Elevator apt, semi-fireproof with stores
1405 BOSTON ROAD
BRONX · BIN 2130985
💬 Discuss this project
0Year Built
7Stories
D7Building Class
R6Zoning
47,686 sfGross Floor Area
80Units
0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: CROTONA 1405 BOSTON ROAD HOUSING DEVELOP MENT FUND · 11,198 sf lot · 4.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof8p · 4 filings · 20 docs
Floor 336p · 1 filing · 20 docs
Floor 240p · 3 filings · 20 docs
Floor 141p · 3 filings · 20 docs
Basement1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URBAN PATHWAYS10308/28/2026
ELITE INTERIOR CONTRACTING307/08/2026
HPD303/22/2026
CROTONA 1405 BOSTON ROAD HOUSING DEVELOP MENT FUND103/22/2026
RESTORATION CORP PENTA103/22/2026
LAKHI GENERAL CONTRACTORS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CORE CONSULTANTS NYC1803/21/2026
EXPEDITE DEM803/21/2026
GEIGER E A GROUP803/21/2026
THE GREEN STUDIO503/21/2026
HIRANI ENG LAND SURVEYING203/21/2026
S R SOLAR DESIGN203/21/2026
A1 EXPEDITING SERVICE CORP.103/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
GEORGE E. BERGER & ASS. LLC203/21/2026
MILLENNIUM DESIGNS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PENTA RESTORATION CORPGeneral Contractor1307/08/2026
ELITE INTERIOR CONTRACTINGeneral Contractor1007/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor607/08/2026
DDS MECHANICAL FPS CORPFire Protection407/08/2026
D.D.S. MECH PBG&HTG CORPPlumbing307/08/2026
GRANITE ENVIRONMENT, LLCGeneral Contractor303/21/2026
WCD SERVICES CORPGeneral Contractor303/21/2026
SUPERIOR HVAC INCGeneral Contractor207/08/2026
WCDNY INCGeneral Contractor203/21/2026
STATEWIDE DEMOLITION CORP.General Contractor107/08/2026
ALLTYPE FIRE PROTECT LLCFire Protection107/08/2026
770 ELECTRIC CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERICAN CONSTRUCTION TES9731608/26/2026
VIBRANALYSIS INC., DBA VT68641212/11/2025
NKM ENGINEERING PLLC6244110/31/2024
CRUICKSHANKS ENGINEERING6370202/28/2024
Building Lifecycle
All (231)Filed (37)Permit Issued (35)Signed Off (14)Violation (18)Inspection (17)Objection (80)Special Inspection (30)
08/26/2026
Filed — New Building
Plumbing in Conjunction with New Buildings job Number #X00727101-I1
X00727101-A7
07/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/28/2026
Signed off — New Building
Plumbing in Conjunction with New Buildings job Number #X00727101-I1
X00727101-S5
05/11/2026
Permit issued — General Construction
X00727101-I1-GC
04/29/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/15/2026
Signed off — New Building
Plumbing in Conjunction with New Buildings job Number #X00727101-I1
X00727101-S7
04/13/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/06/2026
Special inspection requirement — Lighting controls
EDWIN HOPKINS
04/06/2026
Special inspection requirement — Maintenance information
EDWIN HOPKINS
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN HOPKINS
04/06/2026
Special inspection requirement — Mechanical Systems
EDWIN HOPKINS
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
04/06/2026
Special inspection requirement — Shutoff dampers
EDWIN HOPKINS
04/06/2026
Special inspection requirement — Metering
EDWIN HOPKINS
04/06/2026
Special inspection requirement — Exterior lighting power
EDWIN HOPKINS
04/06/2026
Special inspection requirement — Interior lighting power
EDWIN HOPKINS
04/06/2026
Special inspection requirement — Final
EDWIN HOPKINS
04/06/2026
Special inspection requirement — Lighting in dwelling units
EDWIN HOPKINS
04/06/2026
Special inspection requirement — Electrical motors and elevators
