← Back
BuildNYC
Elevator apt, fireproof without stores
Douglass II (NYCHA)
140 WEST 104TH STREET · BIN 1079419
💬 Discuss this project
1958Year Built
17Stories
D3Building Class
R7-2Zoning
700,175 sfGross Floor Area
1,162Units
LL97 Covered10 Active Violations 9 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 628,400 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNYC Housing Authority54p · 5 filings · 20 docs
BulkheadNYC Housing Authority1p · 1 filing · 20 docs
Site & exteriorDouglass Houses II temporary sidewalk shed installation43p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority4907/08/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Thornton Tomasetti403/25/2026
RKTB Architects312/04/2025
Odc Associates211/01/2024
HD Group306/19/2024
Joel Phagoo P.E405/22/2024
Ikra Consulting303/27/2022
AK Consulting Services205/01/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services1003/21/2026
Aristar Group603/21/2026
Sharon Rader203/21/2026
Design 2147403/21/2026
Joel Phagoo P.E103/21/2026
Joel Phagoo P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roma ScaffoldingScaffold1907/08/2026
Bhaghiana General ConstructionScaffold807/08/2026
MNK EnterprisesScaffold603/21/2026
Bhaghiana General ConstructionGeneral Contractor507/08/2026
Zoria HousingScaffold307/08/2026
Lit Mode Electrical ContgElectrical203/21/2026
Lit Mode Electrical ContgElectrical203/22/2026
Skyline P & HPlumbing203/22/2026
Alliance Elevator CompanyElectrical203/21/2026
Tri-State Electrical & Mechanical IElectrical103/22/2026
The Maintenance CoElectrical103/21/2026
N.Y.C. Housing AuthorityElectrical103/21/2026
Zoria HousingGeneral Contractor107/08/2026
Tri-State Electrical & Mechanical IElectrical103/21/2026
Thompson Electrical Main ServiceElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 Inspections1471503/25/2026
Socotec Engineering4983211/01/2024
Joel Phagoo, PE2416102/20/2024
Building Lifecycle
All (135)Filed (24)Permit Issued (24)Signed Off (12)Facade (FISP) (15)Violation (20)Objection (10)Special Inspection (30)
08/31/2026
Signed off — Alteration
HEREWITH FILING ROOFING REPLACEMENT LIMITED FACADE WORK AT BULKHEADS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00787092-I1
08/26/2026
Signed off — Alteration
Herewith filing railing replacement, metal stair replacement or modification, ladder attachment, minor structural repairs as per plans. No change in use, egress or occupancy
M00787208-I1
06/01/2026
Permit issued — Structural
M00787208-I1-ST
04/21/2026
Special inspection requirement — Final
JACOB HAAS
04/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
03/25/2026
Filed — Alteration
Herewith filing railing replacement, metal stair replacement or modification, ladder attachment, minor structural repairs as per plans. No change in use, egress or occupancy
M00787208-P3
03/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
03/12/2026
Special inspection requirement — Masonry
JACOB HAAS
03/12/2026
Special inspection requirement — Post-installed Anchors
JACOB HAAS
03/12/2026
Special inspection requirement — Insulation placement and R values
JACOB HAAS
03/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JACOB HAAS
03/12/2026
Special inspection requirement — Fenestration air leakage
JACOB HAAS
03/12/2026
Special inspection requirement — Final
JACOB HAAS
03/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
03/02/2026
Special inspection requirement — Preliminary
JACOB HAAS
03/02/2026
Special inspection requirement — Final
JACOB HAAS
02/25/2026
Objection resolved — Addressed
01/14/2026
Objection raised — Scope
12/04/2025
Filed — Alteration
HEREWITH FILING ROOFING REPLACEMENT LIMITED FACADE WORK AT BULKHEADS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00787092-P3
12/04/2025
Filed — Alteration
Herewith filing railing replacement, metal stair replacement or modification, ladder attachment, minor structural repairs as per plans. No change in use, egress or occupancy
M00787208-P2
11/25/2025
Special inspection requirement — Final
JACOB HAAS
11/25/2025
Special inspection requirement — Preliminary
JACOB HAAS
11/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
08/15/2025
Signed off — Alteration
INSTALLATION OF SWING HOIST TO LIFT MATERIAL.
M01074243-I1
08/05/2025
Permit issued — Suspended Scaffold
M01074243-I1-SC
06/30/2025
Signed off — Alteration
NYCHA DOUGLASS II, BLD. #13 - INSTALLATION OF APPROXIMATELY +/- 640 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING REPLACEMENT. THERE WILL BE NO CHANGE TO BUILDING USE, EGRESS OR OCCUPANCY.
M01063629-I1
06/30/2025
Signed off — Alteration
NYCHA DOUGLASS II, BLD. #13 - INSTALLATION OF +/- 1,740 LF OF 8'-0"H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING REPLACEMENT. THERE WILL BE NO CHANGE IN BUILDINGG USE, EGRESS OR OCCUPANCY.
