| Owner | Filings | Most Recent |
|---|---|---|
| URBAN PATHWAYS | 103 | 08/28/2026 |
| ELITE INTERIOR CONTRACTING | 3 | 07/08/2026 |
| HPD | 3 | 03/22/2026 |
| CROTONA 1405 BOSTON ROAD HOUSING DEVELOP MENT FUND | 1 | 03/22/2026 |
| RESTORATION CORP PENTA | 1 | 03/22/2026 |
| LAKHI GENERAL CONTRACTORS | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| EMTG CONSULTANTS INC | 10 | 08/26/2026 |
| MONICA LOPEZ ARCHITECT, LLC | 4 | 12/11/2025 |
| FL&M ENGINEERING DESIGN &INSPECTION | 9 | 03/20/2025 |
| LOMBARDO PROFESSIONAL ENGINEERING | 2 | 03/07/2025 |
| NY BUILDING ASSOCIATES INC | 1 | 10/31/2024 |
| CITYSCAPE ENGINEERING, PLLC | 4 | 07/01/2024 |
| HANSEN ENGINEERING, PC | 1 | 06/07/2024 |
| SOUTH BAY ENGINEERING PLLC | 5 | 03/19/2024 |
| MICHAEL WEIN,PE | 1 | 07/01/2022 |
| HIRANI ENGR. & LAND SURVEYING P.C. | 1 | 08/06/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| CORE CONSULTANTS NYC | 18 | 03/21/2026 |
| EXPEDITE DEM | 8 | 03/21/2026 |
| GEIGER E A GROUP | 8 | 03/21/2026 |
| THE GREEN STUDIO | 5 | 03/21/2026 |
| HIRANI ENG LAND SURVEYING | 2 | 03/21/2026 |
| S R SOLAR DESIGN | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 1 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 2 | 03/21/2026 |
| GEORGE E. BERGER & ASS. LLC | 2 | 03/21/2026 |
| MILLENNIUM DESIGNS | 5 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PENTA RESTORATION CORP | General Contractor | 13 | 07/08/2026 |
| ELITE INTERIOR CONTRACTIN | General Contractor | 10 | 07/08/2026 |
| MC SUPERSTRUCTURE INC | General Contractor | 6 | 07/08/2026 |
| DDS MECHANICAL FPS CORP | Fire Protection | 4 | 07/08/2026 |
| D.D.S. MECH PBG&HTG CORP | Plumbing | 3 | 07/08/2026 |
| GRANITE ENVIRONMENT, LLC | General Contractor | 3 | 03/21/2026 |
| WCD SERVICES CORP | General Contractor | 3 | 03/21/2026 |
| SUPERIOR HVAC INC | General Contractor | 2 | 07/08/2026 |
| WCDNY INC | General Contractor | 2 | 03/21/2026 |
| STATEWIDE DEMOLITION CORP. | General Contractor | 1 | 07/08/2026 |
| ALLTYPE FIRE PROTECT LLC | Fire Protection | 1 | 07/08/2026 |
| 770 ELECTRIC CORP | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AMERICAN CONSTRUCTION TES | 9731 | 6 | 08/26/2026 |
| VIBRANALYSIS INC., DBA VT | 6864 | 12 | 12/11/2025 |
| NKM ENGINEERING PLLC | 6244 | 1 | 10/31/2024 |
| CRUICKSHANKS ENGINEERING | 6370 | 2 | 02/28/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | PENTA RESTORATION CORP | 05/11/2026 |
| DOB NOW | Sprinklers | Signed-off | ALLTYPE FIRE PROTECT LLC | 10/03/2025 |
| DOB NOW | Plumbing | Signed-off | D.D.S. MECH PBG&HTG CORP | 09/05/2025 |
| DOB NOW | Solar | Signed-off | 770 ELECTRIC CORP | 09/05/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | MC SUPERSTRUCTURE INC | 07/14/2025 |
| DOB NOW | Construction Fence | Signed-off | PENTA RESTORATION CORP | 06/04/2025 |
| DOB NOW | Standpipe | Signed-off | DDS MECHANICAL FPS CORP | 05/09/2025 |
| DOB NOW | Plumbing | Signed-off | D.D.S. MECH PBG&HTG CORP | 05/09/2025 |
| DOB NOW | Standpipe | Signed-off | DDS MECHANICAL FPS CORP | 05/09/2025 |
| DOB NOW | Earth Work | Signed-off | PENTA RESTORATION CORP | 05/08/2025 |
| DOB NOW | Support of Excavation | Signed-off | PENTA RESTORATION CORP | 05/08/2025 |
| DOB NOW | General Construction | Permit Issued | PENTA RESTORATION CORP | 05/08/2025 |
| DOB NOW | Structural | Signed-off | PENTA RESTORATION CORP | 05/08/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SUPERIOR HVAC INC | 05/02/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | MC SUPERSTRUCTURE INC | 02/03/2025 |
| DOB NOW | Supported Scaffold | Signed-off | MC SUPERSTRUCTURE INC | 11/12/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | MC SUPERSTRUCTURE INC | 08/12/2024 |