EDWIN HOPKINS
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
03/26/2026
Signed off — Alteration
X00054627-I1
03/26/2026
Signed off — New Building
Plumbing in Conjunction with New Buildings job Number #X00727101-I1
X00727101-S6
03/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/03/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/09/2026
Violation issued (FDNY_ORDER, closed)
02/09/2026
Violation issued (FDNY_ORDER, closed)
02/03/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01131996-I1
02/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/21/2026
Special inspection requirement — Exterior lighting power
EDWIN HOPKINS
01/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWIN HOPKINS
01/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Air barrier continuity plan testing
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Duct leakage testing, insulation and design
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Insulation placement and R values
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Fenestration areas
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Metering
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Lighting controls
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Air barrier - visual inspection
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Vestibules
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Interior lighting power
EDWIN HOPKINS
01/21/2026
Special inspection requirement — Protection of exposed foundation insulation
EDWIN HOPKINS
12/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/17/2025
Signed off — Alteration
SPRINKLER REMOVAL OF 2 STORY BRICK & WOOD FRAMEBUILDING LOCATED AT 695 EAST 170th STREET IN THE BRONX N.Y
X01007365-I1
12/16/2025
Signed off — Alteration
X01059702-I1
12/11/2025
Filed — New Building
Plumbing in Conjunction with New Buildings job Number #X00727101-I1
X00727101-A5
11/19/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, WINDOW, ROOF PROTECTION AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. "DOB SHED LEGS ON ROADWAY"
X00929687-I1
11/18/2025
Filed — New Building
Plumbing in Conjunction with New Buildings job Number #X00727101-I1
X00727101-A3
11/07/2025
Objection resolved — Addressed
11/06/2025
Objection resolved — Addressed
11/05/2025
Objection raised — Other
10/27/2025
Objection raised — Other
10/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/16/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
10/14/2025
Filed — New Building
Plumbing in Conjunction with New Buildings job Number #X00727101-I1
X00727101-A2
10/06/2025
Signed off — Alteration
X01121705-I1
10/06/2025
Signed off — Alteration
Application for the Installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
X01172151-I1
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPENTA RESTORATION CORP05/11/2026
DOB NOWSprinklersSigned-offALLTYPE FIRE PROTECT LLC10/03/2025
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP09/05/2025
DOB NOWSolarSigned-off770 ELECTRIC CORP09/05/2025
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC07/14/2025
DOB NOWConstruction FenceSigned-offPENTA RESTORATION CORP06/04/2025
DOB NOWStandpipeSigned-offDDS MECHANICAL FPS CORP05/09/2025
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP05/09/2025
DOB NOWStandpipeSigned-offDDS MECHANICAL FPS CORP05/09/2025
DOB NOWEarth WorkSigned-offPENTA RESTORATION CORP05/08/2025
DOB NOWSupport of ExcavationSigned-offPENTA RESTORATION CORP05/08/2025
