Office, 20+ stories, with or without commercial
1400 BROADWAY
MANHATTAN · BIN 1015266
💬 Discuss this project
1930Year Built
35Stories
O4Building Class
C5-3Zoning
768,321 sfGross Floor Area
88Units
LL97 Covered0 Open ViolationsFISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: 112-1400 TRADE PROPERTIES LLC · 28,950 sf lot · 26.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionFire AlarmLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof11p · 4 filings · 20 docs
Floor 376p · 3 filings · 19 docs
Floor 364p · 3 filings · 19 docs
Floor 355p · 4 filings · 20 docs
Floor 343p · 2 filings · 10 docs
Floor 332p · 2 filings · 13 docs
Floor 32Under Construction10p · 4 filings · 20 docs
Floor 311p · 1 filing · 9 docs
Floor 304p · 4 filings · 20 docs
Floor 2915p · 5 filings · 20 docs
Floor 281p · 1 filing · 9 docs
Floor 277p · 6 filings · 20 docs
Floor 2612p · 7 filings · 20 docs
Floor 2519p · 8 filings · 20 docs
Floor 2416p · 10 filings · 20 docs
Floor 239p · 5 filings · 20 docs
Floor 2210p · 5 filings · 19 docs
Floor 212p · 1 filing · 5 docs
Floor 20
Floor 19
Floor 181p · 1 filing · 3 docs
Floor 174p · 3 filings · 20 docs
Floor 1612p · 4 filings · 20 docs
Floor 153p · 1 filing · 5 docs
Floor 1418p · 7 filings · 20 docs
Floor 1317p · 7 filings · 20 docs
Floor 12
Floor 115p · 3 filings · 20 docs
Floor 10
Floor 9
Floor 81p · 1 filing · 7 docs
Floor 73p · 3 filings · 20 docs
Floor 65p · 5 filings · 20 docs
Floor 518p · 14 filings · 20 docs
Floor 415p · 12 filings · 20 docs
Floor 311p · 7 filings · 20 docs
Floor 210p · 9 filings · 20 docs
Floor 140p · 14 filings · 20 docs
Mezzanine4p · 1 filing · 20 docs
CellarUnder Construction19p · 10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EMPIRE STATE REALTY TRUST, INC66509/13/2026
1400 BROADWAY17907/08/2026
ESRT4007/08/2026
PLATINUM SERVICES NY2307/08/2026
SIGNEXPO707/08/2026
TLG SON CONTRACTING407/08/2026
112-1400 TRADE PROPERTIES LLC403/22/2026
PLAZA CONSTRUCTION103/22/2026
LHOISE CORP103/22/2026
12-1400 TRADE PROPERTIES103/22/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVERGREEN BUILDERS & CON*General Contractor3707/08/2026
BENCHMARK BUILDERS LLCGeneral Contractor2907/08/2026
J.A. JENNINGS, INCGeneral Contractor2307/08/2026
RINNOVO CONSTRUCTION, LLCGeneral Contractor2107/08/2026
A&A PLUMBING CORPPlumbing1407/08/2026
CORE FOUR CONSTRUCTION INGeneral Contractor1307/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor1307/08/2026
INTERIOR BUILDERS GROUPGeneral Contractor1007/08/2026
DENKO MECHANICAL INCFire Protection707/08/2026
NY ELECT MAINT & DATA CORElectrical603/22/2026
SATO CONSTRUCTION CO.INCGeneral Contractor607/08/2026
SPK/LEWIS CONSTRUCTION LLGeneral Contractor603/21/2026
EXCEL INTERIOR CONSTRUCTIONGeneral Contractor607/08/2026
PAR FIRE PROTECTION LLCFire Protection607/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor507/08/2026
DANTON PLBG & HTG CORPPlumbing507/08/2026
TRISTATE PLBG SVCS CORPFire Protection507/08/2026
PSI PARTNERS, LLCFire Protection507/08/2026
FOLOR INCGeneral Contractor506/02/2026
RED HOOK SIGN ELECTScaffold407/08/2026
TRISTATE PLBG SVCS CORPPlumbing407/08/2026
ENOBRAC PLUMBING, INCFire Protection407/08/2026
AGGRESSIVE FIRE PROT LLCFire Protection307/08/2026
RUSS FLAUMElectrical303/21/2026
OKANE ENTERPRIESES LTDGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WINTON GROUP ARCHITECTURE4343407/28/2026
FACTORY ENGINEERING WORKS8855107/28/2026
CODEGREEN51012603/25/2026
SE INSPECTIONS7486102/17/2026
GILSANZ MURRAY STEFICEK240202/04/2026
SOLANKI ENGINEERING, P.C.8451101/03/2024
