← Back
Primarily 4 family with 1 store or office
1406 WHITE PLAINS ROAD
BRONX · BIN 2029060
💬 Discuss this project
1920Year Built
3Stories
S4Building Class
R6Zoning
4,150 sfGross Floor Area
5Units
32 Open Violations 30 unresolved · 2 paperwork only ▸
Primarily 4 family with 1 store or office · 2,030 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 2
Floor 14p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLOMBO ARCHITECTURAL STUDIO PC905/05/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST CONTRACTING CORPGeneral Contractor707/08/2026
EXCEL CONSTRUCTION ENTERPGeneral Contractor303/21/2026
DOVAL PLBG & HTG CORPPlumbing207/08/2026
EVANS, DWAYNEElectrical103/21/2026
HERNANDEZ, LElectrical103/21/2026
M&L SIGNS INCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COLOMBO ARCHITECTURAL STU4930603/03/2024
JOSE A SANTOS PE, PC3292103/03/2024
Building Lifecycle
All (107)Filed (9)Permit Issued (6)Signed Off (4)Violation (57)Inspection (5)Objection (2)Special Inspection (24)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/19/2024
Violation issued (HPD, open)
C
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/05/2024
Violation issued (ECB, open)
Boilers
06/18/2024
Signed off — Alteration
As per Boro Commissioner approval, herewith filing for installation of fire escape to provide second means of egress to (2) Class A apts. (2A & 3A) in an existing (4) dwellings plus store building. Apts (2B & 3B) second egress filed under 220673705.
X01013835-I1
05/30/2024
Permit issued — General Construction
X01013835-I1-GC
05/06/2024
Special inspection requirement — Final
Yahaira Volquez Colombo
05/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/05/2024
Filed — Alteration
General construction work as per plans filed herwith. No change in use, egress or occupancy.
X01039670-P1
05/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/05/2024
Special inspection requirement — Final
Yahaira Volquez Colombo
05/02/2024
Filed — Alteration
General construction work as per plans filed herwith. No change in use, egress or occupancy.
X01039670-I1
03/27/2024
Objection resolved — Addressed
03/14/2024
Objection raised — Scope
03/03/2024
Filed — Alteration
As per Boro Commissioner approval, herewith filing for installation of fire escape to provide second means of egress to (2) Class A apts. (2A & 3A) in an existing (4) dwellings plus store building. Apts (2B & 3B) second egress filed under 220673705.
X01013835-I1
03/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jose Santos
03/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
Yahaira Volquez Colombo
03/02/2024
Special inspection requirement — Final
Yahaira Volquez Colombo
09/22/2023
Signed off — Alteration
Installation of split systems HVAC to supply (4) existing dwellings.
X00785387-S2
09/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
Yahaira Volquez Colombo
09/21/2023
Special inspection requirement — Mechanical Systems
Yahaira Volquez Colombo
09/21/2023
Special inspection requirement — Energy Code Compliance Inspections
Yahaira Volquez Colombo
09/21/2023
Special inspection requirement — Final
Yahaira Volquez Colombo
09/21/2023
Special inspection requirement — Maintenance information
Yahaira Volquez Colombo
09/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
Yahaira Volquez Colombo
09/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Yahaira Volquez Colombo
09/20/2023
Filed — Alteration
Installation of split systems HVAC to supply (4) existing dwellings.
X00785387-P3
09/20/2023
Special inspection requirement — Mechanical Systems
Yahaira Volquez Colombo
09/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
Yahaira Volquez Colombo
09/20/2023
Special inspection requirement — Maintenance information
Yahaira Volquez Colombo
09/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Yahaira Volquez Colombo
09/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
Yahaira Volquez Colombo
09/20/2023
Special inspection requirement — Final
Yahaira Volquez Colombo
09/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Yahaira Volquez Colombo
09/18/2023
Permit issued — Mechanical Systems
X00785387-S2-MS
09/04/2023
Filed — Alteration
Installation of split systems HVAC to supply (4) existing dwellings.
X00785387-S2
08/21/2023
Signed off — Alteration
Installation of split systems HVAC to supply (4) existing dwellings.
X00785387-S1
07/05/2023
Signed off — Alteration
Installation of split systems HVAC to supply (4) existing dwellings.
X00785387-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/01/2023
Filed — Alteration
Installation of split systems HVAC to supply (4) existing dwellings.
X00785387-P2
06/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
05/31/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/26/2023
Permit issued — Plumbing
X00785387-I1-PL
05/15/2023
Filed — Alteration
Installation of split systems HVAC to supply (4) existing dwellings.
X00785387-P1
05/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2023
Permit issued — General Construction
X00785387-S1-GC
01/19/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/03/2022
Permit issued — General Construction
X00785387-S1-GC
09/22/2022
Filed — Alteration
Installation of split systems HVAC to supply (4) existing dwellings.
X00785387-S1
09/19/2022
Special inspection requirement — Final
Yahaira Volquez Colombo
09/15/2022
Permit issued — Plumbing
X00785387-I1-PL
08/26/2022
Filed — Alteration
Installation of split systems HVAC to supply (4) existing dwellings.
