← Back
BuildNYC
Building
BIN 1042055
BIN 1042055
💬 Discuss this project
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kems Engineering and Construction209/14/2026
Piro Studio203/30/2026
Patrick Gerard Carmody, Architect PL103/30/2026
Alda LY Architecture109/18/2025
EP Engineering109/18/2025
Michael House Architect107/28/2025
Ashraf205/30/2025
Enthink Engineers710/30/2023
Hlzae107/17/2023
Cicognani Kalla Architect103/02/2023
Thornton Tomasetti201/09/2023
Asif Jamil, RA206/11/2021
Gilsanz Murray Steficek112/11/2019
Royal T&E105/21/2019
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355209/14/2026
Chen Engineering Services1826103/30/2026
Patrick Gerard Carmody, A2156203/30/2026
EP Inspections and Commis7079209/18/2025
Michael House Architect7910107/28/2025
George J. Xerakias, PE1658104/05/2024
Crosscheck Inspection Services544307/17/2023
Enthink Engineers6247106/02/2023
Gilsanz Murray Steficek240112/11/2019
Building Lifecycle
All (85)Filed (26)Permit Issued (37)Signed Off (6)Facade (FISP) (16)
10/20/2026
Signed off — Alteration
ARCHITECTURAL MODIFICATIONS TO UNIT 4L AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01231102-I1
09/29/2026
Permit issued — Plumbing
M01437325-S1-PL
09/29/2026
Permit issued — Boiler Equipment
M01437325-I1-BE
09/14/2026
Filed — Alteration
FILE FOR GAS PIPING TO STEAM BOILER AND DRYERS; REPLACEMENT OF TWO (2) DRYERS WITH FOUR (4) DOUBLE DRYERS IN SUB-CELLAR.
M01437325-S1
09/09/2026
Filed — Alteration
FILE FOR GAS PIPING TO STEAM BOILER AND DRYERS; REPLACEMENT OF TWO (2) DRYERS WITH FOUR (4) DOUBLE DRYERS IN SUB-CELLAR.
M01437325-I1
06/11/2026
Permit issued — Plumbing
M01356751-S1-PL
06/04/2026
Permit issued — Protection and Mechanical Methods
M01196625-I1-PMM
05/27/2026
Permit issued — General Construction
M01356751-I1-GC
05/11/2026
Permit issued — General Construction
M00885518-I1-GC
03/30/2026
Filed — Alteration
INTERIOR RENOVATION IN APT 10C FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01356751-S1
03/30/2026
Filed — Alteration
INTERIOR RENOVATION IN APT 10C FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01356751-I1
03/19/2026
Permit issued — General Construction
M00885518-I1-GC
12/18/2025
Permit issued — General Construction
M01231102-I1-GC
12/03/2025
Permit issued — Supported Scaffold
M00653021-I1-SF
12/03/2025
Permit issued — Supported Scaffold
M00653021-I1-SH
10/09/2025
Permit issued — General Construction
M01281777-I1-GC
09/18/2025
Filed — Alteration
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE DUCTWORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01281777-I1
09/18/2025
Filed — Alteration
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE DUCTWORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01281777-S1
07/28/2025
Filed — Alteration
ARCHITECTURAL MODIFICATIONS TO UNIT 4L AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01231102-I1
06/04/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY KNEE BRACKET AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M00883850-I1
06/02/2025
Permit issued — Protection and Mechanical Methods
M01196625-I1-PMM
05/30/2025
Filed — Alteration
INSTALLATION OF TEMPORARY KNEE BRACKET AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M01196625-I1
05/28/2025
Permit issued — Protection and Mechanical Methods
M00883850-I1-PMM
04/14/2025
Permit issued — Suspended Scaffold
M01029867-I1-SC
03/04/2025
Permit issued — General Construction
M00885518-I1-GC
12/09/2024
Permit issued — Sidewalk Shed
M00653021-I1-SF
12/09/2024
Permit issued — Sidewalk Shed
M00653021-I1-SH
10/30/2024
Cycle 9 facade report submitted
10/30/2024
Cycle 9 facade report signed — UNSAFE
10/29/2024
Cycle 9 facade inspection completed
08/22/2024
Permit issued — General Construction
