← Back
Three families
1409 GREENE AVENUE
BROOKLYN · Bushwick (West) · BIN 3075174
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6Zoning
—Gross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · Owner of record: TOWNHOUSE RENTAL, L.L.C. · 1.71 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 15 docs
Floor 31p · 1 filing · 15 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOWNHOUSE RENTAL, LLC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
L & C ASSOCIATES912/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EAST ENDERS NYC INCGeneral Contractor903/21/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781512/06/2021
Building Lifecycle
All (116)Filed (9)Permit Issued (4)Signed Off (3)Violation (60)Inspection (10)Special Inspection (30)
02/15/2024
Violation issued (HPD, closed)
C
02/15/2024
Violation issued (HPD, closed)
C
02/15/2024
Violation issued (HPD, closed)
C
12/15/2023
Violation issued (HPD, closed)
C
12/15/2023
Violation issued (HPD, closed)
C
02/25/2022
Violation issued (HPD, closed)
A
01/11/2022
Violation issued (HPD, closed)
B
01/11/2022
Violation issued (HPD, closed)
A
01/11/2022
Violation issued (HPD, closed)
C
01/11/2022
Violation issued (HPD, closed)
B
01/11/2022
Violation issued (HPD, closed)
C
01/06/2022
Signed off — Alteration
PLUMBING WORKS AT EXISTING 3 STORY HOUSE AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00499966-I1
12/26/2021
Signed off — Alteration
INTERIOR RENOVATION AT EXISTING 3 STORY HOUSE AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION. RESOLVING VIOLATION# 34876929R, 34831901X, 34831900Y
B00499806-I1
12/22/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/22/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
12/22/2021
Special inspection requirement — HVAC-R and service water heating system controls
RONNY LAM
12/22/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
12/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
RONNY LAM
12/21/2021
Signed off — Alteration
INTERIOR RENOVATION AT EXISTING 3 STORIES HOUSE WITH MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY ON THIS APPLICATION
B00499993-I1
12/20/2021
Filed — Alteration
PLUMBING WORKS AT EXISTING 3 STORY HOUSE AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00499966-P3
12/20/2021
Special inspection requirement — HVAC-R and service water heating system controls
RONNY LAM
12/20/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
12/20/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
12/20/2021
Special inspection requirement — HVAC-R and service water heating equipment
RONNY LAM
12/15/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/13/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2021
Filed — Alteration
INTERIOR RENOVATION AT EXISTING 3 STORY HOUSE AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION. RESOLVING VIOLATION# 34876929R, 34831901X, 34831900Y
B00499806-P2
12/06/2021
Filed — Alteration
PLUMBING WORKS AT EXISTING 3 STORY HOUSE AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00499966-P2
12/06/2021
Special inspection requirement — HVAC-R and service water heating equipment
RONNY LAM
12/06/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
12/06/2021
Special inspection requirement — HVAC-R and service water heating system controls
RONNY LAM
12/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
12/06/2021
Special inspection requirement — Air barrier - visual inspection
RONNY LAM
12/06/2021
Special inspection requirement — Interior lighting power
RONNY LAM
12/06/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
RONNY LAM
12/06/2021
Special inspection requirement — Fenestration areas
RONNY LAM
12/06/2021
Special inspection requirement — Fenestration air leakage
RONNY LAM
12/06/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
12/06/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
12/02/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/30/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/29/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/15/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/21/2021
Permit issued — General Construction
B00499806-I1-GC
07/02/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/02/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/02/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/26/2021
Permit issued — Plumbing
B00499966-I1-PL
06/16/2021
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
06/16/2021
Special inspection requirement — Final
CHRISTIAN LOZADA
06/16/2021
Special inspection requirement — Duct leakage testing, insulation and design
RONNY LAM
06/16/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
06/16/2021
Special inspection requirement — HVAC-R and service water heating system controls
RONNY LAM
06/16/2021
Special inspection requirement — HVAC-R and service water heating equipment
RONNY LAM
06/16/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
06/14/2021
Filed — Alteration
PLUMBING WORKS AT EXISTING 3 STORY HOUSE AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00499966-P1