AUTOGRAPHIC CO1579702/04/2022
THOMAS VELTRE, P.E, P.C.459601/08/2021
Building Lifecycle
All (300)Filed (57)Permit Issued (80)Signed Off (56)Facade (FISP) (6)Violation (1)Inspection (60)Objection (10)Special Inspection (30)
08/24/2026
Signed off — Alteration
INITIAL INDUSTRIAL ROPE ACCESS CD5 FISP. INSPECTION
M01421101-I1
07/29/2026
Signed off — Alteration
M01357891-I1
07/28/2026
Filed — Alteration
plumbing modifications taking place on the cellar & 1st floor as per plans filed herewith. No change in use, egress or occupancy
M01422018-S4
07/28/2026
Filed — Alteration
plumbing modifications taking place on the cellar & 1st floor as per plans filed herewith. No change in use, egress or occupancy
M01422018-S2
07/28/2026
Filed — Alteration
plumbing modifications taking place on the cellar & 1st floor as per plans filed herewith. No change in use, egress or occupancy
M01422018-S3
07/28/2026
Filed — Alteration
plumbing modifications taking place on the cellar & 1st floor as per plans filed herewith. No change in use, egress or occupancy
M01422018-S1
07/27/2026
Filed — Alteration
plumbing modifications taking place on the cellar & 1st floor as per plans filed herewith. No change in use, egress or occupancy
M01422018-I1
07/08/2026
Permit issued — Suspended Scaffold
M01421101-I1-SC
07/02/2026
Objection resolved — Addressed
07/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Vladimir Kaushansky
07/02/2026
Special inspection requirement — Shutoff dampers
Vladimir Kaushansky
07/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Vladimir Kaushansky
07/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Vladimir Kaushansky
07/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
Vladimir Kaushansky
07/02/2026
Special inspection requirement — Maintenance information
Vladimir Kaushansky
07/01/2026
Objection raised — Other
06/24/2026
Special inspection requirement — Final
Vladimir Kaushansky
06/24/2026
Special inspection requirement — Interior lighting power
Vladimir Kaushansky
06/24/2026
Special inspection requirement — Structural Steel - Details
Kui He
06/24/2026
Special inspection requirement — Sprinkler Systems
Vladimir Kaushansky
06/24/2026
Special inspection requirement — Structural Steel - Welding
Kui He
06/24/2026
Special inspection requirement — Final
Egbert Chu
06/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Vladimir Kaushansky
06/24/2026
Special inspection requirement — Lighting controls
Vladimir Kaushansky
06/24/2026
Special inspection requirement — Final
Kui He
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
06/24/2026
Special inspection requirement — Mechanical Systems
Vladimir Kaushansky
06/23/2026
Filed — Alteration
INITIAL INDUSTRIAL ROPE ACCESS CD5 FISP. INSPECTION
M01421101-I1
06/16/2026
Signed off — Alteration
Mechanical modifications taking place on the 13th & 14th Fl construction 14 & 15th marketing floor as per plans filed herewith. No change in use, egress or occupancy
M01134816-I1
05/28/2026
Signed off — Alteration
Structural modifications taking place on the the 13th & 14th Fl construction 14 & 15th marketing floor floor as per plans filed herewith. No change in use, egress or occupancy
M01135148-I1
05/12/2026
Permit issued — Supported Scaffold
M01224007-I1-SF
04/30/2026
Permit issued — Mechanical Systems
M01371271-I1-MS
04/21/2026
Signed off — Alteration
Standpipe modifications on the 13th & 14th Fl construction 14 & 15th marketing floor as per plans filed here with. no change in use, egress or occupancy.
