← Back
BuildNYC
Elevator cooperative
Coop City
140 ELGAR PLACE · Co-op City · BIN 2093861
💬 Discuss this project
1969Year Built
33Stories
D4Building Class
R6Zoning
5,541,031 sfGross Floor Area
4,470Units
LL97 CoveredRent Stabilized1,514 Active Violations 1,511 unresolved · 3 paperwork only ▸FISP: SAFE
Elevator cooperative · 1,952,770 sf lot · 2.84 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalEquipmentOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFISP Inspection using Industrial Rope AccessUnder Construction4p · 2 filings · 5 docs
Floor 1Plumbing and restroom work2 filings · 3 docs
Site & exteriorTemporary sidewalk shed installation5p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Riverbay4006/27/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RJ Stahl Architect206/15/2023
NY Restoration Technology308/22/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
P.wolfe Consultants403/21/2026
Xinos Construction603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Xinos ConstructionScaffold807/08/2026
Valentine ElectricElectrical103/21/2026
Star Electrical ContractorsElectrical103/22/2026
Building Lifecycle
All (90)Filed (6)Permit Issued (8)Signed Off (1)Facade (FISP) (12)Violation (60)Objection (2)Special Inspection (1)
08/24/2026
Violation issued (HPD, open)
A
06/17/2026
Permit issued — Suspended Scaffold
X01403229-I1-SC
06/04/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
X01403229-I1
02/27/2026
Violation issued (HPD, closed)
C
02/18/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00118409-I1
04/25/2025
Violation issued (HPD, open)
B
04/16/2024
Violation issued (HPD, closed)
A
03/25/2024
Violation issued (HPD, open)
B
08/31/2023
Violation issued (HPD, closed)
A
08/31/2023
Violation issued (HPD, open)
B
08/31/2023
Violation issued (HPD, open)
B
08/31/2023
Violation issued (HPD, open)
B
08/31/2023
Violation issued (HPD, open)
C
08/31/2023
Violation issued (HPD, open)
B
08/27/2023
Violation issued (HPD, open)
B
08/27/2023
Violation issued (HPD, open)
B
08/27/2023
Violation issued (HPD, open)
C
08/27/2023
Violation issued (HPD, open)
B
07/24/2023
Violation issued (HPD, open)
B
07/24/2023
Violation issued (HPD, open)
B
07/24/2023
Violation issued (HPD, open)
B
06/23/2023
Objection resolved — Addressed
06/20/2023
Objection raised — Scope
06/15/2023
Filed — Alteration
X08047507-I1
06/15/2023
Filed — Alteration
Filing Plumbing plans for ADA compliant restroom on 1st floor Retail Space. No change to Use, Egress or Occupancy. (Approved CCD1 attached from Code & Zoning Specialist-Patricia Aldea, RA).
X00876578-I1
05/31/2023
Special inspection requirement — Tenant Protection Plan Compliance
12/23/2022
Violation issued (HPD, open)
B
12/23/2022
Violation issued (HPD, closed)
A
12/23/2022
Violation issued (HPD, closed)
C
09/15/2022
Violation issued (HPD, open)
B
09/15/2022
Violation issued (HPD, open)
C
09/15/2022
Violation issued (HPD, open)
B
09/15/2022
Violation issued (HPD, open)
B
09/15/2022
Violation issued (HPD, open)
B
08/25/2022
Violation issued (HPD, closed)
C
08/25/2022
Violation issued (HPD, open)
C
08/25/2022
Violation issued (HPD, open)
A
08/25/2022
Violation issued (HPD, open)
B
08/25/2022
Violation issued (HPD, open)
B
03/08/2022
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
I
10/03/2021
Violation issued (HPD, open)
B
10/03/2021
Violation issued (HPD, open)
A
10/03/2021
Violation issued (HPD, open)
A
10/03/2021
Violation issued (HPD, open)
A
10/03/2021
Violation issued (HPD, open)
A
10/03/2021
Violation issued (HPD, closed)
A
10/03/2021
Violation issued (HPD, open)
A
10/03/2021
Violation issued (HPD, open)
A
05/18/2021
Violation issued (HPD, open)
A
05/18/2021
Violation issued (HPD, open)
C
04/16/2021
Violation issued (HPD, closed)
A
12/16/2020
Cycle 9 facade report submitted
12/13/2020
Cycle 9 facade report signed — SAFE
12/03/2020
Cycle 9 facade inspection completed
06/30/2020
Violation issued (HPD, open)
B
06/30/2020
Violation issued (HPD, open)
B
03/05/2020
Permit issued — Supported Scaffold
X00196661-I1-SF
02/13/2020
Permit issued — Supported Scaffold
X00196661-I1-SF
02/12/2020
Permit issued — Sidewalk Shed
X00118409-I1-SH
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation S06/17/2026
DOB NOWSupported ScaffoldPermit IssuedXinos Construction03/05/2020
DOB NOWSupported ScaffoldPermit IssuedXinos Construction02/13/2020
DOB NOWSidewalk ShedSigned-offXinos Construction02/12/2020
DOB NOWSupported ScaffoldPermit IssuedXinos Construction07/22/2019
DOB NOWSidewalk ShedSigned-offXinos Construction05/23/2019
DOB NOWSidewalk ShedSigned-offXinos Construction02/12/2019
DOB NOWSidewalk ShedSigned-offXinos Construction01/11/2019
BISOTISSUEDXinos Construction02/19/2020
BISOTISSUEDXinos Construction05/02/2019
BISOTISSUEDProto Restoration Construction10/24/2012
