← Back
Multi-story retail building (2+)
138 WEST 32 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1015187
💬 Discuss this project
1920Year Built
2Stories
K2Building Class
C6-4.5Zoning
2,935 sfGross Floor Area
3Units
0 Open Violations
Multi-story retail building (2+) · Owner of record: 138-142 WEST 32ND STREET LLC · 1,960 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 3 filings · 20 docs
Floor 21p · 1 filing · 11 docs
Floor 1Under Construction7p · 2 filings · 20 docs
Mezzanine1p · 1 filing · 20 docs
CellarUnder Construction5p · 3 filings · 20 docs
BasementUnder Construction1p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VORNADO REALTY TRUST3807/08/2026
138-142 WEST 32ND ST LLC103/22/2026
VORNADO OFFICE MANAGEMENT1103/21/2026
VORANDO OFFICE MANAGEMENT103/21/2026
138 40 WEST 32ND ST ASSOCIATE303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LDC CONSULTANTS103/21/2026
LOUIS STRIAR603/21/2026
JAE CHUNG ARCHITECT P C1403/21/2026
ARCHETYPE CONSULTANTS603/21/2026
CONVERSANO ASSOCIATES, INC.603/21/2026
DIRECT ACCESS EXPEDITING, INC.603/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVEREST SCAFFOLDING INCGeneral Contractor507/08/2026
KING HOIST & SCAFFOLDINGGeneral Contractor307/08/2026
AVON PLBG & HTG INCPlumbing307/08/2026
TRISTATE PLBG SVCS CORPPlumbing207/08/2026
CITY SIGNSScaffold207/08/2026
FRANKIE PLBG & HTG L.L.CPlumbing106/28/2026
PHILIP A. ROBINSONElectrical103/22/2026
MAD SIGNSScaffold107/08/2026
HD HVAC OF NY INCGeneral Contractor107/08/2026
JAT CONSTRUCTION GROUP INGeneral Contractor107/08/2026
TORRES & BUILDERS GROUPGeneral Contractor107/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRENT M. PORTER, ARCHITEC4140108/20/2025
CMSC, INC6098108/20/2025
LB ENGINEERING PC3122711/04/2021
ALAN D MARCUS, PE1761306/24/2021
Building Lifecycle
All (30)Special Inspection (30)
05/13/2025
Special inspection requirement — Final
Jeremy Latterman
05/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Brent Porter
05/13/2025
Special inspection requirement — Post-installed Anchors
EDUARD GRINFELD
05/13/2025
Special inspection requirement — Mechanical Systems
Brent Porter
05/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
Brent Porter
05/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Brent Porter
05/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Brent Porter
11/05/2021
Special inspection requirement — Mechanical Systems
gwang jin oh
11/05/2021
Special inspection requirement — Maintenance information
gwang jin oh
11/05/2021
Special inspection requirement — HVAC insulation and sealing
gwang jin oh
11/05/2021
Special inspection requirement — Final
gwang jin oh
11/05/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
gwang jin oh
11/02/2021
Special inspection requirement — HVAC insulation and sealing
gwang jin oh
11/02/2021
Special inspection requirement — Final
gwang jin oh
11/02/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
gwang jin oh
11/02/2021
Special inspection requirement — Mechanical Systems
gwang jin oh
11/02/2021
Special inspection requirement — Maintenance information
gwang jin oh
10/10/2021
Special inspection requirement — HVAC insulation and sealing
gwang jin oh
10/10/2021
Special inspection requirement — Mechanical Systems
gwang jin oh
10/10/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
gwang jin oh
10/10/2021
Special inspection requirement — Final
gwang jin oh
10/10/2021
Special inspection requirement — Maintenance information
gwang jin oh
09/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
gwang jin oh
09/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
gwang jin oh
08/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
gwang jin oh
06/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alan Marcus
06/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alan Marcus
03/12/2020
Special inspection requirement — Final
MD TOHFAZ UDDIN
03/12/2020
Special inspection requirement — Final
MD TOHFAZ UDDIN
03/10/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
gwang jin oh
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTORRES & BUILDERS GROUP06/11/2026
DOB NOWPlumbingSigned-offFRANKIE PLBG & HTG L.L.C03/30/2026
DOB NOWPlumbingPermit IssuedCITYWIDE PLBG HTG & SPKLS02/12/2026
DOB NOWGeneral ConstructionSigned-offJAT CONSTRUCTION GROUP IN12/10/2025
DOB NOWSignSigned-offR.G.M. SIGNS INC02/05/2024
DOB NOWSignSigned-offELMER DAWSON08/28/2023
DOB NOWSignSigned-offELMER DAWSON08/28/2023
DOB NOWPlumbingSigned-offAVON PLBG & HTG INC10/27/2021
DOB NOWPlumbingSigned-offTRISTATE PLBG SVCS CORP06/08/2021