M01134835-I1
04/03/2026
Signed off — Alteration
Sprinkler modifications taking place on the 21st FL Construction/ 22nd Fl Marketing floor as per plans filed herewith. No change in use, egress or occupancy
M08027762-I1
03/25/2026
Signed off — Alteration
M08027743-I1
03/25/2026
Filed — Alteration
Mechanical modifications taking place on the Cellar & 1st floors as per plans filed herewith. No change in use, egress or occupancy
M01371271-I1
03/23/2026
Signed off — Alteration
Sprinkler modifications taking place on the 3rd floor as per plans filed herewith. No change in use, egress or occupancy
M01079630-I1
03/16/2026
Signed off — Alteration
plumbing modifications taking place on the 21st FL Construction/ 22nd Fl Marketing floor as per plans filed herewith. No change in use, egress or occupancy
M08027758-I1
03/16/2026
Signed off — Alteration
Mechanical modifications taking place on the 3rd floor as per plans filed herewith. No change in use, egress or occupancy
M01079534-I1
03/16/2026
Signed off — Alteration
Mechanical modifications taking place on the 21st FL Construction/ 22nd Fl Marketing floor as per plans filed herewith. No change in use, egress or occupancy
M08027754-I1
03/13/2026
Signed off — Alteration
M01079511-I1
02/19/2026
Permit issued — General Construction
M01357891-I1-GC
02/18/2026
Permit issued — Structural
M01351975-I1-ST
02/17/2026
Filed — Alteration
M01357891-I1
02/10/2026
Special inspection requirement — Final
Spencer Goroff
02/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Spencer Goroff
02/04/2026
Filed — Alteration
Structural modifications taking place on the the 32nd Fl construction 33rd marketing floor as per plans filed herewith. No change in use, egress or occupancy
M01351975-I1
01/27/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Philip Murray
01/27/2026
Special inspection requirement — Sprayed fire-resistant materials
Philip Murray
01/27/2026
Special inspection requirement — Structural Steel - Welding
Philip Murray
01/27/2026
Special inspection requirement — Structural Steel - Details
Philip Murray
01/27/2026
Special inspection requirement — Concrete - Cast-In-Place
Philip Murray
01/27/2026
Special inspection requirement — Final
Philip Murray
01/23/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/23/2025
Cycle 9 facade report submitted
12/23/2025
Cycle 9 facade report signed — SAFE
12/18/2025
Signed off — Alteration
Sprinkler modifications taking place on the 13th & 14th Fl construction 14 & 15th marketing floor as per plans filed herewith. No change in use, egress or occupancy
M01134830-I1
12/04/2025
Cycle 9 facade inspection completed
12/02/2025
Signed off — Alteration
plumbing modifications taking place on the 13th & 14th Fl construction 14 & 15th marketing floor as per plans filed herewith. No change in use, egress or occupancy
M01134820-I1
12/01/2025
Signed off — Alteration
General construction modifications taking place on the 13th & 14th fl Construction/ 14th & 15th fl mArketing floors as per plans filed herewith. No change in use, egress or occupancy
M01134799-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSATO CONSTRUCTION CO. INC07/08/2026
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC05/12/2026
DOB NOWMechanical SystemsPermit IssuedFOLOR INC04/30/2026
DOB NOWGeneral ConstructionSigned-off4 MORI CONSTRUCTION INC02/19/2026
DOB NOWStructuralPermit IssuedRINNOVO CONSTRUCTION, LLC02/18/2026
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC11/12/2025
DOB NOWSprinklersPermit IssuedMORA FIRE PROTECTION LLC10/06/2025
DOB NOWPlumbingSigned-offDV PLUMBING INC10/01/2025
DOB NOWGeneral ConstructionPermit IssuedRINNOVO CONSTRUCTION, LLC09/30/2025
DOB NOWMechanical SystemsPermit IssuedRINNOVO CONSTRUCTION, LLC09/26/2025
DOB NOWMechanical SystemsSigned-offSATO CONSTRUCTION CO.INC05/14/2025
DOB NOWStructuralSigned-offSATO CONSTRUCTION CO.INC05/14/2025