BISEQISSUEDG & M Equipment Leasing09/17/2012
BISEQISSUEDG & M Equipment Leasing04/13/2012
BISOTISSUEDProto Restoration Construction04/04/2012
BISOTISSUEDProto Construction & DVLP10/21/2011
BISEQRE-ISSUEDPerimeter Bridge & Scaffold08/13/2007
BISEQISSUEDEmpire Scaffolding System04/09/2007
BISOTISSUEDProto Construction & Development03/03/2006
BISOTISSUEDProto Construction & Development11/29/2005
BISEQISSUEDRiverbay01/05/2005
BISEQISSUEDRiverbay01/05/2005
BISEQISSUEDProto Construction & Development12/01/2004
BISOTISSUEDProto Construction & Development11/24/2004
BISEQISSUEDProto Construction & Development06/22/2004
BISEQISSUEDRiverbay12/30/2003
BISEQISSUEDRiverbay02/26/2003
BISEQISSUEDRiverbay02/26/2003
BISEQISSUEDRiverbay08/14/2002
BISEQISSUEDRiverbay08/12/2002
BISPLISSUEDHigraban of NY04/02/2002
BISMHISSUEDV.P.H. Mechanical01/29/2002
BISOTISSUEDV.P.H. Mechanical12/24/2001
BISEQISSUEDProto Construction & Development12/05/2001
BISOTISSUEDProto Construction & Development12/05/2001
BISOTISSUEDProto Construction & Development09/29/2001
BISOTISSUEDV.P.H. Mechanical05/14/2001
1 project · most recent 06/15/2023
Water/Sanitary
FiledStatusContractorScope
06/15/2023——Water/Sanitary
3 projects · most recent 03/25/2021
FiledStatusContractorScope
03/25/2021Permit IssuedStar Electrical Contractors—
09/22/2020Permit IssuedStar Electrical Contractors—
01/10/2019Permit IssuedTower Electric—
1 project · most recent 06/04/2026
FiledStatusContractorScope
06/04/2026Permit IssuedStructural Preservation S—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
05/31/2023Tenant Protection Plan Compliance—special
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00118409-I1Request digital key ↗
08/15/2026X00118409-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/23/2026X00876578-I1Request digital key ↗
08/16/2026X01403229-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00196661-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION6
09/03/2019240251295Open ↗
04/04/2019240251295Open ↗
03/22/2019220637531Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
05/02/2019220637531Open ↗
10/25/2012220146349Open ↗
04/14/2012220179321Open ↗
Showing 3 of 5 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION3
12/18/2012220146349Open ↗
12/05/2012220146349Open ↗
11/19/2012220146349Open ↗
▸Seals & Professional Certifications17
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/25/2019220637531Open ↗
02/01/2013220146349Open ↗
04/14/2012220179321Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026X00196661-I1Open ↗
08/26/2026X00118409-P1Open ↗
08/26/2026X00118409-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/25/2019220637531Open ↗
04/14/2012220179321Open ↗
10/25/2011220146349Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/14/2012220179321Open ↗
10/25/2011220146349Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/04/2019240251295Open ↗
02/25/2019220637531Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/04/2019240251295Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/04/2019240251295Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
02/25/2019220637531Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/22/2019220637531Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026X00876578-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY1
10/25/2011220146349Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/11/2020220637531Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/25/2019220637531Open ↗
▸BISFENESTRATION AIR LEAKAGE1
09/11/2020220637531Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/11/2020220637531Open ↗
▸Inspections & Test Reports3
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
09/11/2020220637531Open ↗
▸BISMASONRY1
09/11/2020220637531Open ↗
▸BISPOST-INSTALLED ANCHORS1
09/11/2020220637531Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS2
04/14/2012220179321Open ↗
10/25/2011220146349Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
09/11/2020220637531Open ↗
02/01/2013220146349Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/11/2020220637531Open ↗
04/05/2012220146349Open ↗
▸BISFINAL1
09/11/2020220637531Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/26/2026X00196661-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
04/04/2019240251295Open ↗
02/25/2019220637531Open ↗
02/01/2013220146349Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/11/2020220637531Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
02/25/2019220637531Open ↗
04/14/2012220179321Open ↗
10/25/2011220146349Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/04/2019240251295Open ↗
▸BISBOROUGH INTAKE FORM1
09/03/2019240251295Open ↗
▸Other Documents3
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
08/13/2026X00118409-I1Open ↗
08/13/2026X00118409-P1Open ↗
▸DOB NOWIRA Certification1
08/16/2026X01403229-I1Open ↗