| DOB NOW | Construction Fence | Signed-off | PENTA RESTORATION CORP | 06/07/2024 |
| DOB NOW | Mechanical Systems | Signed-off | SUPERIOR HVAC INC | 05/31/2024 |
| DOB NOW | Structural | Signed-off | PENTA RESTORATION CORP | 05/15/2024 |
| DOB NOW | Sprinklers | Signed-off | DDS MECHANICAL FPS CORP | 05/15/2024 |
| DOB NOW | Support of Excavation | Signed-off | PENTA RESTORATION CORP | 05/15/2024 |
| DOB NOW | General Construction | Permit Issued | PENTA RESTORATION CORP | 05/15/2024 |
| DOB NOW | Plumbing | Signed-off | D.D.S. MECH PBG&HTG CORP | 05/15/2024 |
| DOB NOW | Earth Work | Signed-off | PENTA RESTORATION CORP | 05/14/2024 |
| DOB NOW | Standpipe | Signed-off | DDS MECHANICAL FPS CORP | 05/14/2024 |
| DOB NOW | Full Demolition | Signed-off | ELITE INTERIOR CONTRACTIN | 03/07/2024 |
| DOB NOW | Full Demolition | Signed-off | ELITE INTERIOR CONTRACTIN | 02/26/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ELITE INTERIOR CONTRACTIN | 02/23/2024 |
| DOB NOW | Construction Fence | Signed-off | ELITE INTERIOR CONTRACTIN | 01/23/2024 |
| DOB NOW | Construction Fence | Signed-off | WCDNY INC | 10/19/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | MC SUPERSTRUCTURE INC | 09/08/2023 |
| DOB NOW | Construction Fence | Signed-off | WCD SERVICES CORP | 07/17/2023 |
| DOB NOW | Construction Fence | Signed-off | STATEWIDE DEMOLITION CORP. | 07/15/2023 |
| DOB NOW | Construction Fence | Signed-off | GRANITE ENVIRONMENT, LLC | 08/06/2018 |
| BIS | EQ | ISSUED | LAKHI GENERAL CONTRACTOR | 08/28/2017 |
| BIS | PL | ISSUED | PRECISION PLBG SVCS., INC | 11/10/2016 |
| BIS | MH | ISSUED | BUILDERS-R-US CONSTRUCTION | 01/06/2011 |
| BIS | PL | ISSUED | SCHUMACHER & FARLEY P&H C | 07/20/2010 |
| BIS | OT | ISSUED | BUILDERS-R-US CONSTRUCTION | 04/06/2009 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/26/2026 | Permit Issued | PENTA RESTORATION CORP | Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Heat / Cool — TPKFYP006LM140B 6,000 BTU · Vrf Indoor ×45 TPKFYP008LM140B 8,000 BTU · Vrf Indoor ×24 TPKFYP004LM140B 4,000 BTU · Vrf Indoor ×8 PKA-A24KA8 24,000 BTU · Vrf Indoor ×5 TUHYE0723AN41AN 72,000 BTU · Vrf Outdoor ×5 PUZ-HA24NHA1 24,000 BTU · Vrf Outdoor ×4 TPKFUYP012LM140B 12,000 BTU · Vrf Indoor ×2 TUHYE0963AN41AN 96,000 BTU · Vrf Outdoor ×2 MXZ-SM36NAM2-U1 36,000 BTU · Vrf Outdoor ×1 MXZ-SM60NAM2 60,000 BTU · Vrf Outdoor ×1 PUZ-A24NHA7 24,000 BTU · Vrf Outdoor ×1 TPEFYP036MA144A 36,000 BTU · Vrf Indoor ×1 Mitsubishi Electric TUHYE0723AN41AN 72,000 BTU · Condensing Unit ×10 PUZ-HA24NHA1 72,000 BTU · Condensing Unit ×8 TUHYE0963AN41AN 96,000 BTU · Vrf Outdoor ×4 MXZ-SM36NAM2-U1 36,000 BTU · Split System ×2 MXZ-SM60NAM2 60,000 BTU · Split System ×2 TPKFYP006LM140B 10,000 BTU · Vrf Indoor ×2 Ventilation __Junk__ VENTILTATION SYSTEMS ×2 Mitsubishi Electric ACCU-S PUZ-HA24NHA1 72,000 BTU · Condensing Unit ×1 Cooling Mitsubishi Electric ACCU-1 PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×1 ACCU-2 PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×1 ACCU-3 PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×1 ACCU-4 PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×1 ACCU-5 PUHY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×1 ACCU-6 PUHY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×1 ACCU-O MXZ-SM36NAM-U1 72,000 BTU · Condensing Unit ×1 ACCU-T PUZ-HA24NHA1 72,000 BTU · Condensing Unit ×1 MITSUBISHI HAVC Unit 72,000 BTU ×1 PUZ-HA24NHA1 72,000 BTU · Heat Pump Outdoor ×1 Heating Mitsubishi Electric ACCU-C PUZ-HA30NKA 72,000 BTU · Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Signed-off | DDS MECHANICAL FPS CORP | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Signed-off | D.D.S. MECH PBG&HTG CORP | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/22/2026 | Complete | RGF ELECTRIC CORP | General Wiring |