M00885518-I1-GC
05/29/2024
Permit issued — Protection and Mechanical Methods
M00883850-I1-PMM
04/22/2024
Permit issued — Suspended Scaffold
M01029867-I1-SC
04/05/2024
Filed — Alteration
Installation of outriggers for facade repair and inspection
M01029867-I1
12/11/2023
Permit issued — Supported Scaffold
M00653021-I1-SF
12/11/2023
Permit issued — Supported Scaffold
M00653021-I1-SH
10/30/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00653021-P6
10/12/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00653021-P5
09/08/2023
Permit issued — General Construction
M00885518-I1-GC
08/23/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00653021-P4
07/17/2023
Filed — Alteration
FILING FOR THE FACADE RESTORATION AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00885518-I1
06/02/2023
Filed — Alteration
INSTALLATION OF TEMPORARY KNEE BRACKET AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
M00883850-I1
06/02/2023
Permit issued — Protection and Mechanical Methods
M00883850-I1-PMM
06/01/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00653021-P3
04/04/2023
Signed off — Alteration
M00715688-I1
03/20/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00653021-P2
03/09/2023
Permit issued — General Construction
M00715688-I1-GC
03/02/2023
Filed — Alteration
M00715688-I1
02/20/2023
Cycle 9 facade report submitted
02/20/2023
Cycle 9 facade report signed — UNSAFE
02/02/2023
Cycle 9 facade inspection completed
01/09/2023
Filed — Alteration
M00771763-I1
12/21/2022
Permit issued — Supported Scaffold
M00653021-I1-SH
12/21/2022
Permit issued — Supported Scaffold
M00653021-I1-SF
10/04/2022
Signed off — Alteration
Filing for the structural steel repairs at the 18th Floor Terrace this Structural scope will be effecting Structural Stability of the existing building structure.
M00274478-I1
03/17/2022
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00653021-P1
12/28/2021
Permit issued — Supported Scaffold
M00653021-I1-SH
12/28/2021
Permit issued — Supported Scaffold
M00653021-I1-SF
12/23/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00653021-I1
12/15/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00170061-I1
Latest 60 of 85 events.
Nothing on file for this building.
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
09/08/2026HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
09/08/2026HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
09/08/2026Heating SystemsABDALLAH ELCHERBINIspecial
09/08/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
09/08/2026HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
09/08/2026Maintenance informationSteven Bendoraitisenergy_progress
08/13/2026Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
07/28/2026Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
04/17/2026Fire-Resistant Penetrations and JointsPATRICK CARMODYspecial
02/06/2026FinalPATRICK CARMODYprogress
02/06/2026Lighting controlsPATRICK CARMODYenergy_progress
02/06/2026Lighting in dwelling unitsPATRICK CARMODYenergy_progress
02/06/2026Fire-Resistant Penetrations and JointsPATRICK CARMODYspecial
02/06/2026Post-installed AnchorsHENLIA CHENspecial
09/04/2025Tenant Protection Plan ComplianceMOLLY GLENNspecial
09/04/2025FinalMOLLY GLENNprogress
09/04/2025Post-installed AnchorsMOLLY GLENNspecial
09/04/2025Mechanical SystemsMOLLY GLENNspecial
04/05/2024Post-installed AnchorsGeorge Xerakiasspecial
04/05/2024Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
07/17/2023Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
07/17/2023Finalmahendradat sitaramprogress
01/04/2023Tenant Protection Plan ComplianceEUGENE BIFULCOspecial
07/08/2022MasonryEUGENE BIFULCOspecial
07/08/2022FinalEUGENE BIFULCOprogress
Latest 25 of 31.
Nothing on file for this building.