← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
1407 FLATBUSH AVENUE
BROOKLYN · BIN 3428820
💬 Discuss this project
2020Year Built
4Stories
RMBuilding Class
R7AZoning
23,057 sfGross Floor Area
23Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 1407 Flatbush · 6,030 sf lot · 3.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 4Pipe scaffold4p · 1 filing · 3 docs
Floor 3Pipe scaffold4p · 1 filing · 3 docs
Floor 2Pipe scaffold4p · 1 filing · 3 docs
Floor 1Anba Tonel Restaurant4p · 2 filings · 5 docs
MezzanineAnba Tonel Restaurant1 filing · 2 docs
CellarAnba Tonel Restaurant1 filing · 2 docs
Site & exteriorSidewalk shed6p · 2 filings · 6 docs
Filed — no permit issuedAnba Tonel Restaurant6p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1407 Flatbush1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Stateline BuildersGeneral Contractor603/22/2026
Mac FelderPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Brent M. Porter, Architects4140102/03/2022
Building Lifecycle
All (25)Filed (4)Signed Off (2)Violation (17)Objection (2)
04/06/2022
Objection raised — Scope
04/06/2022
Objection resolved — Resolved
04/03/2022
Filed — Alteration CO
CO APPLICATION FILED TO CHANGE THE USE FOR MEZZANINE AND CELLAR FROM STORAGE TO USE GROUP 6 EATING AND DRINKING ESTABLISHMENT, TO PROVIDE SECOND MEANS OF EGRESS. INSTALL AWNING AT ENTRY
B00707673-I1
03/10/2022
Violation issued (HPD, closed)
A
02/03/2022
Filed — Alteration
B00672054-I1
02/26/2021
Signed off — Alteration
B00194028-I1
01/23/2021
Signed off — Alteration
B00194041-I1
01/20/2021
Violation issued (FDNY_ORDER, closed)
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2020
Violation issued (ECB, closed)
Unknown
03/19/2020
Violation issued (ECB, closed)
Construction
03/19/2020
Violation issued (ECB, closed)
Construction
02/27/2020
Violation issued (ECB, closed)
Construction
02/27/2020
Violation issued (ECB, closed)
Construction
02/27/2020
Violation issued (ECB, closed)
Construction
12/26/2019
Violation issued (ECB, closed)
Construction
12/21/2019
Violation issued (ECB, closed)
Construction
12/19/2019
Violation issued (ECB, closed)
Construction
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/16/2019
Filed — Alteration
B00194028-I1
07/16/2019
Filed — Alteration
B00194041-I1
03/07/2017
Violation issued (ECB, closed)
Boilers
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/30/1985
Violation issued (FDNY_ORDER, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDStateline Builders11/30/2020
BISEQISSUEDStateline Builders11/06/2020
BISPLISSUEDAmok06/30/2020
BIS—ISSUEDStateline Builders12/05/2019
BIS—ISSUEDStateline Builders12/05/2019
BISEQISSUEDStateline Builders11/15/2019
BIS—ISSUEDXolle Demo08/02/2019
BIS—ISSUEDXolle Demo08/02/2019
BISFPISSUEDMega Fire Protection05/20/2005
BISFPISSUEDActive Fire Extinguisher Co08/19/1998
BISEQRE-ISSUEDLWJ Collins Remodeling06/17/1993
BISOTISSUEDLWJ Collins Remodeling06/17/1993
2 projects · most recent 12/24/2019
General Wiring
FiledStatusContractorScope
12/24/2019CompleteBLZ ElectricGeneral Wiring
10/03/2019CompleteBLZ Electric—
Nothing on file for this building.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Anba Tonel RestaurantRestaurant / Food ServiceCellar, Floor 1, Mezzanine
Project B00707673 Alteration CO · Objections · 04/03/2022
Project B00672054 Alteration · Approved · 02/03/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch2
08/31/2026B00672054-I1Request digital key ↗
08/15/2026B00707673-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00194028-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00194041-I1Request digital key ↗
▸Applications & Permits36
▸BISPLAN / WORK APPROVAL APPLICATION23
01/05/2022322103638Open ↗
01/03/2022322103638Open ↗
03/19/2021321194104Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION11
07/15/2020321194104Open ↗
06/30/2020321194104Open ↗
03/04/2020321194104Open ↗
Showing 3 of 11 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
07/29/2019321076820Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/09/2020321194104Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM1
01/14/2019321194104Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/31/2017321194104Open ↗
▸BISZONING RESOLUTION DETERMINATION1
10/31/2017321194104Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/31/2017321194104Open ↗
▸BISVERIFY TAX LOT1
06/17/2021321194104Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
01/14/2019321194104Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/04/2021321194104Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00672054-I1Open ↗
08/30/2026B00707673-I1Open ↗
08/13/2026B00194028-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
02/27/2020321194104Open ↗
02/27/2020321194104Open ↗
08/05/2019321194104Open ↗
▸Trade Schedules & Equipment28
▸BISEQUIPMENT USE PERMITS18
04/15/2021321194104Open ↗
04/15/2021321194104Open ↗
04/15/2021321194104Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING4
12/10/2020321194104Open ↗
01/18/2019321194104Open ↗
01/17/2019321194104Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
04/15/2021321194104Open ↗
04/15/2021321194104Open ↗
03/04/2021321194104Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
03/19/2018321194104Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
03/01/2021321194104Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/02/2021321194104Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST2
01/14/2019321194104Open ↗
01/14/2019321194104Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00194028-I1Open ↗
08/13/2026B00194041-I1Open ↗
▸BISSTREET TREE SIGNOFF1
03/04/2021321194104Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
03/04/2020321194104Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/19/2018321194104Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/05/2019321194104Open ↗
▸DOB NOWStreet Tree Checklist1
08/15/2026B00707673-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026B00707673-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/04/2020321194104Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
03/04/2021321194104Open ↗
03/04/2021321194104Open ↗
02/23/2021321194104Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/23/2021321194104Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/05/2019321194104Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY13
03/04/2021321194104Open ↗
03/04/2021321194104Open ↗
03/04/2021321194104Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
03/23/2021321076820Open ↗
03/23/2021321076820Open ↗
08/05/2019321194104Open ↗
▸BISDEP Hydrant Flow Test Letter2
01/14/2019321194104Open ↗
03/19/2018321194104Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
03/23/2021321076820Open ↗
08/05/2019321194104Open ↗
▸BISSOIL REPORT1
01/14/2019321194104Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
01/14/2019321194104Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
02/23/2021321194104Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
02/23/2021321194104Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/12/2019321194104Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE9
03/19/2021321194104Open ↗
02/18/2021321194104Open ↗
03/03/2020321194104Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/04/2020321194104Open ↗
03/04/2020321194104Open ↗
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE2
11/15/2019321194104Open ↗
08/05/2019321194104Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
01/06/2022322103638Open ↗
▸BISCOST AFFIDAVIT1
03/19/2018321194104Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION11
06/17/2021321194104Open ↗
03/04/2021321194104Open ↗
03/02/2021321194104Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET5
01/05/2022322103638Open ↗
11/23/2018321076820Open ↗
08/28/2017321194104Open ↗
Showing 3 of 5 on file for this type
▸Other Documents15
▸BISSupporting Document: Fee Exempt6
01/06/2022322103638Open ↗
01/06/2022322103638Open ↗
01/06/2022322103638Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION5
12/06/2019321194104Open ↗
12/06/2019321194104Open ↗
12/06/2019321194104Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM3
01/06/2022322103638Open ↗
03/04/2021321194104Open ↗
01/14/2019321194104Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026B00707673-I1Open ↗