← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Parkchester South Condominium
1409 METROPOLITAN OVAL · BIN 2096620
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R6Zoning
1,842,649 sfGross Floor Area
2,141Units
Rent Stabilized633 Open Violations 627 unresolved · 6 paperwork only ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: PARKCHESTER SOUTH CONDOMINIUM ASSOC · 914,087 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 2 filings · 9 docs
BulkheadUnder Construction1p · 1 filing · 6 docs
BasementUnder Construction1p · 1 filing · 4 docs
Sub-BasementUnder Construction2p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEMX709/13/2026
PARKCHESTER SOUTH CONDO1907/08/2026
PRATT CONSTRUCTION INC.703/22/2026
PPC CONSTRUCTION603/21/2026
COLGATE ENTERPRISES403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP307/18/2026
CONNOLLY ENGINEERING, PLLC111/05/2025
RIMKUS NEW YORK PLLC103/25/2025
ASHRAF CORP102/14/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.203/21/2026
HH BUILDING CONSULTING & ARCHITECTU203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRATT CONSTRUCTION & RESTGeneral Contractor603/21/2026
ANTHONY MATRONEElectrical203/21/2026
LEMX CORPGeneral Contractor207/08/2026
STEVEN FARKASElectrical103/21/2026
D.D.S. MECHANICAL PLUMBGeneral Contractor104/09/2026
MATRONE ANTHONYElectrical103/21/2026
PNA CONTRACTING CORPGeneral Contractor107/08/2026
PAUL OLSENElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONNOLLY ENGINEERING, PLL3427111/05/2025
OUTSOURCE SPECIAL INSPECT2827111/05/2025
RIMKUS NEW YORK, PLLC8123103/25/2025
Building Lifecycle
All (97)Filed (8)Permit Issued (8)Signed Off (2)Facade (FISP) (12)Violation (60)Objection (2)Special Inspection (5)
08/29/2026
Violation issued (HPD, open)
B
08/29/2026
Violation issued (HPD, open)
B
08/29/2026
Violation issued (HPD, open)
B
08/29/2026
Violation issued (HPD, open)
B
07/18/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01366503-P2
07/13/2026
Signed off — Alteration
MATERIAL HOIST. FOR MATERIAL ONLY. NO WORK FROM HOIST.
X01402183-I1
06/13/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01366503-P1
06/05/2026
Permit issued — Sidewalk Shed
X01366503-I1-SH
06/01/2026
Permit issued — General Construction
X01168899-I1-GC
06/01/2026
Permit issued — Suspended Scaffold
X01402183-I1-SC
05/18/2026
Filed — Alteration
MATERIAL HOIST. FOR MATERIAL ONLY. NO WORK FROM HOIST.
X01402183-I1
05/08/2026
Permit issued — Suspended Scaffold
X01383100-I1-SC
04/21/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
X01383100-I1
03/09/2026
Permit issued — Sidewalk Shed
X01366503-I1-SH
03/07/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01366503-I1
01/09/2026
Permit issued — Structural
X01311421-I1-ST
12/12/2025
Violation issued (HPD, closed)
B
11/24/2025
Objection resolved — Addressed
11/17/2025
Objection raised — Cost
11/05/2025
Filed — Alteration
BASEMENT FOUNDATION WALL REPAIRS INCLUDING CONCRETE REINFORCEMENT, PATCHING AND REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01311421-I1
10/31/2025
Special inspection requirement — Post-installed Anchors
daniel connolly
10/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
daniel connolly
10/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
10/30/2025
Special inspection requirement — Final
daniel connolly
05/25/2025
Violation issued (HPD, closed)
C
03/25/2025
Filed — Alteration
X01168899-I1
02/07/2025
Violation issued (HPD, closed)
C
02/07/2025
Violation issued (HPD, closed)
A
01/31/2025
Violation issued (HPD, closed)
C
01/31/2025
Violation issued (HPD, closed)
C
01/28/2025
Violation issued (HPD, closed)
B
01/28/2025
Violation issued (HPD, closed)
A
01/28/2025
Violation issued (HPD, closed)
A
01/28/2025
Violation issued (HPD, closed)
B
01/28/2025
Violation issued (HPD, open)
B
01/28/2025
Violation issued (HPD, closed)
B
11/27/2024
Violation issued (HPD, closed)
C
11/27/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
C
12/21/2023
Violation issued (FDNY_NOV, closed)
11/06/2023
Violation issued (HPD, closed)
C
11/06/2023
Violation issued (HPD, closed)
C
11/06/2023
Violation issued (HPD, closed)
A
11/06/2023
Violation issued (HPD, closed)
B
11/06/2023
Violation issued (HPD, open)
C
11/06/2023
Violation issued (HPD, open)
C
11/06/2023
Violation issued (HPD, closed)
C
11/06/2023
Violation issued (HPD, closed)
B
11/06/2023
Violation issued (HPD, closed)
B
11/06/2023
Violation issued (HPD, closed)
B
11/06/2023
Violation issued (HPD, closed)
B
11/06/2023
Violation issued (HPD, closed)
B
11/06/2023
Violation issued (HPD, open)
C
03/01/2023
Violation issued (FDNY_NOV, closed)
08/07/2022
Violation issued (HPD, closed)
C
04/20/2022
Violation issued (HPD, closed)
B
04/20/2022
Violation issued (HPD, open)
C
04/20/2022
Violation issued (HPD, closed)
B
04/20/2022
Violation issued (HPD, closed)
B
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedLEMX CORP06/05/2026
