← Back
BuildNYC
One story - permanent living quarter
140 FINLEY AVENUE
STATEN ISLAND · BIN 5056553
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R3-1Zoning
1,499 sfGross Floor Area
1Units
One story - permanent living quarter · 6,000 sf lot · 0.25 FAR built · Flood zone AE
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoof mounted solar photovoltaic system installation1p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
James A Clancy304/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arc Design Consulting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ficazzola Consultingspecialty_contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Etrecte8116304/09/2024
Building Lifecycle
04/12/2024
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
S00983666-I1
04/09/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISITING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
S00983666-P3
04/04/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
04/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
04/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
15 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFicazzola Consulting01/25/2024
1 project · most recent 01/03/2024
FiledStatusContractorScope
01/03/2024CompleteAmber Electl Contng—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/04/2024Air barrier - visual inspectionJames Clancyenergy_progress
04/04/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
04/04/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
04/04/2024Energy Code Compliance InspectionsJames Clancyprogress
04/04/2024FinalJames Clancyprogress
01/05/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
01/05/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
01/05/2024Energy Code Compliance InspectionsJames Clancyprogress
01/05/2024Final—progress
01/05/2024Air barrier - visual inspectionJames Clancyenergy_progress
29 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account