Condo, residential tower (mixed-use, multi-family elevator) [derived]
1400 5TH AVENUE
MANHATTAN · BIN 1086518
💬 Discuss this project
2003Year Built
8Stories
RMBuilding Class
C4-5XZoning
194,788 sfGross Floor Area
175Units
LL97 CoveredRent Stabilized22 Active Violations 19 unresolved · 3 paperwork only 8 likely answered ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 54,918 sf lot · 3.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsFISP repairs1 filing
Floor 6Unit 6F1p · 1 filing · 6 docs
Floor 5
Floor 4
Floor 3
Floor 2Unit 2W1 filing · 7 docs
Floor 1The Village CDC, Care Plasma12p · 9 filings · 20 docs
CellarCare Plasma8p · 5 filings · 17 docs
Sub-BasementCare Plasma2 filings · 6 docs
Site & exteriorSidewalk shed installation2 filings · 4 docs
Filed — no permit issuedFISP Repairs - Roof and Beams1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Aac Realty3510/04/2026
1400 5th Commercial3103/21/2026
NYC Department of Housing Preservation and Development2003/21/2026
1400 Fifth Avenue Condominium1503/21/2026
1400 Retail Owners1003/21/2026
NYC Partnership Housing Development903/21/2026
AAC603/21/2026
Ashkenazy Acquisition503/21/2026
1400 Fifth Ave503/21/2026
1400 5 Avenue403/21/2026
Maxwell Kate103/21/2026
MT Bethel Baptist Church103/21/2026
Owners of Apt 5A103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC Engineering1009/09/2026
SDC406/13/2025
Stavros I. Malliaros, P.E307/11/2024
Jgarchitects312/22/2023
Ashraf111/02/2023
Alnour Consulting208/31/2023
VP Architectural Design206/01/2023
Allen Shinfeld, P.E106/01/2023
WW Engineering305/22/2023
Howard L Zimmerman Arch & Engineering104/25/2023
Andre Tchelistcheff Architects208/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KM Associates of New York903/21/2026
MK Exp303/21/2026
Jenny Flores Expediting403/21/2026
Rigid Structural Design103/21/2026
CH Cornerstone Design803/21/2026
J.A.M. Associates203/21/2026
Hlzae103/21/2026
Youn Design203/21/2026
K & M Associates903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLV ManagementGeneral Contractor507/08/2026
Spectra Construction & DevelopmentGeneral Contractor407/08/2026
Xpress Plumbing and HeatingPlumbing407/08/2026
EC SolutionsGeneral Contractor407/08/2026
Intersystems Installation S&SScaffold303/21/2026
A.R.L. Plumbing & HeatingPlumbing307/08/2026
Jepol ConstructionGeneral Contractor307/08/2026
Dionisos ConstructionGeneral Contractor203/21/2026
Amor ElectricElectrical203/21/2026
Amor ElectricGeneral Contractor203/22/2026
New Grand ElectricElectrical203/21/2026
Crossfield Plumbing & HeatingPlumbing207/08/2026
Oliva ThomasElectrical103/21/2026
Euro-Tech Contracting Co*General Contractor104/09/2026
M.C. Electrical NYElectrical103/21/2026
Dudley & Associates Lic. ElectricElectrical103/21/2026
Dudley JamalElectrical103/21/2026
Neptune Signs & AwningsSign hanger107/08/2026
Dudley & Associates Lic. ElectricElectrical103/22/2026
Daven ElectricElectrical103/21/2026
Crossfield Plumbing & HeatingFire Protection107/08/2026
?Thomas OlivaElectrical103/21/2026
Metflow Fire ControlFire Protection108/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Beyond Arch36001009/09/2026
Integrity Consulting Service666106/13/2025
Engineering Consulting SE2050207/11/2024
Amaracon Testing & Inspec5842408/31/2023
Alnour Consulting Engineering607208/31/2023
Crosscheck Inspection Services544506/01/2023
Howard L Zimmerman Architects1712104/25/2023
Building Lifecycle
All (217)Filed (32)Permit Issued (25)Signed Off (17)Facade (FISP) (12)Violation (60)Inspection (22)Objection (19)Special Inspection (30)
10/08/2026
Signed off — Alteration
M00877579-I1
09/09/2026
Filed — Alteration CO
re-route of existing ductwork for hvac. toilet exhaust fan for bathroom on first floor
M00884038-P5
08/31/2026
Special inspection requirement — Fire-Resistance Rated Construction
Hackjong Choi
08/31/2026
Special inspection requirement — Interior lighting power
Hackjong Choi
08/31/2026
Special inspection requirement — Lighting controls
Hackjong Choi
08/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