DOB NOWGeneral ConstructionPermit IssuedPNA CONTRACTING CORP06/01/2026
DOB NOWSuspended ScaffoldSigned-offROSENWACH TANK CO.,LLC06/01/2026
DOB NOWSuspended ScaffoldPermit IssuedPNA CONTRACTING CORP05/08/2026
DOB NOWSidewalk ShedPermit IssuedLEMX CORP03/09/2026
DOB NOWStructuralPermit IssuedD.D.S. MECHANICAL PLUMB01/09/2026
DOB NOWSidewalk ShedSigned-offPRATT CONSTRUCTION & RES*01/15/2021
DOB NOWSidewalk ShedSigned-offPRATT CONSTRUCTION & RES*02/25/2020
BISOTISSUEDTWO-TONE CONTRACTING CORP.08/07/2020
BISEQISSUEDCOLGATE ENTERPRISE CORP03/20/2014
BISOTISSUEDCERCONE EXTERIOR REST COR02/04/2014
BISOTISSUEDCERCONE EXTERIOR REST COR08/21/2013
BISEQISSUEDCOLGATE ENTERPRISE CORP03/20/2013
BISEQISSUEDCOLGATE ENTERPRISE CORP09/20/2012
BISPLISSUEDPSEC PLUMBING & HEATING CORP.02/26/2003
BISOTISSUEDP.P.C. CONSTRUCTION L.L.C.01/25/2001
BISPLISSUEDBLUEPRINT PLG CORP01/24/2001
BISEQISSUEDSPRING SCAFFOLDING INC.10/31/2000
BISOTISSUEDNESA INC.10/31/2000
2 projects · most recent 03/07/2026
FiledStatusContractorScope
03/07/2026CompleteRICHARD NEU—
02/22/2020CompleteSTEVEN FARKAS—
1 project · most recent 11/05/2025
FiledStatusContractorScope
11/05/2025Permit IssuedD.D.S. MECHANICAL PLUMB2 scope_items
1 project · most recent 07/18/2026
Sidewalk Shed
FiledStatusContractorScope
07/18/2026Permit IssuedLEMX CORPSidewalk Shed
2 projects · most recent 05/18/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/18/2026Signed-offROSENWACH TANK CO.,LLCSuspended Scaffold (SC)
04/21/2026Permit IssuedPNA CONTRACTING CORPSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/31/2025Post-installed Anchorsdaniel connollyspecial
10/31/2025Structural Stability – Alterations of existing buildingsdaniel connollyspecial
10/31/2025Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
10/30/2025Finaldaniel connollyprogress
02/13/2020FinalEric Fosterprogress
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/19/2026X01168899-I1Request digital key ↗
08/19/2026X01168899-P2Request digital key ↗
08/17/2026X01366503-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00315926-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION9
06/17/2020220726757Open ↗
05/14/2020220726757Open ↗
02/25/2020220726757Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION6
08/07/2020220726757Open ↗
03/28/2014220230569Open ↗
02/05/2014220322764Open ↗
Showing 3 of 6 on file for this type
▸BISPROVIDE SCAFFOLDING APPLICATION JOB NUMBER PRIOR TO PERMIT.1
08/06/2020220726757Open ↗
▸Seals & Professional Certifications27
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
02/25/2020220726757Open ↗
08/13/2018220230569Open ↗
08/06/2018220230569Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026X01168899-P2Open ↗
08/19/2026X01168899-I1Open ↗
08/17/2026X01366503-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/06/2018220230569Open ↗
08/06/2013220230569Open ↗
07/06/2013220322764Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
08/06/2013220230569Open ↗
07/06/2013220322764Open ↗
09/21/2012220230569Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026X01311421-I1Open ↗
08/25/2026X01311421-I1Open ↗
08/25/2026X01311421-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026X00315926-I1Open ↗
08/25/2026X01311421-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/06/2018220230569Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
02/25/2020220726757Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00315926-I1Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/25/2020220726757Open ↗
07/06/2013220322764Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026X01168899-P2Open ↗
08/19/2026X01168899-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/25/2020220726757Open ↗
02/21/2014220322764Open ↗
07/06/2013220322764Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/26/2021220726757Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/26/2021220726757Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/26/2021220726757Open ↗
08/05/2020220726757Open ↗
07/20/2020220726757Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/26/2021220726757Open ↗
08/13/2018220230569Open ↗
08/06/2018220230569Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
03/25/2013220230569Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/21/2012220230569Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
03/26/2021220726757Open ↗
02/25/2020220726757Open ↗
02/21/2014220322764Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION4
02/25/2020220726757Open ↗
08/06/2018220230569Open ↗
10/24/2013220230569Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
02/25/2020220726757Open ↗
07/06/2013220322764Open ↗
09/21/2012220230569Open ↗
▸BISBOROUGH INTAKE FORM2
08/13/2018220230569Open ↗
08/06/2018220230569Open ↗
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/17/2026X01383100-I1Open ↗
08/16/2026X01402183-I1Open ↗
▸DOB NOWCalculations2
08/17/2026X01383100-I1Open ↗
08/16/2026X01402183-I1Open ↗