X00785387-I1
07/02/2021
Violation issued (ECB, closed)
Construction
05/10/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEXCEL CONSTRUCTION ENTERP05/30/2024
DOB NOWMechanical SystemsSigned-offBEST CONTRACTING CORP09/18/2023
DOB NOWPlumbingSigned-offDOVAL PLBG & HTG CORP05/26/2023
DOB NOWGeneral ConstructionSigned-offBEST CONTRACTING CORP01/31/2023
DOB NOWGeneral ConstructionSigned-offBEST CONTRACTING CORP10/03/2022
DOB NOWPlumbingSigned-offDOVAL PLBG & HTG CORP09/15/2022
BISOTISSUEDBEST CONTRACTING CORP08/24/2023
BISPLISSUEDTOP DOG PLBG & HTG CORP04/08/2022
BISOTISSUEDSTELLAR INDUSTRIES INC12/23/2021
BISOTISSUEDSTELLAR INDUSTRIES INC07/21/2021
BISOTISSUEDE-THREE DEMOLITION INC04/14/2010
BISEQISSUEDE-THREE DEMOLITION INC04/14/2010
BISEQISSUEDNATIONWIDE CONTRACTING CO11/16/2009
BISOTISSUEDNATIONWIDE CONTRACTING CO11/16/2009
BISFSISSUEDA & C WELDING06/10/1992
1 project · most recent 09/30/2021
General Wiring
FiledStatusContractorScope
09/30/2021Permit IssuedACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
05/06/2024FinalYahaira Volquez Colomboprogress
05/06/2024Tenant Protection Plan Compliance—special
05/05/2024Tenant Protection Plan Compliance—special
05/05/2024FinalYahaira Volquez Colomboprogress
03/02/2024Structural Stability – Alterations of existing buildingsJose Santosspecial
03/02/2024Tenant Protection Plan ComplianceYahaira Volquez Colombospecial
03/02/2024FinalYahaira Volquez Colomboprogress
09/21/2023HVAC-R and service water heating system controlsYahaira Volquez Colomboenergy_progress
09/21/2023Mechanical SystemsYahaira Volquez Colombospecial
09/21/2023Energy Code Compliance InspectionsYahaira Volquez Colomboprogress
09/21/2023FinalYahaira Volquez Colomboprogress
09/21/2023Maintenance informationYahaira Volquez Colomboenergy_progress
09/21/2023HVAC-R and service water heating equipmentYahaira Volquez Colomboenergy_progress
09/21/2023HVAC-R and service water piping design and insulationYahaira Volquez Colomboenergy_progress
09/20/2023Mechanical SystemsYahaira Volquez Colombospecial
09/20/2023HVAC-R and service water heating equipmentYahaira Volquez Colomboenergy_progress
09/20/2023Maintenance informationYahaira Volquez Colomboenergy_progress
09/20/2023HVAC-R and service water piping design and insulationYahaira Volquez Colomboenergy_progress
09/20/2023HVAC-R and service water heating system controlsYahaira Volquez Colomboenergy_progress
09/20/2023FinalYahaira Volquez Colomboprogress
09/20/2023Energy Code Compliance InspectionsYahaira Volquez Colomboprogress
06/01/2023Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
05/10/2023Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
09/19/2022FinalYahaira Volquez Colomboprogress
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/22/2026X00785387-P2Request digital key ↗
08/22/2026X00785387-P1Request digital key ↗
08/22/2026X00785387-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION14
09/06/2023220673705Open ↗
06/30/2022220673705Open ↗
01/14/2022220637568Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION6
09/19/2023220673705Open ↗
04/08/2022220637568Open ↗
01/03/2022220673705Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026X00785387-S2Open ↗
09/02/2026X00785387-S2Open ↗
09/02/2026X00785387-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/22/2026X00785387-S1Open ↗
08/22/2026X00785387-P2Open ↗
08/22/2026X00785387-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026X00785387-S2Open ↗
09/02/2026X00785387-P2Open ↗
08/27/2026X01013835-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/18/2018220673705Open ↗
02/26/2018220637568Open ↗
11/16/2009220037216Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/26/2018220637568Open ↗
02/11/2011220037216Open ↗
11/16/2009220037216Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/26/2018220637568Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/16/2009220037216Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/26/2018220637568Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/26/2018220637568Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
10/18/2018220673705Open ↗
02/26/2018220637568Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/22/2026X00785387-P2Open ↗
08/22/2026X00785387-S1Open ↗
08/22/2026X00785387-P3Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/28/2018220673705Open ↗
02/26/2018220637568Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/16/2009220037216Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/18/2018220673705Open ↗
02/26/2018220637568Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/10/2023220673705Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/10/2023220673705Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/25/2024220673705Open ↗
09/12/2023220673705Open ↗
12/09/2010220037216Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/10/2010220037216Open ↗
04/14/2010220037216Open ↗
▸BISFINAL2
09/10/2023220673705Open ↗
09/10/2023220673705Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
09/15/2011220134272Open ↗
11/16/2009220037216Open ↗
▸BISSUPERSEDING LETTER1
09/19/2023220673705Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
09/10/2023220673705Open ↗
10/18/2018220673705Open ↗
02/26/2018220637568Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
09/06/2023220673705Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
10/18/2018220673705Open ↗
02/26/2018220637568Open ↗
09/15/2011220134272Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
09/08/2023220673705Open ↗
05/08/2019220673705Open ↗
▸BISBOROUGH INTAKE FORM1
01/03/2022220673705Open ↗