08/05/2026
Permit issued — Sprinklers
M00877579-I1-EW-SP
06/08/2026
Signed off — Alteration
Removal of interior non loading bearing partitions only
M00819571-I1
06/05/2026
Signed off — Alteration
INTERIOR TENANT FIT-OUT WORK FOR CARE PLASMA, LLC SPACE
M00880852-I1
06/05/2026
Signed off — Alteration
THE DOMESTIC HOT WATER THAT PREVIOUSLY SERVED THE ORIGINAL 1ST FLOOR ANDCELLAR TENANT SHALL BE REQUIRE TO HAVE IT DISTRIBUTION PIPING CUT BACK UPONDEMOLITION FOR ALL SPACE NOT BEING OCCUPIED. ANY NEW FUTURE TENANTSSHALL BE REQUIRED (SEE COMMENTS)
M00877532-I1
04/08/2026
Special inspection requirement — Lighting controls
Hackjong Choi
04/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/08/2026
Special inspection requirement — Interior lighting power
Hackjong Choi
04/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
04/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
Hackjong Choi
03/31/2026
Violation issued (ECB, open)
Boilers
03/31/2026
Violation issued (ECB, open)
Boilers
03/23/2026
Filed — Alteration CO
re-route of existing ductwork for hvac. toilet exhaust fan for bathroom on first floor
M00884038-P4
02/11/2026
Signed off — Alteration CO
re-route of existing ductwork for hvac. toilet exhaust fan for bathroom on first floor
M00884038-S2
02/11/2026
Signed off — Alteration CO
re-route of existing ductwork for hvac. toilet exhaust fan for bathroom on first floor
M00884038-S1
02/05/2026
Signed off — Alteration
M00877490-I1
01/09/2026
Signed off — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF SECOND FLOOR BATHROOM OF TOWNHOUSE D1. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01240573-I1
12/12/2025
Signed off — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF SECOND FLOOR BATHROOM OF TOWNHOUSE D1. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01240573-S1
11/21/2025
Permit issued — Mechanical Systems
M00884038-S2-MS
11/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/30/2025
Objection resolved — Addressed
09/23/2025
Special inspection requirement — Shutoff dampers
Hackjong Choi
09/17/2025
Filed — Alteration CO
re-route of existing ductwork for hvac. toilet exhaust fan for bathroom on first floor
M00884038-P3
09/17/2025
Objection raised — Admin
09/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/11/2025
Special inspection requirement — Interior lighting power
Hackjong Choi
09/11/2025
Special inspection requirement — Lighting controls
Hackjong Choi
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hackjong Choi
09/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Hackjong Choi
09/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/03/2025
Filed — Alteration CO
re-route of existing ductwork for hvac. toilet exhaust fan for bathroom on first floor
M00884038-S2
08/15/2025
Signed off — Alteration
Bathroom renovation on apartment unit 6F. No change in use, egress or occupancy
M01096152-S1
08/15/2025
Signed off — Alteration
Bathroom renovation on apartment unit 6F. No change in use, egress or occupancy
M01096152-I1
08/13/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/29/2025
Permit issued — General Construction
M01240573-I1-GC
06/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2025
Permit issued — Plumbing
M01240573-S1-PL
06/13/2025
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF SECOND FLOOR BATHROOM OF TOWNHOUSE D1. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01240573-I1
06/13/2025
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF SECOND FLOOR BATHROOM OF TOWNHOUSE D1. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01240573-S1
06/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
Karl Stewart
06/12/2025
Special inspection requirement — Final
Karl Stewart
06/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/11/2025
Objection resolved — Resolved
06/10/2025
Objection resolved — Resolved
06/03/2025
Objection raised — Cost
06/03/2025
Objection raised — Cost
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/14/2025
Filed — Alteration