M01063634-I1
06/30/2025
Signed off — Alteration
NYCHA DOUGLASS II, BLD. #13 - INSTALLATION APPROXIMATELY 2,070 SF TEMPORARY SUPPORTED PIPE SCAFFOLD FOR ROOFING REPLACEMENT AND MASONRY RESTORATION, AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY.
M01063643-I1
06/18/2025
Permit issued — Sidewalk Shed
M01063629-I1-SH
02/28/2025
Signed off — Alteration
Exterior wall and bulkhead roof repairs. no change to use, occupancy or egress.
M00996300-I1
02/20/2025
Objection resolved — Addressed
02/18/2025
Objection raised — Other
02/15/2025
Filed — Alteration
INSTALLATION OF SWING HOIST TO LIFT MATERIAL.
M01074243-P1
02/14/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
TREVOR O. FLOWERS
12/05/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00893092-I1
12/05/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00893076-I1
11/06/2024
Permit issued — General Construction
M00787092-I1-GC
11/06/2024
Permit issued — Structural
M00787208-I1-ST
11/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
11/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
11/04/2024
Special inspection requirement — Final
TIMOTHY WEBB
11/04/2024
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
11/01/2024
Filed — Alteration
Exterior wall and bulkhead roof repairs. no change to use, occupancy or egress.
M00996300-P1
10/29/2024
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
10/29/2024
Special inspection requirement — Final
TIMOTHY WEBB
10/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
09/09/2024
Cycle 9 facade report signed — SAFE
08/27/2024
Cycle 9 facade report submitted
08/13/2024
Signed off — Alteration
M01006453-I1
08/06/2024
Cycle 9 facade inspection completed
07/12/2024
Permit issued — Suspended Scaffold
M01074243-I1-SC
07/03/2024
Filed — Alteration
INSTALLATION OF SWING HOIST TO LIFT MATERIAL.
M01074243-I1
06/24/2024
Permit issued — Construction Fence
M00893092-I1-FN
06/21/2024
Permit issued — Supported Scaffold
M01063643-I1-SF
06/21/2024
Permit issued — Construction Fence
M01063634-I1-FN
06/20/2024
Permit issued — Sidewalk Shed
M01063629-I1-SH
06/19/2024
Filed — Alteration
NYCHA DOUGLASS II, BLD. #13 - INSTALLATION OF APPROXIMATELY +/- 640 LF TEMPORARY HEAVY DUTY SIDEWALK SHED, AS PER PLANS, FOR ROOFING REPLACEMENT. THERE WILL BE NO CHANGE TO BUILDING USE, EGRESS OR OCCUPANCY.
M01063629-I1
06/19/2024
Filed — Alteration
NYCHA DOUGLASS II, BLD. #13 - INSTALLATION OF +/- 1,740 LF OF 8'-0"H TEMPORARY CHAIN LINK CONSTRUCTION FENCE, AS PER PLANS, FOR ROOFING REPLACEMENT. THERE WILL BE NO CHANGE IN BUILDINGG USE, EGRESS OR OCCUPANCY.
M01063634-I1
06/19/2024
Filed — Alteration
NYCHA DOUGLASS II, BLD. #13 - INSTALLATION APPROXIMATELY 2,070 SF TEMPORARY SUPPORTED PIPE SCAFFOLD FOR ROOFING REPLACEMENT AND MASONRY RESTORATION, AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY.
