ECB08/10/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR 39106472R., FILE A CERTIFICATE OF CORRECTION$1K due
DOB08/10/2026ENGINEERING REPORT REQUEST WITHIN 30 DAYS OF INSPECTION, FOR BALUSTER AND OUT OF PLUMB BRICK FENCE WITH MISSING BRICKS AND LEANING TOWARDS SIDEWALK UNTO THE PUBLIC AT EXPOSURE 4. SUBMIT REPORT TO EXECUTIVEINSPECTIONS@BUILDINGS.NYC.GOV.
ECB03/30/2025AT TIME OF INSPECTION OBSERVED 2 WORKERS WORKING AT ROOF LEVEL WITHOUT REQUIRED HARNESS AND LIFELINE., REPAIR AND/REPLACE$12K due
ECB02/21/2024RCA NOT CORRECTED, ECB VIOLATION ISSUED FOR FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: AT THE TIME OF INSPECTION OF A 1-STORY BUILDING, OBSERVED AT EXPOSURE #1 HUGE HORIZONTAL CRACK APPROX. 10' IN B$3K due
DOB02/21/2024REQUEST ENGINEERING REPORT DUE BALUSTERS ERECTED AT EXPOSURE 3 BALCONY AND OUT OF PLUMB BRICK FENCE WITH MISSING BRICKS AND LEANING TOWARDS SIDEWALK AT EXPOSURE 4.
ECB02/21/2024RCA NOT CORRECTED, ECB VIOLATION ISSUED FOR FENCE EXCEEDING PERMITTED HEIGHT: AT THE TIME OF INSPECTION OF A 1-STORY BUILDING, OBSERVED AT EXPOSURE AT EXPO. #4 BRICK FENCE IN HEIGHT OF APPROX. 8'8" EXCEEDING PE$500 due
ECB08/09/2004WORK WITHOUT A PERMIT: WORK NOTED: BLOCK MASONRY WALL INSTALLED OVER 6' WITH WROUGHT IRON POSTED 4 BRICK WORK AROUND PERIMETER OF HOUSE WALLAS FENCE AREA. REMEDY: OBTAIN (A) PERMIT IF FEASIBLE (OR) RESTORE TONothing owed — awaiting certificate of correction