← Back
Four families
140 PRESIDENT STREET
💬 Discuss this project
1900Year Built
3Stories
C3Building Class
R6BZoning
3,360 sfGross Floor Area
4Units
Rent Stabilized12 Open Violations ▸
Four families · Owner of record: 140 PRESIDENT, LLC · 1,600 sf lot · 2.1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 311p · 3 filings · 20 docs
Floor 28p · 3 filings · 20 docs
Floor 19p · 3 filings · 20 docs
Cellar5p · 2 filings · 20 docs
Sub-Basement8p · 3 filings · 20 docs
Site & exterior3p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
140 PRESIDENT2007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/08/2020$2.4M—140 PRESIDENT STREET, LLC → 140 PRESIDENT, LLC$699/sf building
12/05/2019$1.6M—— → —$461/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EAB ENGINEERING PC507/06/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CROSSFIELD PLBG.&HTGPlumbing707/08/2026
M. INT'L ENGINEERING PLLCGeneral Contractor407/08/2026
JIAN YANG YUElectrical303/21/2026
J. AND F. REFRIGERATION,*General Contractor203/21/2026
J Y ELECTRIC INCElectrical103/22/2026
J Y ELECTRIC INC 005021General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EAB ENGINEERING, PC2048507/06/2022
Building Lifecycle
All (59)Filed (5)Permit Issued (5)Signed Off (3)Violation (13)Objection (18)Special Inspection (15)
05/05/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
04/11/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, open)
I
03/24/2023
Violation issued (HPD, open)
A
12/28/2022
Signed off — Alteration
REMOVE / INSTALL NONO-LOAD BEARING PARTITITONS AND MODERATE INTERIOR RENOVATION IN AN EXISITNG FOUR FAMILY DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00501596-I1
12/28/2022
Signed off — Alteration
REMOVE ALL PLUMBING FIXTURES IN EXISTING FOUR FAMILY DWELLING AND INSTALL NEW PLUMBING FIXTURES IN NEW ROUGHING.
B00501595-I1
12/28/2022
Signed off — Alteration
INSTALL HVAC MINI SPLIT SYSTEMS IN CONJUNCTION WITH ALTERATION APPLICATION #B00501596. NO CHNAGE TO USE, EGRESS OR OCCUPANCY.
B00754404-I1
11/29/2022
Permit issued — Mechanical Systems
B00754404-I1-MS
11/14/2022
Violation issued (HPD, open)
I
08/18/2022
Objection resolved — Addressed
08/18/2022
Objection resolved — Addressed
08/18/2022
Objection resolved — Addressed
08/18/2022
Objection resolved — Addressed
08/02/2022
Objection resolved — Addressed
07/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Iraj Issapour
07/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Iraj Issapour
07/15/2022
Objection resolved — Addressed
07/13/2022
Objection raised — Scope
07/13/2022
Objection raised — Scope
07/13/2022
Objection raised — Scope
07/13/2022
Objection raised — Scope
07/13/2022
Objection resolved — Addressed
07/12/2022
Objection raised — Scope
07/06/2022
Filed — Alteration
INSTALL HVAC MINI SPLIT SYSTEMS IN CONJUNCTION WITH ALTERATION APPLICATION #B00501596. NO CHNAGE TO USE, EGRESS OR OCCUPANCY.
B00754404-I1
07/06/2022
Filed — Alteration
REMOVE ALL PLUMBING FIXTURES IN EXISTING FOUR FAMILY DWELLING AND INSTALL NEW PLUMBING FIXTURES IN NEW ROUGHING.