HEREBY FILIGN FOR THE REPLACEMENT AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01219507-S1
05/05/2025
Special inspection requirement — Final
Hackjong Choi
05/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Hackjong Choi
05/05/2025
Special inspection requirement — Mechanical Systems
Hackjong Choi
Latest 60 of 217 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offMetflow Fire Control08/05/2026
DOB NOWMechanical SystemsSigned-offEC Solutions11/21/2025
DOB NOWGeneral ConstructionSigned-offEuro-Tech Contracting Co*07/29/2025
DOB NOWPlumbingSigned-offA.R.L. Plumbing & Heating06/25/2025
DOB NOWSprinklersSigned-offCrossfield Plumbing & Heating11/18/2024
DOB NOWPlumbingSigned-offXpress Plumbing and Heating10/31/2024
DOB NOWPlumbingSigned-offXpress Plumbing and Heating10/15/2024
DOB NOWGeneral ConstructionPermit IssuedEC Solutions10/02/2024
DOB NOWGeneral ConstructionSigned-offEC Solutions09/06/2024
DOB NOWGeneral ConstructionPermit IssuedMatthew Gerstung06/24/2024
DOB NOWGeneral ConstructionSigned-offHudson Meridian Construction GP02/01/2024
DOB NOWGeneral ConstructionSigned-offHudson Meridian Construction GP01/03/2024
DOB NOWSidewalk ShedSigned-offIntersystems Installation S&S11/03/2023
DOB NOWMechanical SystemsSigned-offBLV Management09/28/2023
DOB NOWGeneral ConstructionSigned-offBLV Management09/28/2023
DOB NOWStructuralSigned-offSpectra Construction & Development09/12/2023
DOB NOWGeneral ConstructionSigned-offSpectra Construction & Development09/11/2023
DOB NOWGeneral ConstructionSigned-offHudson Meridian Construction GP09/08/2023
DOB NOWSignSigned-offNeptune Signs & Awnings06/22/2023
DOB NOWGeneral ConstructionSigned-offBLV Management06/06/2023
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating06/06/2023
DOB NOWSprinklersSigned-offCrossfield Plumbing & Heating06/05/2023
DOB NOWMechanical SystemsSigned-offBLV Management06/01/2023
DOB NOWGeneral ConstructionSigned-offBLV Management02/13/2023
DOB NOWPlumbingSigned-offA.R.L. Plumbing & Heating08/06/2021
BISPLISSUEDFred Smith P&H Co01/18/2022
BISPLISSUEDMaxwell Plumbing Mechanical08/17/2021
BISBLISSUEDMaxwell Plumbing Mechanical08/17/2021
BISOTISSUEDFinix U.S.A. Construction02/08/2021
BISPLISSUEDFred Smith P&H Co12/28/2020
BISPLISSUEDFred Smith P&H Co12/18/2019
BISOTISSUEDNoel Pompey08/06/2018
BISOTISSUEDNoel Pompey03/16/2018
BISOTISSUEDNew England Carpentry11/30/2017
BISMHISSUEDOleary Contracting08/10/2017
BISOTISSUEDOleary Contracting07/24/2017
BISMHISSUEDEveryday Mechanical06/09/2017
BIS—ISSUEDCad Signs NYC05/19/2017
BISOTISSUED3584 Construction04/27/2017
BISPLISSUEDEveryday Mechanical04/21/2017
+ 35 more permits on file
1 project · most recent 09/09/2026
Others
FiledStatusContractorScopeMake / Model / Capacity
09/09/2026Signed-offEC SolutionsOthers
Other
Greenheck SQ-90-VG1X-QD 500 CFM · Exhaust Fan ×1
__Junk__ re-reoute hvac ductwork ×1
4 projects · most recent 09/09/2026
Water/Sanitary
FiledStatusContractorScope
09/09/2026Signed-offXpress Plumbing and HeatingWater/Sanitary
05/14/2025——Water/Sanitary
07/11/2024——Water/Sanitary
05/22/2023Signed-offCrossfield Plumbing & HeatingWater/Sanitary
11 projects · most recent 10/13/2025
General Wiring
FiledStatusContractorScope
10/13/2025Permit IssuedDaven ElectricGeneral Wiring
09/23/2025CompleteAmor ElectricGeneral Wiring
12/09/2024CompleteDudley & Associates Lic. ElectricGeneral Wiring
09/20/2024CompleteAmor Electric—
01/14/2024CompleteAtmos Electric Svce1 meters, 1 new_meters
10/21/2023CompleteAUR0RA Electrical Contg—
06/12/2023CompleteGoodall Electric—
06/02/2023CompleteJong Hyun Kim—
08/08/2022CompletePalant Electrical Contracting—
01/22/2022CompleteGotham Wiring Licensed—
05/05/2021Permit IssuedRobert Chimenti9 meters, 1 new_meters
1 project · most recent 06/07/2023
Steel Concrete
FiledStatusContractorScope
06/07/2023——Steel, Concrete
1 project · most recent 11/21/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
11/21/2023——Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
11/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/13/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