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC05/13/2025
DOB NOWStructuralSigned-offJ.A. JENNINGS, INC04/17/2025
DOB NOWStandpipeSigned-offMORA FIRE PROTECTION LLC04/15/2025
DOB NOWGeneral ConstructionSigned-offJ.A. JENNINGS, INC04/14/2025
DOB NOWPlumbingSigned-offA&A PLUMBING CORP04/11/2025
DOB NOWMechanical SystemsSigned-offJ.A. JENNINGS, INC04/10/2025
DOB NOWStructuralSigned-offRINNOVO CONSTRUCTION, LLC02/28/2025
DOB NOWGeneral ConstructionSigned-offJ.A. JENNINGS, INC01/06/2025
DOB NOWMechanical SystemsSigned-offJ.A. JENNINGS, INC01/06/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC11/18/2024
DOB NOWPlumbingSigned-offDV PLUMBING INC10/30/2024
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR10/30/2024
DOB NOWMechanical SystemsSigned-offRINNOVO CONSTRUCTION, LLC10/25/2024
DOB NOWGeneral ConstructionSigned-offRINNOVO CONSTRUCTION, LLC10/21/2024
DOB NOWGeneral ConstructionSigned-offJ PHELAN CONSTRUCTION08/23/2024
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC08/16/2024
DOB NOWMechanical SystemsSigned-offJ PHELAN CONSTRUCTION08/16/2024
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP08/16/2024
DOB NOWStandpipeSigned-offLAWRENCE J. LEVINE07/24/2024
DOB NOWGeneral ConstructionSigned-offPHASE 3 INTERIORS LLC05/17/2024
DOB NOWStructuralPermit IssuedRINNOVO CONSTRUCTION, LLC04/22/2024
DOB NOWGeneral ConstructionSigned-offSPK/LEWIS CONSTRUCTION LL01/19/2024
DOB NOWMechanical SystemsSigned-offR&R CONTRACTING MGMT CORP01/18/2024
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC01/08/2024
DOB NOWStructuralSigned-offWHALEN CONSTRUCTION, INC12/07/2023
DOB NOWGeneral ConstructionSigned-offSATO CONSTRUCTION CO.INC12/04/2023
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC11/22/2023
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR10/10/2023
+ 60 more permits on file
2 projects · most recent 03/25/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2026Permit IssuedFOLOR INCAir Conditioning Systems
Cooling
Florida Heat Pump EC180-3HZC 153,700 BTU · Wshp ×1
04/10/2025Signed-offJ.A. JENNINGS, INCHeating and Air Conditioning Systems
Heat / Cool
Daikin RWEQ144TATJA-HR 12 tons · Vrf Outdoor ×6
RWEQ192TATJA-HR 16 tons · Vrf Outdoor ×2
RXTQ48TBVJUA 4 tons · Vrf Outdoor ×2
RWEQ120TATJA-HR 10 tons · Vrf Outdoor ×1
RWEQ96TATJA-HR 8 tons · Vrf Outdoor ×1
2 projects · most recent 07/28/2026
Sprinkler System
FiledStatusContractorScope
07/28/2026——Sprinkler System
09/25/2025Permit IssuedPSI PARTNERS, LLC164 heads
3 projects · most recent 07/28/2026
Water/Sanitary
FiledStatusContractorScope
07/28/2026——Water/Sanitary
09/25/2025———
08/15/2024Permit IssuedA&A PLUMBING CORPWater/Sanitary
25 projects · most recent 07/27/2026
General Wiring Lighting
FiledStatusContractorScope
07/27/2026Permit IssuedEMPIRE STATE ELEC MAINT &General Wiring
10/07/2025Permit IssuedOFF SHORE ELECTRIC CORP—
04/11/2025CompleteNY ELECT MAINT & DATA CORGeneral Wiring
04/11/2025CompleteNY ELECT MAINT & DATA CORGeneral Wiring
04/11/2025Permit IssuedNY ELECTRIC & DATACOM LLCGeneral Wiring
04/11/2025CompleteNY ELECT MAINT & DATA CORGeneral Wiring, Lighting
04/11/2025CompleteNY ELECTRIC & DATACOM LLCGeneral Wiring
04/11/2025Permit IssuedNY ELECTRIC & DATACOM LLCGeneral Wiring
04/11/2025Permit IssuedNY ELECTRIC & DATACOM LLCGeneral Wiring
03/26/2025CompleteA2K ELECTRIC CORPGeneral Wiring
02/25/2025CompleteCAMPBELL & DAWES LTD ELECGeneral Wiring
08/21/2024CompleteDENMAR ELECTRIC CORPGeneral Wiring
01/31/2024CompleteH. & L. ELECTRIC INCGeneral Wiring
12/08/2023Permit IssuedNY ELECT MAINT & DATA CORGeneral Wiring
11/21/2023CompleteMIKOMA ELECTRIC LLCGeneral Wiring
4 projects · most recent 07/28/2026
Steel Concrete
FiledStatusContractorScope
07/28/2026——Steel
02/04/2026Permit IssuedRINNOVO CONSTRUCTION, LLCSteel, Concrete
04/09/2024Permit IssuedRINNOVO CONSTRUCTION, LLCSteel
11/01/2022Permit IssuedFOLOR INC1 scope_items
