | Others | Other Greenheck SP-A110 70 CFM · Exhaust Fan ×1 |
| 12/12/2025 | Signed-off | Gannon Contracting | Air Conditioning Systems | Cooling |
| 11/08/2024 | Signed-off | Gannon Contracting | Air Conditioning Systems | Cooling Above Air SCW-018S-7-000-00-00-00-RD 24,400 BTU · Fan Coil Indoor ×1 |
| 05/29/2024 | Permit Issued | Gannon Contracting | Others | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/31/2026 | Permit Issued | Five Borough NYC | — |
| 07/30/2026 | Permit Issued | K.M.D. Mechanical 1443 | — |
| 07/22/2026 | — | — | — |
| 07/16/2026 | Permit Issued | CMP Piping | — |
| 06/04/2026 | Permit Issued | CMP Piping | 178 heads |
| 06/01/2026 | Permit Issued | CMP Piping | 56 heads |
| 05/13/2026 | Permit Issued | CMP Piping | 202 heads |
| 04/07/2026 | Permit Issued | CMP Piping | — |
| 02/17/2026 | Signed-off | Bedrock Mechanical | — |
| 12/30/2025 | Signed-off | A&P Remodeling Co | 40 heads |
| 04/21/2025 | Signed-off | Full Capacity Fire | — |
| 11/08/2024 | — | — | 8 heads |
| 01/13/2021 | Permit Issued | Tower Fire Protection | — |
| 09/03/2019 | Signed-off | Denko Mechanical | 66 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/31/2026 | Permit Issued | Impact Plumbing | Water/Sanitary |
| 07/16/2026 | Permit Issued | CM Plumbing | Water/Sanitary |
| 06/04/2026 | Permit Issued | CM Plumbing | Water/Sanitary |
| 06/01/2026 | Permit Issued | CM Plumbing | Water/Sanitary |
| 05/13/2026 | Permit Issued | CM Plumbing | Water/Sanitary |
| 04/07/2026 | Permit Issued | CM Plumbing | Water/Sanitary |
| 02/17/2026 | Signed-off | Bedrock Plumbing & Heating | Water/Sanitary |
| 12/30/2025 | Signed-off | Impact Plumbing | Water/Sanitary |
| 04/21/2025 | Signed-off | Armon Mechanical | Water/Sanitary |
| 11/08/2024 | Signed-off | William C. Gerakaris P&H | Water/Sanitary |
| 01/14/2021 | Signed-off | Sean Coakley P & H | Water/Sanitary |
| 09/03/2019 | Signed-off | Geoffrey A. Lagas & Associates | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/20/2026 | Permit Issued | Polyhase Electrical Sol | General Wiring |
| 09/22/2026 | Permit Issued | High Quality Electric of NYC | General Wiring |
| 09/22/2026 | Permit Issued | High Quality Electric of NYC | General Wiring |
| 08/12/2026 | Permit Issued | High Quality Electric of NYC | — |
| 07/29/2026 | Complete | Polyhase Electrical Sol | General Wiring |
| 07/29/2026 | Complete | Polyhase Electrical Sol | General Wiring |
| 07/29/2026 | Complete | Polyhase Electrical Sol | General Wiring |
| 05/20/2026 | Permit Issued | Top Notch Electric | General Wiring |
| 04/14/2026 | Complete | Polyhase Electrical Sol | General Wiring |
| 04/14/2026 | Permit Issued | Polyhase Electrical Sol | General Wiring |
| 02/24/2026 | Complete | Polyhase Electrical Sol | General Wiring |
| 02/12/2026 | Complete | Polyhase Electrical Sol | General Wiring |
| 02/11/2026 | Permit Issued | High Quality Electric of NYC | — |
| 09/30/2025 | Complete | Mikoma Electric | General Wiring |
| 02/14/2025 | Complete | On Point Electric | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/13/2026 | Permit Issued | CMP Piping | Concrete |
| 04/21/2025 | Signed-off | Armon Mechanical | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/17/2026 | Permit Issued | Ceprine Construction | Scaffold |
| 04/16/2026 | Permit Issued | Ceprine Construction | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Permit Issued | Pharaohs Restoration | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/16/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/27/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/25/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/19/2026 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 03/26/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/21/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/20/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/28/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/12/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/17/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 11/06/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/04/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/20/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/09/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/18/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/09/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/05/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/10/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/10/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/23/2026 | Fire-Resistance Rated Construction | Christopher Drutjons | progress |
| 09/23/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 08/31/2026 | Lighting controls | Dave Wall | energy_progress |
| 08/31/2026 | Final | Dave Wall | progress |
| 08/31/2026 | Fire-Resistant Penetrations and Joints | Dave Wall | special |
| 08/31/2026 | Sprinkler Systems | Dave Wall | special |
| 08/31/2026 | Post-installed Anchors | Dave Wall | special |
| 08/31/2026 | Final | Dave Wall | progress |
| 08/31/2026 | Post-installed Anchors | Dave Wall | special |
| 08/31/2026 | Fire-Resistant Penetrations and Joints | Dave Wall | special |
| 08/31/2026 | Mechanical Systems | Dave Wall | special |
| 08/31/2026 | Interior lighting power | Dave Wall | energy_progress |
| 08/31/2026 | Fire-Resistant Penetrations and Joints | Dave Wall | special |
| 08/27/2026 | Fire-Resistance Rated Construction | Christopher Drutjons | progress |
| 08/27/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 08/19/2026 | HVAC-R and service water heating system controls | HATIM ELSAID | energy_progress |
| 08/19/2026 | Duct leakage testing, insulation and design | HATIM ELSAID | energy_progress |
| 08/19/2026 | Energy Code Compliance Inspections | HATIM ELSAID | progress |
| 08/19/2026 | Mechanical Systems | HATIM ELSAID | special |
| 08/19/2026 | Lighting controls | HATIM ELSAID | energy_progress |
| 08/19/2026 | Interior lighting power | HATIM ELSAID | energy_progress |
| 08/19/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 08/19/2026 | Final | HATIM ELSAID | progress |
| 08/19/2026 | Maintenance information | HATIM ELSAID | energy_progress |
| 08/19/2026 | Post-installed Anchors | HATIM ELSAID | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Harrison Street Asset Management | Office | Floor 34 | Project M01431943 |
| Sovereign Partners | Office | Cellar, Floors 1–4, 6, 25, 26, 28, 32, 35, 40, 44 | Project M01410772 Project M01410856 Project M01407287 Project M01405035 Project M01382153 Project M01379209 Project M01358357 Project M01359306 Project M01345667 Project M01337393 |
| Rockwood | Office | Floors 6, 14, 17, 18, 20–22, 25–27, 29, 31, 32, 37, 39–41, 43, 44 | Project M01326785 Project M01326836 Project M01326695 Project M01243239 Project M01222865 Project M01206129 Project M01189668 Project M01090129 Project M00979855 Project M00979747 Project M01045072 Project M01015691 |
| Global Foundries | Office | Floor 41 | Project M01313009 Project M00975794 |
| Pinnacle | Office | Floor 12 | Project M01074094 |
| Boothbay | Office | Floor 16 | Project M01063334 |
| Mesirow | Office | Floor 31 | Project M01032914 |