← Back
Two family converted from one family
140 WINTER AVENUE
STATEN ISLAND · St. George-New Brighton · BIN 5000927
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R3AZoning
2,208 sfGross Floor Area
2Units
Rent Stabilized9 Open Violations 4 unresolved · 5 paperwork only ▸FDNY Report ↗
Two family converted from one family · 1,109 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE209/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GRINBERG MANAGEMENT203/21/2026
Building Lifecycle
All (86)Filed (2)Violation (25)Objection (46)Special Inspection (13)
01/08/2026
Objection resolved — Addressed
12/29/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
11/06/2025
Objection raised — Zoning
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Objection resolved — Addressed
10/17/2025
Special inspection requirement — Fenestration air leakage
10/15/2025
Objection raised — Zoning
10/15/2025
Objection raised — Scope
10/14/2025
Objection raised — Zoning
10/14/2025
Objection raised — Zoning
09/25/2025
Filed — Alteration CO
INTERIOR CONVERSION OF EXISTING ONE FAMILY TO 2 FAMILY,LEGALIZE ATTIC AS PART OF LIVING SPACE TO 3RD FLOOR, CONVERT BASEMENT TO A CRAWL SPACE
S01170537-S1
09/24/2025
Special inspection requirement — Permanent certificate
09/24/2025
Special inspection requirement — Electric vehicle service equipment requirements
09/24/2025
Special inspection requirement — Maintenance information
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
04/18/2025
Objection raised — Scope
04/18/2025
Objection raised — Scope
04/18/2025
Objection raised — Zoning
04/18/2025
Objection raised — Fire_Protection
04/18/2025
Objection raised — Plumbing
04/18/2025
Objection raised — Fire_Protection
04/18/2025
Objection raised — Fire_Protection
04/18/2025
Objection raised — Zoning
04/18/2025
Objection raised — Structural
04/14/2025
Objection resolved — Addressed
04/13/2025
Objection resolved — Addressed
04/13/2025
Objection resolved — Addressed
03/13/2025
Objection raised — Zoning
03/13/2025
Objection raised — Zoning
03/13/2025
Objection raised — Scope
03/13/2025
Objection raised — Zoning
03/13/2025
Objection raised — Inspections
03/13/2025
Objection raised — Energy
03/13/2025
Objection raised — Admin
03/13/2025
Objection raised — Admin
03/13/2025
Objection raised — Admin
03/13/2025
Objection raised — Energy
03/10/2025
Filed — Alteration CO
INTERIOR CONVERSION OF EXISTING ONE FAMILY TO 2 FAMILY,LEGALIZE ATTIC AS PART OF LIVING SPACE TO 3RD FLOOR, CONVERT BASEMENT TO A CRAWL SPACE
S01170537-I1
01/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
01/22/2025
Special inspection requirement — Interior lighting power
01/22/2025
Special inspection requirement — Metering
01/22/2025
Special inspection requirement — Insulation placement and R values
01/22/2025
Special inspection requirement — Fenestration areas
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Latest 60 of 86 events.
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
11/10/2025Subsurface Investigations (Borings/Test Pits)—special
10/17/2025Fenestration air leakage—energy_progress
09/24/2025Permanent certificate—energy_progress
09/24/2025Electric vehicle service equipment requirements—energy_progress
09/24/2025Maintenance information—energy_progress
01/22/2025Fenestration and door U-factor and product ratings—energy_progress
01/22/2025Interior lighting power—energy_progress
01/22/2025Metering—energy_progress
01/22/2025Insulation placement and R values—energy_progress
01/22/2025Fenestration areas—energy_progress
01/22/2025Fire-Resistant Penetrations and Joints—special
01/22/2025Fire-Resistance Rated Construction—progress
01/22/2025Energy Code Compliance Inspections—progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026S01170537-S1Request digital key ↗
08/15/2026S01170537-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01170537-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026S01170537-S1Open ↗
08/18/2026S01170537-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S01170537-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026S01170537-S1Open ↗
08/15/2026S01170537-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026S01170537-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/15/2026S01170537-I1Open ↗