1 project · most recent 04/13/2023
Sidewalk Shed
FiledStatusContractorScope
04/13/2023Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
1 project · most recent 06/23/2026
FiledStatusContractorScope
06/23/2026Signed-offSATO CONSTRUCTION CO. INC—
▾Field Inspections (DOB CAP) — 104
DateTypeResultReport
01/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/09/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/03/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/06/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/10/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/26/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/22/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/10/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 104.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/02/2026HVAC-R and service water piping design and insulationVladimir Kaushanskyenergy_progress
07/02/2026Maintenance informationVladimir Kaushanskyenergy_progress
07/02/2026Shutoff dampersVladimir Kaushanskyenergy_progress
07/02/2026HVAC-R and service water heating equipmentVladimir Kaushanskyenergy_progress
07/02/2026HVAC-R and service water heating system controlsVladimir Kaushanskyenergy_progress
07/02/2026Duct leakage testing, insulation and designVladimir Kaushanskyenergy_progress
06/24/2026Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
06/24/2026Structural Steel - DetailsKui Hespecial
06/24/2026Structural Steel - WeldingKui Hespecial
06/24/2026Mechanical SystemsVladimir Kaushanskyspecial
06/24/2026Structural Stability – Alterations of existing buildingsVladimir Kaushanskyspecial
06/24/2026Interior lighting powerVladimir Kaushanskyenergy_progress
06/24/2026FinalKui Heprogress
06/24/2026FinalVladimir Kaushanskyprogress
06/24/2026Sprinkler SystemsVladimir Kaushanskyspecial
06/24/2026Lighting controlsVladimir Kaushanskyenergy_progress
06/24/2026FinalEgbert Chuprogress
02/10/2026Fire-Resistant Penetrations and JointsSpencer Goroffspecial
02/10/2026FinalSpencer Goroffprogress
01/27/2026Concrete - Cast-In-PlacePhilip Murrayspecial
01/27/2026Sprayed fire-resistant materialsPhilip Murrayspecial
01/27/2026Structural Steel - WeldingPhilip Murrayspecial
01/27/2026Structural Steel - DetailsPhilip Murrayspecial
01/27/2026Structural Steel - High Strength BoltingPhilip Murrayspecial
01/27/2026FinalPhilip Murrayprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Springbone KitchenRestaurant / Food Service—
Project M01422018 Alteration · Approved · 07/27/2026
Cutie Pie BabyOfficeFloors 27, 28
Project M01089309 Alteration · Objections · 08/20/2024
BurlingtonOfficeFloor 11
Project M00900916 Alteration · LOC Issued · 09/27/2023
Flagstar BankOfficeFloors 23–26
Project M00871859 Alteration · LOC Issued · 07/12/2023
Project M00871867 Alteration · LOC Issued · 07/12/2023
Project M00871870 Alteration · LOC Issued · 07/12/2023
Project M00871875 Alteration · LOC Issued · 07/12/2023
Project M00871882 Alteration · LOC Issued · 07/12/2023
Centric BrandsOfficeFloors 29, 30
Project M00797165 Alteration · LOC Issued · 09/14/2022
Town HallOfficeCellar, Floor 1
Project M00744901 Alteration · LOC Issued · 06/09/2022
Signature BankOfficeFloors 15, 22
Project M00721882 Alteration · LOC Issued · 05/10/2022
ClarinsOfficeFloor 30
Project M00668796 Alteration · LOC Issued · 02/07/2022
American Exchange GroupOfficeFloor 18
Project M00612296 Alteration · Approved · 10/25/2021
OnDeckOfficeFloor 23
Project M00298562 Alteration · LOC Issued · 02/28/2020
Project M00298679 Alteration · LOC Issued · 02/28/2020
Project M00298696 Alteration · LOC Issued · 02/28/2020
Made Man BarbershopRetailFloor 1
Project M00099757 Alteration · LOC Issued · 12/06/2018
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 7,829 on file (BIS + DOB NOW)
▸Plans & Drawings189
▸DOB NOWPlans/Sketch155
09/06/2026M00047905-I1Request digital key ↗
09/06/2026M00099757-I1Request digital key ↗