M01063643-I1
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBhaghiana General Construction06/01/2026
DOB NOWSuspended ScaffoldSigned-offBlue Tech Construction NY08/05/2025
DOB NOWSidewalk ShedSigned-offBhaghiana General Construction06/18/2025
DOB NOWGeneral ConstructionSigned-offBhaghiana General Construction11/06/2024
DOB NOWStructuralSigned-offBhaghiana General Construction11/06/2024
DOB NOWSuspended ScaffoldSigned-offBlue Tech Construction NY07/12/2024
DOB NOWConstruction FenceSigned-offZoria Housing06/24/2024
DOB NOWSupported ScaffoldSigned-offBhaghiana General Construction06/21/2024
DOB NOWConstruction FenceSigned-offBhaghiana General Construction06/21/2024
DOB NOWSidewalk ShedSigned-offBhaghiana General Construction06/20/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises06/17/2024
DOB NOWGeneral ConstructionSigned-offZoria Housing05/06/2024
DOB NOWSuspended ScaffoldSigned-offZoria Housing02/27/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises06/21/2023
DOB NOWConstruction FenceSigned-offZoria Housing06/21/2023
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/08/2023
DOB NOWSidewalk ShedSigned-offRoma Scaffolding09/15/2022
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/02/2022
DOB NOWSidewalk ShedSigned-offRoma Scaffolding09/20/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/03/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding10/31/2020
DOB NOWSidewalk ShedSigned-offRoma Scaffolding09/22/2020
DOB NOWConstruction FenceSigned-offRoma Scaffolding11/14/2019
DOB NOWSidewalk ShedSigned-offRoma Scaffolding09/26/2019
BISOTISSUEDNap Construction Co04/30/2002
BISPLISSUEDV. C. Vitanza Sons11/04/1993
7 projects · most recent 07/18/2025
General Wiring
FiledStatusContractorScope
07/18/2025CompleteTri-State Electrical & Mechanical IGeneral Wiring
10/23/2024CompleteLit Mode Electrical Contg—
06/24/2024CompleteLit Mode Electrical Contg—
03/21/2024CompleteQ.Y. Electric—
03/15/2023CompleteQ.Y. Electric—
03/18/2021Permit IssuedRobert Chimenti3 meters, 1 new_meters
09/06/2019Permit IssuedRaiden Electric—
2 projects · most recent 03/25/2026
Concrete
FiledStatusContractorScope
03/25/2026Signed-offBhaghiana General ConstructionConcrete
12/04/2025Signed-offBhaghiana General Construction1 scope_items
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
04/21/2026FinalJACOB HAASprogress
04/21/2026Structural Stability – Alterations of existing buildingsJACOB HAASspecial
03/12/2026Structural Stability – Alterations of existing buildingsJACOB HAASspecial
03/12/2026MasonryJACOB HAASspecial
03/12/2026Post-installed AnchorsJACOB HAASspecial
03/12/2026Insulation placement and R valuesJACOB HAASenergy_progress
03/12/2026Fenestration and door U-factor and product ratingsJACOB HAASenergy_progress
03/12/2026Fenestration air leakageJACOB HAASenergy_progress
03/12/2026FinalJACOB HAASprogress
03/02/2026Structural Stability – Alterations of existing buildingsJACOB HAASspecial
03/02/2026PreliminaryJACOB HAASprogress
03/02/2026FinalJACOB HAASprogress
11/25/2025FinalJACOB HAASprogress
11/25/2025PreliminaryJACOB HAASprogress
11/25/2025Structural Stability – Alterations of existing buildingsJACOB HAASspecial
02/14/2025Alternative Materials - OTCR Buildings Bulletin NumberTREVOR O. FLOWERSspecial
11/04/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
11/04/2024Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
11/04/2024FinalTIMOTHY WEBBprogress
11/04/2024MasonryALEXIS SCHLESSINGERMANspecial
10/29/2024MasonryALEXIS SCHLESSINGERMANspecial
10/29/2024FinalTIMOTHY WEBBprogress
10/29/2024Tenant Protection Plan Compliance—special
10/29/2024Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
04/16/2024Fire-Resistant Penetrations and Joints—special
Latest 25 of 38.
▾Documents — 120 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch19
09/01/2026M00787092-I1Request digital key ↗
09/01/2026M00787092-P1Request digital key ↗
08/27/2026M01006453-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00232731-I1Request digital key ↗
09/05/2026M00232731-P2Request digital key ↗
08/15/2026M00232731-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/05/2026M00263846-P1Request digital key ↗
09/05/2026M00263846-I1Request digital key ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/05/2026M00232731-I1Open ↗
09/05/2026M00263846-P1Open ↗
09/05/2026M00263846-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M01074243-P1Open ↗
09/01/2026M00996300-P1Open ↗
09/01/2026M00996300-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00996300-P1Open ↗
09/01/2026M00996300-I1Open ↗
08/31/2026M00787208-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWTenant Protection Plan5
09/05/2026M00232731-I1Open ↗
09/05/2026M00232731-P1Open ↗
09/05/2026M00263846-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/01/2026M00787092-I1Open ↗
08/15/2026M00787208-I1Open ↗
08/13/2026M00996300-I1Open ↗
▸Approvals, Objections & Sign-offs43
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
09/05/2026M00232731-I1Open ↗
09/05/2026M00263846-I1Open ↗
09/05/2026M00263846-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
09/05/2026M00232731-P1Open ↗
09/05/2026M00232731-I1Open ↗
09/05/2026M00263846-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
09/01/2026M00787092-I1Open ↗
08/13/2026M00232731-I1Open ↗
08/13/2026M00263846-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter3
09/01/2026M00787092-I1Open ↗
08/15/2026M00787208-I1Open ↗
08/13/2026M00996300-I1Open ↗
▸Other Documents9
▸DOB NOWCalculations3
08/27/2026M01074243-I1Open ↗
08/13/2026M01074243-P1Open ↗
08/13/2026M01006453-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026M00787092-P1Open ↗
08/13/2026M00787092-P3Open ↗
08/13/2026M00787092-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/27/2026M01074243-I1Open ↗
08/13/2026M01006453-I1Open ↗
08/13/2026M01074243-P1Open ↗