← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Greenwich Lane Condominium
140 WEST 12TH STREET · West Village · BIN 1090633
💬 Discuss this project
2013Year Built
17Stories
RMBuilding Class
R8Zoning
533,883 sfGross Floor Area
204Units
LL97 CoveredRent Stabilized0 Active Violations
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: The Greenwich Lane Condominium · 92,925 sf lot · 5.75 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
PenthouseUnit PH6A1p · 1 filing · 7 docs
Floor 4Unit 400, Unit 40321p · 1 filing · 20 docs
Floor 3Unit 3013p · 1 filing · 5 docs
Floor 2
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RHL Engineering309/24/2026
James Dixon Architect107/29/2025
Truong Montgomery Architect103/26/2025
Simple Architecture106/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alcon Builders GroupGeneral Contractor203/21/2026
John Hummel Custom BLDGeneral Contractor204/09/2026
Cavan ElectricElectrical103/22/2026
Dutchess Cabinets of NY *specialty_contractor104/09/2026
Hudson Plumbing & MCHPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RHL Engineering712409/24/2026
James Dixon Architect4606107/29/2025
Building Lifecycle
All (45)Filed (6)Permit Issued (5)Signed Off (2)Inspection (1)Objection (12)Special Inspection (19)
09/24/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 400 AND 403 ON THE 004 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01253775-P1
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Gentile
09/21/2026
Special inspection requirement — Post-installed Anchors
Vincent Gentile
09/21/2026
Special inspection requirement — Energy Code Compliance Inspections
RICHARD LEMANSKY
09/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD LEMANSKY
01/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/18/2025
Signed off — Alteration
ADDING A PARTITION TO CREATING A FOURTH BEDROOM AND RECONFIGURING ENTRY TO MASTER BEDROOM AND MASTER CLOSET.
M01195960-I1
09/19/2025
Permit issued — General Construction
M01253775-I1-GC
09/19/2025
Permit issued — Mechanical Systems
M01253775-S1-MS
09/17/2025
Objection resolved — Addressed
09/10/2025
Permit issued — Plumbing
M01253775-S2-PL
08/26/2025
Objection resolved — Addressed
08/26/2025
Objection resolved — Addressed
08/25/2025
Objection raised — Scope
08/25/2025
Objection raised — Cost
08/25/2025
Objection raised — Scope
08/14/2025
Objection resolved — Addressed
08/12/2025
Objection raised — Cost
07/29/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 400 AND 403 ON THE 004 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01253775-I1
07/29/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 400 AND 403 ON THE 004 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01253775-S1
07/29/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 400 AND 403 ON THE 004 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01253775-S2
07/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD LEMANSKY
07/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Gentile
07/11/2025
Special inspection requirement — Post-installed Anchors
Vincent Gentile
07/11/2025
Special inspection requirement — Energy Code Compliance Inspections
RICHARD LEMANSKY
07/10/2025
Special inspection requirement — Maintenance information
RICHARD LEMANSKY
07/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD LEMANSKY
07/10/2025
Special inspection requirement — Energy Code Compliance Inspections
RICHARD LEMANSKY
07/10/2025
Special inspection requirement — Mechanical Systems
Vincent Gentile
07/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Gentile
07/10/2025
Special inspection requirement — Post-installed Anchors
Vincent Gentile
07/10/2025
Special inspection requirement — Final
RICHARD LEMANSKY
07/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
RICHARD LEMANSKY
07/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD LEMANSKY
07/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD LEMANSKY
04/10/2025
Permit issued — General Construction
M01195960-I1-GC
04/04/2025
Objection resolved — Addressed
04/04/2025
Objection resolved — Addressed
04/02/2025
Objection raised — Scope
04/02/2025
Objection raised — Scope
03/26/2025
Filed — Alteration
ADDING A PARTITION TO CREATING A FOURTH BEDROOM AND RECONFIGURING ENTRY TO MASTER BEDROOM AND MASTER CLOSET.