09/04/2026M00480178-I1Request digital key ↗
Showing 3 of 155 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler11
09/05/2026M00195413-I1Request digital key ↗
09/05/2026M00195413-P1Request digital key ↗
09/05/2026M00262866-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems9
09/05/2026M00195383-I1Request digital key ↗
09/05/2026M00262801-I1Request digital key ↗
09/04/2026M00359239-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing8
09/05/2026M00195411-I1Request digital key ↗
09/05/2026M00195411-P1Request digital key ↗
09/05/2026M00262856-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Standpipe2
09/03/2026M00195419-I1Request digital key ↗
09/03/2026M00195419-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00450952-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00297839-I1Request digital key ↗
▸Applications & Permits1,323
▸BISPLAN / WORK APPROVAL APPLICATION748
10/23/2023123798104Open ↗
02/23/2023123798104Open ↗
02/15/2023123798104Open ↗
Showing 3 of 748 on file for this type
▸BISWORK PERMIT APPLICATION572
10/21/2021123734842Open ↗
12/23/2020140987092Open ↗
10/05/2020140945583Open ↗
Showing 3 of 572 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Seals & Professional Certifications2,270
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1,235
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1,235 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST219
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 219 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT198
12/17/2020140987092Open ↗
09/17/2020140945583Open ↗
Showing 2 of 198 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature190
09/05/2026M00195413-I1Open ↗
09/05/2026M00195411-P1Open ↗
09/05/2026M00195411-I1Open ↗
Showing 3 of 190 on file for this type
▸DOB NOWProgress Inspector Seal & Signature155
09/19/2026M01027780-I1Open ↗
09/13/2026M00668803-I1Open ↗
09/13/2026M00668803-I1Open ↗
Showing 3 of 155 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature135
09/28/2026M08041059-I1Open ↗
09/23/2026M01287624-I1Open ↗
09/19/2026M01027780-I1Open ↗
Showing 3 of 135 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM106
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 106 on file for this type
▸BISPC FULL REPORT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
12/17/2020140987092Open ↗
09/17/2020140945583Open ↗
Showing 2 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
12/17/2020140987092Open ↗
09/17/2020140945583Open ↗
Showing 2 of 8 on file for this type
▸BISProfessional and Owner Certification (POC3)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Trade Schedules & Equipment843
▸BISEQUIPMENT USE PERMITS156
02/12/2021123661885Open ↗
02/12/2021123661885Open ↗
02/12/2021123661885Open ↗
Showing 3 of 156 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE156
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 156 on file for this type
▸BISSELF-CERT PLUMBING NOTICE152
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 152 on file for this type
▸BISSCHEDULE B - PLUMBING123
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 123 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT109
02/12/2021123661885Open ↗
02/12/2021123661885Open ↗
02/12/2021123661885Open ↗
Showing 3 of 109 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA105
08/11/2021123321574Open ↗
05/14/2021123873077Open ↗
Showing 2 of 105 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8532
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISSPRINKLER SYSTEMS4
07/22/2021123424678Open ↗
11/25/2020123661876Open ↗
11/24/2020123661876Open ↗
Showing 3 of 4 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTANDPIPE SYSTEMS2
10/30/2024123734842Open ↗
11/24/2020123661894Open ↗
▸BISSPRINKLER-STANDPIPE ELECTRICAL LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos607