DOB NOWPlumbingSigned-offAVON PLBG & HTG INC09/30/2020
DOB NOWPlumbingSigned-offTRISTATE PLBG SVCS CORP06/08/2020
DOB NOWMechanical SystemsSigned-offHD HVAC OF NY INC03/21/2020
DOB NOWSupported ScaffoldSigned-offKING HOIST & SCAFFOLDING03/16/2020
DOB NOWConstruction FenceSigned-offKING HOIST & SCAFFOLDING03/16/2020
DOB NOWSidewalk ShedSigned-offKING HOIST & SCAFFOLDING03/16/2020
DOB NOWPlumbingSigned-offAVON PLBG & HTG INC02/14/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC08/03/2018
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/26/2018
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC06/07/2018
BISPLISSUEDTRISTATE PLBG SVCS CORP07/21/2021
BISPLISSUEDTRISTATE PLBG SVCS CORP06/24/2021
BIS—ISSUEDJRM CONSTRUCTION MGMT LLC04/27/2021
BISOTISSUEDSTONEGATE BUILD INC03/03/2021
BISOTISSUEDSTONEGATE BUILD INC10/06/2020
BISOTISSUEDJRM CONSTRUCTION MGMT LLC06/12/2020
BISOTISSUEDJRM CONSTRUCTION MGMT LLC06/12/2020
BIS—ISSUEDJRM CONSTRUCTION MGMT LLC06/12/2020
BISMHISSUEDJRM CONSTRUCTION MGMT LLC06/12/2020
BISPLISSUEDTRISTATE PLBG SVCS CORP03/05/2020
BISPLISSUEDTRISTAR PLBG & HTG INC09/13/2019
BISOTISSUEDALL-RITE CONSTRUCTION CO07/31/2019
BISOTISSUEDTRANSPARENT CONSTRUCTION06/12/2019
BISOTISSUEDTRANSPARENT CONSTRUCTION06/12/2019
BISMHISSUEDTRANSPARENT CONSTRUCTION06/12/2019
BISOTISSUEDALL-RITE CONSTRUCTION CO03/01/2019
BIS—ISSUEDMONTANA ELECTRICAL DECORATING SV11/03/2004
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM IN12/06/2002
BISOTISSUEDKORMAN DESIGN & BUILD10/31/2002
BISOTISSUEDBERGER SIGN FABRICTION,INC.06/13/2001
BISOTISSUEDSERV SIGN ERE COINC06/05/2001
+ 6 more permits on file
1 project · most recent 08/20/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2025Permit IssuedTORRES & BUILDERS GROUPHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AOU36RLXFZ1 36,400 BTU · Condensing Unit ×1
AOU45RLXFZ 48,000 BTU · Condensing Unit ×1
2 projects · most recent 01/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/07/2026Permit IssuedDYNAMIC PLBG & SPRKLR CORGas
08/20/2025Signed-offFRANKIE PLBG & HTG L.L.CWater/Sanitary
7 projects · most recent 03/06/2025
General Wiring Lighting
FiledStatusContractorScope
03/06/2025CompleteC. W. GREENE INCGeneral Wiring
06/18/2020CompleteNASH ELECTRIC SERVICES IN—
01/29/2020CompleteY.S ELECTRICGeneral Wiring, Lighting
09/11/2019CompletePHILIP A. ROBINSONGeneral Wiring
08/01/2019CompleteHIG ELECTRIC ASSC NYC INC2 meters, 2 new_meters
06/12/2019CompleteHIG ELECTRIC ASSC NYC INC—
06/04/2018CompleteBOROWIDE ELECT'L CONTR'S—
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/13/2025FinalJeremy Lattermanprogress
05/13/2025Energy Code Compliance InspectionsBrent Porterprogress
05/13/2025Post-installed AnchorsEDUARD GRINFELDspecial
05/13/2025Mechanical SystemsBrent Porterspecial
05/13/2025HVAC-R and service water heating system controlsBrent Porterenergy_progress
05/13/2025HVAC-R and service water heating equipmentBrent Porterenergy_progress
05/13/2025HVAC-R and service water piping design and insulationBrent Porterenergy_progress
11/05/2021Mechanical Systemsgwang jin ohspecial
11/05/2021Maintenance informationgwang jin ohenergy_progress
11/05/2021HVAC insulation and sealinggwang jin ohenergy_progress
11/05/2021Finalgwang jin ohprogress
11/05/2021Structural Stability – Alterations of existing buildingsgwang jin ohspecial
11/02/2021HVAC insulation and sealinggwang jin ohenergy_progress
11/02/2021Finalgwang jin ohprogress
11/02/2021Structural Stability – Alterations of existing buildingsgwang jin ohspecial
11/02/2021Mechanical Systemsgwang jin ohspecial
11/02/2021Maintenance informationgwang jin ohenergy_progress
10/10/2021HVAC insulation and sealinggwang jin ohenergy_progress
10/10/2021Mechanical Systemsgwang jin ohspecial
10/10/2021Structural Stability – Alterations of existing buildingsgwang jin ohspecial
10/10/2021Finalgwang jin ohprogress
10/10/2021Maintenance informationgwang jin ohenergy_progress
09/09/2021Fire-Resistant Penetrations and Jointsgwang jin ohspecial
09/02/2021Fire-Resistant Penetrations and Jointsgwang jin ohspecial
08/26/2021Fire-Resistant Penetrations and Jointsgwang jin ohspecial
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SamwoojungRestaurant / Food Service—
Project M00878677 Alteration · LOC Issued · 08/23/2023
Project M00919737 Alteration · LOC Issued · 08/23/2023
Ian Hand HospitalityRestaurant / Food Service—
Project M00303921 Alteration · LOC Issued · 02/05/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
Nothing on file for this building.