06/14/2021
Filed — Alteration
INTERIOR RENOVATION AT EXISTING 3 STORY HOUSE AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION. RESOLVING VIOLATION# 34876929R, 34831901X, 34831900Y
B00499806-P1
06/14/2021
Filed — Alteration
INTERIOR RENOVATION AT EXISTING 3 STORIES HOUSE WITH MECHANICAL WORK AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY ON THIS APPLICATION
B00499993-P1
06/14/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
06/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEAST ENDERS NYC INC10/21/2021
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI06/26/2021
DOB NOWMechanical SystemsSigned-offEAST ENDERS NYC INC05/26/2021
DOB NOWGeneral ConstructionSigned-offEAST ENDERS NYC INC05/18/2021
BISOTISSUEDN/A02/07/2012
1 project · most recent 03/08/2021
General Wiring
FiledStatusContractorScope
03/08/2021CompleteROYAL ELEC'L CONTR'G CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/22/2021Pass-Final General Construction Non-Directive 14PassView ↗
12/15/2021Pass-Final General Construction Non-Directive 14PassView ↗
12/13/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/02/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/30/2021Fail-Final General Construction Non-Directive 14FailView ↗
11/29/2021Fail-Final General Construction Non-Directive 14FailView ↗
11/15/2021Fail-Final General Construction Non-Directive 14FailView ↗
07/02/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/02/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
12/22/2021Energy Code Compliance InspectionsRONNY LAMprogress
12/22/2021HVAC-R and service water heating system controlsRONNY LAMenergy_progress
12/22/2021HVAC-R and service water piping design and insulationRONNY LAMenergy_progress
12/22/2021HVAC-R and service water heating equipmentRONNY LAMenergy_progress
12/20/2021HVAC-R and service water heating system controlsRONNY LAMenergy_progress
12/20/2021Energy Code Compliance InspectionsRONNY LAMprogress
12/20/2021HVAC-R and service water piping design and insulationRONNY LAMenergy_progress
12/20/2021HVAC-R and service water heating equipmentRONNY LAMenergy_progress
12/06/2021HVAC-R and service water heating equipmentRONNY LAMenergy_progress
12/06/2021HVAC-R and service water piping design and insulationRONNY LAMenergy_progress
12/06/2021HVAC-R and service water heating system controlsRONNY LAMenergy_progress
12/06/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
12/06/2021Air barrier - visual inspectionRONNY LAMenergy_progress
12/06/2021Interior lighting powerRONNY LAMenergy_progress
12/06/2021Fenestration and door U-factor and product ratingsRONNY LAMenergy_progress
12/06/2021Fenestration areasRONNY LAMenergy_progress
12/06/2021Fenestration air leakageRONNY LAMenergy_progress
12/06/2021Energy Code Compliance InspectionsRONNY LAMprogress
12/06/2021Energy Code Compliance InspectionsRONNY LAMprogress
06/16/2021Mechanical SystemsCHRISTIAN LOZADAspecial
06/16/2021FinalCHRISTIAN LOZADAprogress
06/16/2021Duct leakage testing, insulation and designRONNY LAMenergy_progress
06/16/2021HVAC-R and service water piping design and insulationRONNY LAMenergy_progress
06/16/2021HVAC-R and service water heating system controlsRONNY LAMenergy_progress
06/16/2021HVAC-R and service water heating equipmentRONNY LAMenergy_progress
Latest 25 of 40.
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026B00499993-P1Request digital key ↗
09/01/2026B00499993-I1Request digital key ↗
09/01/2026B00499966-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION5
05/10/2022320426213Open ↗
04/01/2022320426213Open ↗
02/07/2022322084686Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
02/13/2012320426213Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature18
09/02/2026B00499966-P2Open ↗
09/02/2026B00499966-P2Open ↗
09/01/2026B00499966-P3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/13/2026B00499966-P3Open ↗
08/13/2026B00499806-I1Open ↗
08/13/2026B00499806-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026B00499993-P1Open ↗
08/26/2026B00499993-I1Open ↗
08/25/2026B00499806-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/23/2012320426213Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/23/2012320426213Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/23/2012320426213Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/13/2026B00499966-P3Open ↗
08/13/2026B00499806-P2Open ↗
08/13/2026B00499806-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
01/23/2012320426213Open ↗
01/23/2012320426213Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00499993-I1Open ↗
08/13/2026B00499966-I1Open ↗
08/13/2026B00499806-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
01/23/2012320426213Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
01/23/2012320426213Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/23/2012320426213Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
05/01/2020322084686Open ↗
01/23/2012320426213Open ↗
▸BISBOROUGH INTAKE FORM1
03/23/2022320426213Open ↗