▸BISASBESTOS: CERTIFICATION (DEP ACP5)223
12/17/2020140987092Open ↗
09/17/2020140945583Open ↗
Showing 2 of 223 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'197
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 197 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report176
09/05/2026M00195413-I1Open ↗
09/05/2026M00195411-I1Open ↗
09/05/2026M00195411-P1Open ↗
Showing 3 of 176 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance390
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS205
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 205 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS91
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 91 on file for this type
▸BISTECHNICAL REPORT: ENERGY19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸DOB NOWEN2: As Built Energy Analysis18
09/03/2026M00646700-I1Open ↗
09/02/2026M00668796-I1Open ↗
09/02/2026M00668803-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY17
07/16/2021123424669Open ↗
04/30/2021140987092Open ↗
04/08/2021123710886Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)16
06/26/2022123319426Open ↗
07/16/2021123424669Open ↗
04/29/2021140987092Open ↗
Showing 3 of 16 on file for this type
▸BISTR8: Energy Code Progress Inspections11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS6
12/17/2020140987092Open ↗
09/17/2020140945583Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification4
09/04/2026M00298562-I1Open ↗
09/02/2026M00668803-I1Open ↗
Showing 2 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER3
06/26/2022123319426Open ↗
06/26/2022123319426Open ↗
11/17/2020123798104Open ↗
▸Inspections & Test Reports54
▸BISTECHNICAL REPORT: RESPONSIBILITY37
04/30/2021140987092Open ↗
04/27/2021140945583Open ↗
04/23/2021140929743Open ↗
Showing 3 of 37 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
11/25/2020123661876Open ↗
11/24/2020123661894Open ↗
11/17/2020123798104Open ↗
▸Approvals, Objections & Sign-offs566
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST357
06/30/2022123319426Open ↗
12/02/2021123424678Open ↗
08/23/2021123321574Open ↗
Showing 3 of 357 on file for this type
▸BISADMINISTRATIVE OBJECTIONS154
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 154 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION27
05/31/2022123319426Open ↗
05/31/2022123319426Open ↗
Showing 2 of 27 on file for this type
▸BISSUPERSEDING LETTER10
10/21/2021123734842Open ↗
Showing 1 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
10/23/2023123798104Open ↗
02/15/2023123798104Open ↗
02/14/2023123798104Open ↗
Showing 3 of 9 on file for this type
▸BISFINAL7
10/30/2024123734842Open ↗
06/26/2022123319426Open ↗
12/01/2021123424678Open ↗
Showing 3 of 7 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership888
▸BISCOST AFFIDAVIT872
07/16/2021123424669Open ↗
07/16/2021123424669Open ↗
05/21/2021123873077Open ↗
Showing 3 of 872 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW316
06/26/2022123319426Open ↗
06/26/2022123319426Open ↗
12/01/2021123424678Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms641
▸BISEFILING COVER SHEET356
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 356 on file for this type
▸BISADDITIONAL INFORMATION138
03/16/2023123798104Open ↗
06/02/2021123798104Open ↗
11/30/2020123734842Open ↗
Showing 3 of 138 on file for this type
▸BISBOROUGH INTAKE FORM132
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 132 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET15
12/17/2020140987092Open ↗
09/17/2020140945583Open ↗
Showing 2 of 15 on file for this type
▸Other Documents29
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION19
02/22/2021123798104Open ↗
02/22/2021123798104Open ↗
Showing 2 of 19 on file for this type
▸BISSupporting Document: Fee Exempt8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWStructural Peer Review Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type