M01195960-I1
03/17/2025
Special inspection requirement — Final
Anh Montgomery
02/24/2025
Signed off — Alteration
M01069679-I1
09/09/2024
Permit issued — General Construction
M01069679-I1-GC
06/20/2024
Filed — Alteration
M01069679-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJohn Hummel Custom BLD09/19/2025
DOB NOWMechanical SystemsPermit IssuedJohn Hummel Custom BLD09/19/2025
DOB NOWPlumbingPermit IssuedHudson Plumbing & MCH09/10/2025
DOB NOWGeneral ConstructionSigned-offDutchess Cabinets of NY *04/10/2025
DOB NOWGeneral ConstructionSigned-offAlcon Builders Group09/09/2024
1 project · most recent 09/24/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/24/2026Permit IssuedGolds PlumbingGas, Water/Sanitary
13 projects · most recent 04/28/2026
General Wiring
FiledStatusContractorScope
04/28/2026CompleteDaven Electric—
09/09/2025CompleteEqual Electrical ContGeneral Wiring
08/10/2025Permit IssuedEinstein Electrical—
08/10/2025Permit IssuedEinstein ElectricalGeneral Wiring
04/15/2025CompleteCavan ElectricGeneral Wiring
02/20/2025CompleteEqual Electrical Cont—
01/03/2025CompleteTop Notch ElectricGeneral Wiring
11/17/2024CompleteAP Electl Ser & MaintenanceGeneral Wiring
10/22/2024CompleteEtech ElectricalGeneral Wiring
11/08/2023CompleteK.N.C. ElectricGeneral Wiring
06/20/2022CompleteInfinity ElectricGeneral Wiring
06/30/2020Permit IssuedEis Electric Corp DbaGeneral Wiring
07/24/2018CompleteEis Electric Corp DbaGeneral Wiring
1 project · most recent 09/24/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/24/2026Permit IssuedJohn Hummel Custom BLDTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/21/2026Fire-Resistant Penetrations and JointsVincent Gentilespecial
09/21/2026Post-installed AnchorsVincent Gentilespecial
09/21/2026Energy Code Compliance InspectionsRICHARD LEMANSKYprogress
09/21/2026HVAC-R and service water piping design and insulationRICHARD LEMANSKYenergy_progress
07/11/2025HVAC-R and service water piping design and insulationRICHARD LEMANSKYenergy_progress
07/11/2025Fire-Resistant Penetrations and JointsVincent Gentilespecial
07/11/2025Post-installed AnchorsVincent Gentilespecial
07/11/2025Energy Code Compliance InspectionsRICHARD LEMANSKYprogress
07/10/2025Maintenance informationRICHARD LEMANSKYenergy_progress
07/10/2025HVAC-R and service water heating equipmentRICHARD LEMANSKYenergy_progress
07/10/2025Energy Code Compliance InspectionsRICHARD LEMANSKYprogress
07/10/2025Mechanical SystemsVincent Gentilespecial
07/10/2025Fire-Resistant Penetrations and JointsVincent Gentilespecial
07/10/2025Post-installed AnchorsVincent Gentilespecial
07/10/2025FinalRICHARD LEMANSKYprogress
07/10/2025Duct leakage testing, insulation and designRICHARD LEMANSKYenergy_progress
07/10/2025HVAC-R and service water piping design and insulationRICHARD LEMANSKYenergy_progress
07/10/2025HVAC-R and service water heating system controlsRICHARD LEMANSKYenergy_progress
03/17/2025FinalAnh Montgomeryprogress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026M01069679-I1Request digital key ↗
08/22/2026M01253775-S2Request digital key ↗
08/22/2026M01253775-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
10/05/2026M01253775-P1Open ↗
08/13/2026M01253775-S1Open ↗
08/13/2026M01069679-I1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature7
10/05/2026M01253775-P1Open ↗
10/05/2026M01253775-P1Open ↗
09/02/2026M01253775-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
10/05/2026M01253775-P1Open ↗
08/27/2026M01069679-I1Open ↗
08/13/2026M01253775-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
10/05/2026M01253775-P1Open ↗
09/02/2026M01253775-S2Open ↗
08/23/2026M01253775-S1Open ↗
▸Environmental & Asbestos9
▸DOB NOWOER: Notice to Proceed6
10/05/2026M01253775-P1Open ↗
08/13/2026M01069679-I1Open ↗
08/13/2026M01253775-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026M01195960-I1Open ↗
08/13/2026M01069679-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M01195960-I1Open ↗