03/12/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/21/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/19/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
12/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/11/2023Pass-Final Sign Permit InspectionPassView ↗
08/30/2023Fail-Final Sign Permit InspectionFailView ↗
07/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/31/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/19/2023Fail-Final Sign Permit InspectionFailView ↗
07/07/2023Fail-Final Sign Permit InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
08/31/2026Fire-Resistance Rated ConstructionHackjong Choiprogress
08/31/2026Tenant Protection Plan Compliance—special
08/31/2026Fire-Resistant Penetrations and JointsHackjong Choispecial
08/31/2026Interior lighting powerHackjong Choienergy_progress
08/31/2026Lighting controlsHackjong Choienergy_progress
04/08/2026Tenant Protection Plan Compliance—special
04/08/2026Fire-Resistance Rated ConstructionHackjong Choiprogress
04/08/2026Lighting controlsHackjong Choienergy_progress
04/08/2026Interior lighting powerHackjong Choienergy_progress
04/08/2026Fire-Resistant Penetrations and JointsHackjong Choispecial
09/23/2025Shutoff dampersHackjong Choienergy_progress
09/12/2025Tenant Protection Plan Compliance—special
09/11/2025Fire-Resistant Penetrations and JointsHackjong Choispecial
09/11/2025Fire-Resistance Rated ConstructionHackjong Choiprogress
09/11/2025Lighting controlsHackjong Choienergy_progress
09/11/2025Interior lighting powerHackjong Choienergy_progress
06/12/2025FinalKarl Stewartprogress
06/12/2025Fire-Resistance Rated ConstructionKarl Stewartprogress
06/12/2025Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
05/05/2025HVAC-R and service water heating system controlsHackjong Choienergy_progress
05/05/2025Fire-Resistant Penetrations and JointsHackjong Choispecial
05/05/2025Tenant Protection Plan ComplianceHackjong Choispecial
05/05/2025HVAC-R and service water heating system controlsHackjong Choienergy_progress
05/05/2025HVAC-R and service water piping design and insulationHackjong Choienergy_progress
05/05/2025HVAC-R and service water heating equipmentHackjong Choienergy_progress
Latest 25 of 76.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Village CDCOfficeFloor 1
Project M00884038 Alteration CO · Permit Entire · 10/19/2023
Care PlasmaMedical / HealthcareCellar, Sub-basement, Floor 1
Project M00880852 Alteration · LOC Issued · 06/01/2023
Project M00852609 Alteration · Filing Withdrawn · 05/30/2023
Project M00819571 Alteration · LOC Issued · 02/01/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 758 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch29
08/31/2026M00819571-I1Request digital key ↗
08/31/2026M00835958-I1Request digital key ↗
08/31/2026M00877490-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00424416-I1Request digital key ↗
08/14/2026M00424416-P1Request digital key ↗
▸Applications & Permits123
▸BISPLAN / WORK APPROVAL APPLICATION63
02/09/2024120696988Open ↗
01/31/2024120696988Open ↗
04/13/2023120696988Open ↗
Showing 3 of 63 on file for this type
▸BISWORK PERMIT APPLICATION57
08/18/2021110356944Open ↗
08/18/2021110356944Open ↗
06/14/2021140985487Open ↗
Showing 3 of 57 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT I- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
01/18/2024120696988Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/18/2024120696988Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00884038-I1Open ↗
▸Seals & Professional Certifications215
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION68
06/03/2019123687288Open ↗
04/10/2019123384523Open ↗
03/27/2019140567713Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
10/05/2026M00884038-P5Open ↗
09/03/2026M00424416-I1Open ↗
08/31/2026M00819571-I1Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT23
12/26/2018140567713Open ↗
03/12/2018123384523Open ↗
07/20/2017140659874Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