B00501595-P1
07/06/2022
Objection resolved — Addressed
07/05/2022
Objection resolved — Addressed
06/22/2022
Objection raised — Scope
06/22/2022
Objection raised — Other
06/22/2022
Objection raised — Other
06/22/2022
Objection raised — Scope
06/09/2022
Filed — Alteration
REMOVE / INSTALL NONO-LOAD BEARING PARTITITONS AND MODERATE INTERIOR RENOVATION IN AN EXISITNG FOUR FAMILY DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00501596-P1
06/07/2022
Special inspection requirement — Final
Iraj Issapour
06/07/2022
Special inspection requirement — Fire-Resistance Rated Construction
Iraj Issapour
06/07/2022
Special inspection requirement — Fenestration areas
Iraj Issapour
06/07/2022
Special inspection requirement — Fenestration air leakage
Iraj Issapour
06/07/2022
Special inspection requirement — Lighting controls
Iraj Issapour
06/07/2022
Special inspection requirement — Air barrier - visual inspection
Iraj Issapour
06/07/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Iraj Issapour
06/07/2022
Special inspection requirement — Interior lighting power
Iraj Issapour
06/07/2022
Special inspection requirement — Lighting in dwelling units
Iraj Issapour
06/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Iraj Issapour
06/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Iraj Issapour
06/07/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Iraj Issapour
06/07/2022
Special inspection requirement — Energy Code Compliance Inspections
Iraj Issapour
05/31/2022
Permit issued — Plumbing
B00501595-I1-PL
03/22/2022
Permit issued — General Construction
B00501596-I1-GC
03/01/2022
Violation issued (HPD, open)
A
03/01/2022
Violation issued (HPD, open)
I
04/28/2021
Permit issued — Plumbing
B00501595-I1-PL
04/28/2021
Permit issued — General Construction
B00501596-I1-GC
04/12/2021
Filed — Alteration
REMOVE / INSTALL NONO-LOAD BEARING PARTITITONS AND MODERATE INTERIOR RENOVATION IN AN EXISITNG FOUR FAMILY DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00501596-I1
04/12/2021
Filed — Alteration
REMOVE ALL PLUMBING FIXTURES IN EXISTING FOUR FAMILY DWELLING AND INSTALL NEW PLUMBING FIXTURES IN NEW ROUGHING.
B00501595-I1
04/12/2021
Violation issued (HPD, open)
I
04/12/2021
Violation issued (HPD, open)
A
02/24/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJ. AND F. REFRIGERATION,*11/29/2022
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG05/31/2022
DOB NOWGeneral ConstructionSigned-offM. INT'L ENGINEERING PLLC03/22/2022
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG04/28/2021
DOB NOWGeneral ConstructionSigned-offM. INT'L ENGINEERING PLLC04/28/2021
2 projects · most recent 08/14/2023
General Wiring
FiledStatusContractorScope
08/14/2023CompleteJ Y ELECTRIC INCGeneral Wiring
05/10/2022CompleteJ Y ELECTRIC INC5 meters, 5 new_meters
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/24/2022Fire-Resistant Penetrations and JointsIraj Issapourspecial
07/24/2022HVAC-R and service water piping design and insulationIraj Issapourenergy_progress
06/07/2022FinalIraj Issapourprogress
06/07/2022Fire-Resistance Rated ConstructionIraj Issapourprogress
06/07/2022Fenestration areasIraj Issapourenergy_progress
06/07/2022Fenestration air leakageIraj Issapourenergy_progress
06/07/2022Lighting controlsIraj Issapourenergy_progress
06/07/2022Air barrier - visual inspectionIraj Issapourenergy_progress
06/07/2022Fenestration and door U-factor and product ratingsIraj Issapourenergy_progress
06/07/2022Interior lighting powerIraj Issapourenergy_progress
06/07/2022Lighting in dwelling unitsIraj Issapourenergy_progress
06/07/2022Fire-Resistant Penetrations and JointsIraj Issapourspecial
06/07/2022Fire-Resistant Penetrations and JointsIraj Issapourspecial
06/07/2022HVAC-R and service water piping design and insulationIraj Issapourenergy_progress
06/07/2022Energy Code Compliance InspectionsIraj Issapourprogress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00501596-I1Request digital key ↗
09/01/2026B00501595-I1Request digital key ↗
08/15/2026B00501595-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature12
09/29/2026B00501595-P1Open ↗
08/25/2026B00501596-P1Open ↗
08/25/2026B00501596-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00501596-I1Open ↗
09/01/2026B00501596-P1Open ↗
09/01/2026B00501595-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/29/2026B00501595-P1Open ↗
08/25/2026B00501596-P1Open ↗
08/23/2026B00501595-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00501596-I1Open ↗
09/01/2026B00501595-I1Open ↗
08/15/2026B00501595-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
09/01/2026B00501595-I1Open ↗
08/13/2026B00501596-I1Open ↗
08/15/2026B00754404-I1Open ↗