DOB NOWGeneral ConstructionPermit IssuedPENTA RESTORATION CORP05/08/2025
DOB NOWStructuralSigned-offPENTA RESTORATION CORP05/08/2025
DOB NOWMechanical SystemsSigned-offSUPERIOR HVAC INC05/02/2025
DOB NOWSuspended ScaffoldSigned-offMC SUPERSTRUCTURE INC02/03/2025
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC11/12/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC08/12/2024
DOB NOWConstruction FenceSigned-offPENTA RESTORATION CORP06/07/2024
DOB NOWMechanical SystemsSigned-offSUPERIOR HVAC INC05/31/2024
DOB NOWStructuralSigned-offPENTA RESTORATION CORP05/15/2024
DOB NOWSprinklersSigned-offDDS MECHANICAL FPS CORP05/15/2024
DOB NOWSupport of ExcavationSigned-offPENTA RESTORATION CORP05/15/2024
DOB NOWGeneral ConstructionPermit IssuedPENTA RESTORATION CORP05/15/2024
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP05/15/2024
DOB NOWEarth WorkSigned-offPENTA RESTORATION CORP05/14/2024
DOB NOWStandpipeSigned-offDDS MECHANICAL FPS CORP05/14/2024
DOB NOWFull DemolitionSigned-offELITE INTERIOR CONTRACTIN03/07/2024
DOB NOWFull DemolitionSigned-offELITE INTERIOR CONTRACTIN02/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offELITE INTERIOR CONTRACTIN02/23/2024
DOB NOWConstruction FenceSigned-offELITE INTERIOR CONTRACTIN01/23/2024
DOB NOWConstruction FenceSigned-offWCDNY INC10/19/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC09/08/2023
DOB NOWConstruction FenceSigned-offWCD SERVICES CORP07/17/2023
DOB NOWConstruction FenceSigned-offSTATEWIDE DEMOLITION CORP.07/15/2023
DOB NOWConstruction FenceSigned-offGRANITE ENVIRONMENT, LLC08/06/2018
BISEQISSUEDLAKHI GENERAL CONTRACTOR08/28/2017
BISPLISSUEDPRECISION PLBG SVCS., INC11/10/2016
BISMHISSUEDBUILDERS-R-US CONSTRUCTION01/06/2011
BISPLISSUEDSCHUMACHER & FARLEY P&H C07/20/2010
BISOTISSUEDBUILDERS-R-US CONSTRUCTION04/06/2009
+ 5 more permits on file
1 project · most recent 08/26/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/26/2026Permit IssuedPENTA RESTORATION CORPAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
— TPKFYP006LM140B 6,000 BTU · Vrf Indoor ×45
TPKFYP008LM140B 8,000 BTU · Vrf Indoor ×24
TPKFYP004LM140B 4,000 BTU · Vrf Indoor ×8
PKA-A24KA8 24,000 BTU · Vrf Indoor ×5
TUHYE0723AN41AN 72,000 BTU · Vrf Outdoor ×5
PUZ-HA24NHA1 24,000 BTU · Vrf Outdoor ×4
TPKFUYP012LM140B 12,000 BTU · Vrf Indoor ×2
TUHYE0963AN41AN 96,000 BTU · Vrf Outdoor ×2
MXZ-SM36NAM2-U1 36,000 BTU · Vrf Outdoor ×1
MXZ-SM60NAM2 60,000 BTU · Vrf Outdoor ×1
PUZ-A24NHA7 24,000 BTU · Vrf Outdoor ×1
TPEFYP036MA144A 36,000 BTU · Vrf Indoor ×1
Mitsubishi Electric TUHYE0723AN41AN 72,000 BTU · Condensing Unit ×10
PUZ-HA24NHA1 72,000 BTU · Condensing Unit ×8
TUHYE0963AN41AN 96,000 BTU · Vrf Outdoor ×4
MXZ-SM36NAM2-U1 36,000 BTU · Split System ×2
MXZ-SM60NAM2 60,000 BTU · Split System ×2
TPKFYP006LM140B 10,000 BTU · Vrf Indoor ×2
Ventilation
__Junk__ VENTILTATION SYSTEMS ×2
Mitsubishi Electric ACCU-S PUZ-HA24NHA1 72,000 BTU · Condensing Unit ×1
Cooling
Mitsubishi Electric ACCU-1 PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×1
ACCU-2 PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×1
ACCU-3 PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×1
ACCU-4 PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×1
ACCU-5 PUHY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×1
ACCU-6 PUHY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×1
ACCU-O MXZ-SM36NAM-U1 72,000 BTU · Condensing Unit ×1
ACCU-T PUZ-HA24NHA1 72,000 BTU · Condensing Unit ×1
MITSUBISHI HAVC Unit 72,000 BTU ×1
PUZ-HA24NHA1 72,000 BTU · Heat Pump Outdoor ×1
Heating