| 01/08/2026 | Complete | TUXEDO ELEC'L CONTR'G INC | — |
| 08/12/2024 | Complete | GRID CITY ELECTRIC, CORP | 1 meters, 1 new_meters |
| 04/09/2024 | Complete | RGF ELECTRIC CORP | 1 meters, 1 new_meters |
| 01/17/2024 | Complete | NASH ELECTRIC SERVICES IN | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Permit Issued | PENTA RESTORATION CORP | Steel, Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/19/2024 | Signed-off | ELITE INTERIOR CONTRACTIN | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Permit Issued | PENTA RESTORATION CORP | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/27/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/29/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 04/13/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 03/16/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/03/2026 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 02/03/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/19/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 10/16/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/16/2025 | Certified Sprinkler (SP) - Booster Pump Test | Certified | View ↗ |
| 09/29/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/29/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 09/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/24/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 08/26/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 08/07/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 08/07/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/24/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/06/2026 | Metering | EDWIN HOPKINS | energy_progress |
| 04/06/2026 | Maintenance information | EDWIN HOPKINS | energy_progress |
| 04/06/2026 | Shutoff dampers | EDWIN HOPKINS | energy_progress |
| 04/06/2026 | Final | EDWIN HOPKINS | progress |
| 04/06/2026 | Mechanical Systems | EDWIN HOPKINS | special |
| 04/06/2026 | Lighting controls | EDWIN HOPKINS | energy_progress |
| 04/06/2026 | Interior lighting power | EDWIN HOPKINS | energy_progress |
| 04/06/2026 | Lighting in dwelling units | EDWIN HOPKINS | energy_progress |
| 04/06/2026 | Electrical motors and elevators | EDWIN HOPKINS | energy_progress |
| 04/06/2026 | HVAC-R and service water heating equipment | EDWIN HOPKINS | energy_progress |
| 04/06/2026 | Exterior lighting power | EDWIN HOPKINS | energy_progress |
| 04/06/2026 | HVAC-R and service water piping design and insulation | EDWIN HOPKINS | energy_progress |
| 04/06/2026 | HVAC-R and service water heating system controls | EDWIN HOPKINS | energy_progress |
| 01/21/2026 | HVAC-R and service water heating system controls | EDWIN HOPKINS | energy_progress |
| 01/21/2026 | Exterior lighting power | EDWIN HOPKINS | energy_progress |
| 01/21/2026 | Fenestration air leakage | EDWIN HOPKINS | energy_progress |
| 01/21/2026 | Electrical motors and elevators | EDWIN HOPKINS | energy_progress |
| 01/21/2026 | HVAC-R and service water heating equipment | EDWIN HOPKINS | energy_progress |
| 01/21/2026 | Maintenance information | EDWIN HOPKINS | energy_progress |
| 01/21/2026 | Protection of exposed foundation insulation | EDWIN HOPKINS | energy_progress |
| 01/21/2026 | Air barrier - visual inspection | EDWIN HOPKINS | energy_progress |
| 01/21/2026 | Fenestration and door U-factor and product ratings | EDWIN HOPKINS | energy_progress |
| 01/21/2026 | Insulation placement and R values | EDWIN HOPKINS | energy_progress |
| 01/21/2026 | Air barrier continuity plan testing | EDWIN HOPKINS | energy_progress |
| 01/21/2026 | Fenestration areas | EDWIN HOPKINS | energy_progress |