10/05/2026M00884038-P5Open ↗
10/05/2026M00884038-P5Open ↗
09/27/2026M00884038-S1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST22
12/26/2018140567713Open ↗
03/12/2018123384523Open ↗
05/31/2017123084107Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
10/05/2026M00884038-P5Open ↗
09/27/2026M00884038-S1Open ↗
09/27/2026M00884038-S1Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
07/20/2017140659874Open ↗
06/08/2017140653898Open ↗
Showing 2 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
07/20/2017140659874Open ↗
06/08/2017140653898Open ↗
Showing 2 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/09/2020140985487Open ↗
10/19/2020140963982Open ↗
▸Trade Schedules & Equipment43
▸BISSCHEDULE B - PLUMBING14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
06/03/2019123687288Open ↗
02/07/2019140567713Open ↗
04/16/2018140567713Open ↗
Showing 3 of 7 on file for this type
▸BISSIGN HANGER CERTIFICATE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS4
11/02/2017140653898Open ↗
Showing 1 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/02/2017140653898Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection18
▸BISTENANT PROTECTION PLAN AND NOTES8
07/20/2017140659874Open ↗
06/08/2017140653898Open ↗
10/29/2020140963982Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStreet Tree Checklist5
10/05/2026M00884038-P5Open ↗
08/13/2026M00884038-P1Open ↗
08/13/2026M00884038-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan2
09/03/2026M00424416-I1Open ↗
08/13/2026M00424416-P1Open ↗
▸BISSTREET TREE SIGNOFF1
01/18/2024120696988Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
12/09/2020140985487Open ↗
▸Environmental & Asbestos16
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
06/08/2017140653898Open ↗
Showing 1 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance59
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
12/17/2019123687288Open ↗
07/02/2019123687288Open ↗
04/10/2019123384523Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
10/31/2022121003323Open ↗
10/25/2022121003323Open ↗
09/21/2022121003323Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
12/09/2020140985487Open ↗
10/19/2020140963982Open ↗
07/20/2017140659874Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS7
07/20/2017140659874Open ↗
06/08/2017140653898Open ↗
Showing 2 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY17
11/02/2022121003323Open ↗
10/31/2022121003323Open ↗
10/31/2022121003323Open ↗
Showing 3 of 17 on file for this type
▸Approvals, Objections & Sign-offs70
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST44
10/25/2022121003323Open ↗
01/26/2021120696988Open ↗
11/04/2020120696988Open ↗
Showing 3 of 44 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
02/09/2024120696988Open ↗
01/31/2024120696988Open ↗
Showing 2 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/08/2017140630636Open ↗
11/08/2017140653898Open ↗
▸Cost, Insurance & Ownership69
▸BISCOST AFFIDAVIT66
10/31/2022121003323Open ↗
10/25/2022121003323Open ↗
10/21/2022121003323Open ↗
Showing 3 of 66 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
02/08/2021140963982Open ↗
Showing 1 of 3 on file for this type
▸Filing & Intake Forms80
▸BISEFILING COVER SHEET28
06/03/2019123687288Open ↗
03/12/2018123384523Open ↗
05/31/2017123084107Open ↗
Showing 3 of 28 on file for this type
▸BISADDITIONAL INFORMATION23
05/31/2022121003323Open ↗
10/29/2020140963982Open ↗
06/03/2019123687288Open ↗
Showing 3 of 23 on file for this type
▸BISBOROUGH INTAKE FORM19
08/18/2021110356944Open ↗
08/18/2021110356944Open ↗
03/10/2020120696988Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
12/09/2020140985487Open ↗
10/19/2020140963982Open ↗
07/20/2017140659874Open ↗
Showing 3 of 10 on file for this type
▸Other Documents13
▸DOB NOWProperty Ownership Certification5
10/05/2026M00884038-P5Open ↗
08/24/2026M00884038-I1Open ↗
08/24/2026M00884038-P4Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations1
08/13/2026M00964992-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00964992-I1Open ↗