Mitsubishi Electric ACCU-C PUZ-HA30NKA 72,000 BTU · Condensing Unit ×1
1 project · most recent 08/26/2026
Sprinkler System
FiledStatusContractorScope
08/26/2026Signed-offDDS MECHANICAL FPS CORPSprinkler System
1 project · most recent 08/26/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/26/2026Signed-offD.D.S. MECH PBG&HTG CORPGas, Storm, Water/Sanitary
5 projects · most recent 06/22/2026
General Wiring
FiledStatusContractorScope
06/22/2026CompleteRGF ELECTRIC CORPGeneral Wiring
01/08/2026CompleteTUXEDO ELEC'L CONTR'G INC—
08/12/2024CompleteGRID CITY ELECTRIC, CORP1 meters, 1 new_meters
04/09/2024CompleteRGF ELECTRIC CORP1 meters, 1 new_meters
01/17/2024CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 08/26/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/26/2026Permit IssuedPENTA RESTORATION CORPSteel, Concrete, Masonry
1 project · most recent 03/19/2024
Fence
FiledStatusContractorScope
03/19/2024Signed-offELITE INTERIOR CONTRACTINFence
1 project · most recent 08/26/2026
Earthwork
FiledStatusContractorScope
08/26/2026Permit IssuedPENTA RESTORATION CORPEarthwork
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
07/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/29/2026Fail-Final CND-Occupancy InspectionFailView ↗
04/13/2026Fail-Final CND-Occupancy InspectionFailView ↗
03/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/03/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/16/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
09/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/29/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/24/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/26/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/07/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/07/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/24/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/06/2026MeteringEDWIN HOPKINSenergy_progress
04/06/2026Maintenance informationEDWIN HOPKINSenergy_progress
04/06/2026Shutoff dampersEDWIN HOPKINSenergy_progress
04/06/2026FinalEDWIN HOPKINSprogress
04/06/2026Mechanical SystemsEDWIN HOPKINSspecial
04/06/2026Lighting controlsEDWIN HOPKINSenergy_progress
04/06/2026Interior lighting powerEDWIN HOPKINSenergy_progress
04/06/2026Lighting in dwelling unitsEDWIN HOPKINSenergy_progress
04/06/2026Electrical motors and elevatorsEDWIN HOPKINSenergy_progress
04/06/2026HVAC-R and service water heating equipmentEDWIN HOPKINSenergy_progress
04/06/2026Exterior lighting powerEDWIN HOPKINSenergy_progress
04/06/2026HVAC-R and service water piping design and insulationEDWIN HOPKINSenergy_progress
04/06/2026HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
01/21/2026HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
01/21/2026Exterior lighting powerEDWIN HOPKINSenergy_progress
01/21/2026Fenestration air leakageEDWIN HOPKINSenergy_progress
01/21/2026Electrical motors and elevatorsEDWIN HOPKINSenergy_progress
01/21/2026HVAC-R and service water heating equipmentEDWIN HOPKINSenergy_progress
01/21/2026Maintenance informationEDWIN HOPKINSenergy_progress
01/21/2026Protection of exposed foundation insulationEDWIN HOPKINSenergy_progress
01/21/2026Air barrier - visual inspectionEDWIN HOPKINSenergy_progress
01/21/2026Fenestration and door U-factor and product ratingsEDWIN HOPKINSenergy_progress
01/21/2026Insulation placement and R valuesEDWIN HOPKINSenergy_progress
01/21/2026Air barrier continuity plan testingEDWIN HOPKINSenergy_progress
01/21/2026Fenestration areasEDWIN HOPKINSenergy_progress
Latest 25 of 150.
▾Documents — 238 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch38
08/26/2026X00054627-I1Request digital key ↗
08/22/2026X00929687-P4Request digital key ↗
08/22/2026X00929687-P3Request digital key ↗
Showing 3 of 38 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION8
01/26/2026220554656Open ↗
11/05/2025201105053Open ↗
11/03/2025201105053Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION3
08/30/2017220594916Open ↗
11/21/2016220557163Open ↗
04/14/2008210039260Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
11/05/2025240332528Open ↗
09/27/2022240332528Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/21/2026X00727101-I1Open ↗
08/21/2026X00727101-P5Open ↗
08/21/2026X00727101-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/21/2026X00727101-I1Open ↗
08/21/2026X00727101-P8Open ↗
08/21/2026X00727101-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/21/2026X00727101-I1Open ↗
▸Seals & Professional Certifications95
▸DOB NOWDPL-1: Design Professional Seal & Signature38
08/22/2026X00929687-P3Open ↗
08/22/2026X00929687-P2Open ↗
08/22/2026X00929687-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/27/2026X00894831-I1Open ↗
09/27/2026X00894831-I1Open ↗
09/02/2026X00727101-A3Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/01/2026X00727101-P4Open ↗
08/28/2026X00727101-S1Open ↗
08/28/2026X00727101-I1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/29/2017220594916Open ↗
10/25/2016220557163Open ↗
10/12/2016220554656Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/29/2017220594916Open ↗
10/25/2016220557163Open ↗
10/12/2016220554656Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/25/2016220557163Open ↗
10/12/2016220554656Open ↗
04/14/2008210039260Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/25/2022240332528Open ↗
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/21/2026X00727101-P8Open ↗
08/21/2026X00727101-P5Open ↗
08/21/2026X00727101-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
04/01/2008210039260Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/12/2016220554656Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/25/2016220557163Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X00894831-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X00894831-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026X00894831-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X00894831-I1Open ↗
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist4
08/21/2026X00727101-I1Open ↗
08/21/2026X00727101-P8Open ↗
08/21/2026X00727101-P5Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes3
08/29/2017220594916Open ↗
10/25/2016220557163Open ↗
10/12/2016220554656Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/16/2022240332528Open ↗
▸BISSTREET TREE CHECKLIST1
07/25/2022240332528Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
10/26/2016220557163Open ↗
▸DOB NOWStreet Tree Sign Off1
08/21/2026X00727101-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/21/2026X00727101-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/21/2026X00727101-I1Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/26/2016220557163Open ↗
10/12/2016220554656Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026X01007365-I1Open ↗
08/13/2026X00894831-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/01/2008210039260Open ↗
▸DOB NOWRodent Control1
08/13/2026X00894831-I1Open ↗
▸Energy Compliance6
▸DOB NOWPreliminary Commissioning Report Certification3
08/21/2026X00727101-S7Open ↗
08/21/2026X00727101-S5Open ↗
08/21/2026X00727101-S4Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/25/2016220557163Open ↗
10/12/2016220554656Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/21/2026X00727101-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/21/2026X00727101-P4Open ↗
08/14/2026X00727101-S2Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
10/28/2025220594916Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026X00727101-S2Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/22/2026X00929687-P4Open ↗
08/22/2026X00929687-P3Open ↗
08/22/2026X00929687-P2Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
03/27/2008210039260Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/10/2022240332528Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/31/2025220594916Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01131996-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/25/2016220557163Open ↗
10/12/2016220554656Open ↗
04/14/2008210039260Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
08/29/2017220594916Open ↗
10/25/2016220557163Open ↗
10/12/2016220554656Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/25/2022240332528Open ↗
▸BISADDITIONAL INFORMATION1
09/16/2022240332528Open ↗
▸Other Documents25
▸DOB NOWProperty Ownership Certification5
08/21/2026X00727101-P5Open ↗
08/21/2026X00727101-P8Open ↗
08/21/2026X00727101-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/21/2026X00727101-P8Open ↗
08/21/2026X00727101-I1Open ↗
08/21/2026X00727101-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/21/2026X00727101-I1Open ↗
08/21/2026X00727101-P5Open ↗
08/21/2026X00727101-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026X01172151-P1Open ↗
08/13/2026X01172151-I1Open ↗
▸DOB NOWCalculations2
08/13/2026X01172151-P1Open ↗
08/13/2026X01172151-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/15/2026X00727101-S3Open ↗
08/14/2026X00727101-S2Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/05/2025240332528Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X00894831-I1Open ↗
▸DOB NOWFinal Survey1
08/21/2026X00727101-I1Open ↗
▸DOB NOWDOF Certification of Binding Agreement1
08/13/2026X00894831-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X00894831-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X00894831-I1Open ↗