← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Parkchester South Condominium
1409 METROPOLITAN OVAL · BIN 2096615
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R6Zoning
1,842,649 sfGross Floor Area
2,141Units
Rent Stabilized632 Open Violations 626 unresolved · 6 paperwork only ▸FISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: PARKCHESTER SOUTH CONDOMINIUM ASSOC · 914,087 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof5p · 2 filings · 6 docs
Bulkhead1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEMX407/08/2026
PSC304/09/2026
PARKCHESTER SOUTH CONDO503/22/2026
ROCK GROUP NY CORP303/21/2026
PPC PROPERTY SERVICE203/21/2026
PPC CONSTRUCTION603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIMKUS NEW YORK PLLC101/28/2025
ARQUITECTURA VARELA101/22/2025
CONNOLLY ENGINEERING, PLLC103/03/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OUTSOURCE CONSULTANTS, INC.403/21/2026
PS ENGINEERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VINCO BUILDERS LLCGeneral Contractor303/21/2026
RICHARD NEUElectrical103/21/2026
LEMX CORPGeneral Contractor107/08/2026
TWO-TONE CONTRACTING CORP.General Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIMKUS NEW YORK, PLLC8123101/28/2025
CONNOLLY ENGINEERING, PLL3427103/03/2024
OUTSOURCE SPECIAL INSPECT2827103/03/2024
Building Lifecycle
All (89)Filed (4)Permit Issued (4)Signed Off (1)Facade (FISP) (12)Violation (60)Inspection (4)Special Inspection (4)
03/10/2026
Violation issued (HPD, open)
A
11/06/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01164149-I1
10/18/2025
Violation issued (HPD, closed)
C
04/08/2025
Permit issued — Suspended Scaffold
X01202394-I1-SC
04/04/2025
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
X01202394-I1
04/01/2025
Permit issued — General Construction
X01141351-I1-GC
01/28/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR FACADE RESTORATION AS SHOWN ONPLANS SUBMITTED. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01141351-I1
01/23/2025
Permit issued — Sidewalk Shed
X01164149-I1-SH
01/22/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X01164149-I1
10/23/2024
Violation issued (HPD, closed)
C
10/23/2024
Violation issued (HPD, closed)
C
07/13/2024
Violation issued (HPD, closed)
B
07/13/2024
Violation issued (HPD, open)
B
07/13/2024
Violation issued (HPD, open)
B
07/13/2024
Violation issued (HPD, open)
B
07/13/2024
Violation issued (HPD, open)
B
07/01/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/13/2024
Permit issued — Structural
X00998137-I1-GC-CX
06/11/2024
Violation issued (HPD, closed)
A
06/11/2024
Violation issued (HPD, open)
C
05/09/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/19/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2024
Filed — Alteration
X00998137-I1
02/27/2024
Special inspection requirement — Post-installed Anchors
daniel connolly
02/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
02/06/2024
Special inspection requirement — Structural Steel - Details
daniel connolly
01/30/2024
Special inspection requirement — Final
daniel connolly
06/14/2023
Cycle 9 facade report signed — SWARMP
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/21/2023
Cycle 9 facade report submitted
02/02/2023
Cycle 9 facade inspection completed
08/13/2022
Violation issued (HPD, open)
B
08/13/2022
Violation issued (HPD, open)
B
06/28/2022
Violation issued (HPD, open)
B
04/25/2022
Violation issued (HPD, closed)
A
04/25/2022
Violation issued (HPD, open)
B
04/25/2022
Violation issued (HPD, open)
C
04/25/2022
Violation issued (HPD, closed)
A
02/13/2022
Violation issued (HPD, closed)
B
02/13/2022
Violation issued (HPD, closed)
B
02/13/2022
Violation issued (HPD, closed)
C
02/13/2022
Violation issued (HPD, closed)
B
02/13/2022
Violation issued (HPD, closed)
B
02/13/2022
Violation issued (HPD, closed)
B
11/04/2021
Violation issued (HPD, closed)
A
11/04/2021
Violation issued (HPD, closed)
A
06/19/2021
Violation issued (HPD, open)
C
06/19/2021
Violation issued (HPD, closed)
B
06/19/2021
Violation issued (HPD, closed)
A
06/19/2021
Violation issued (HPD, closed)
B
06/19/2021
Violation issued (HPD, open)
C
04/15/2021
Violation issued (HPD, closed)
B
01/05/2021
Violation issued (HPD, closed)
B
08/15/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/14/2018
Violation issued (HPD, closed)
B
09/14/2018
Violation issued (HPD, closed)
B
09/10/2018
Violation issued (HPD, closed)
A
07/19/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/09/2017
Violation issued (HPD, closed)
I
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP04/08/2025
DOB NOWGeneral ConstructionSigned-offTWO-TONE CONTRACTING CORP04/01/2025
DOB NOWSidewalk ShedSigned-offLEMX CORP01/23/2025
DOB NOWStructuralPermit IssuedVINCO BUILDERS LLC06/13/2024
BISOTISSUEDVINCO BUILDERS LLC10/31/2017
BISOTISSUEDVINCO BUILDERS LLC09/19/2017
BISOTISSUEDSKYLINE RESTORATION INC07/07/2016
BISEQISSUEDROCK GROUP NY CORP05/09/2016
BISPLISSUEDTHE RIGHT CONNECTION P&H07/18/2002
BISOTISSUEDP.P.C. CONSTRUCTION L.L.C.07/18/2001
BISOTISSUEDP.P.C. CONSTRUCTION L.L.C.02/21/2001
BISPLISSUEDBLUEPRINT PLUMBING CORP.02/21/2001
1 project · most recent 01/22/2025
FiledStatusContractorScope
01/22/2025CompleteRICHARD NEU—
1 project · most recent 04/04/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/04/2025Permit IssuedTWO-TONE CONTRACTING CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/01/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/09/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/19/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
02/27/2024Post-installed Anchorsdaniel connollyspecial
02/21/2024Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
02/06/2024Structural Steel - Detailsdaniel connollyspecial
01/30/2024Finaldaniel connollyprogress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026X00998137-I1Request digital key ↗
08/20/2026X01164149-I1Request digital key ↗
08/20/2026X01141351-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
03/17/2020220615779Open ↗
03/11/2020220615779Open ↗
02/28/2020220615779Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
11/03/2017220615779Open ↗
09/19/2017220615779Open ↗
07/07/2016220523725Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications17
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
08/20/2018220615779Open ↗
09/19/2017220615779Open ↗
05/03/2017220523725Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X00998137-I1Open ↗
09/01/2026X00998137-I1Open ↗
09/01/2026X00998137-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026X01164149-I1Open ↗
08/13/2026X01141351-I1Open ↗
08/13/2026X00998137-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/15/2017220615779Open ↗
05/05/2016240140735Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/19/2017220615779Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/05/2016240140735Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/05/2016240140735Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026X00998137-I1Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
09/15/2017220615779Open ↗
05/05/2016220523725Open ↗
05/05/2016240140735Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026X01141351-I1Open ↗
08/13/2026X00998137-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/19/2017220615779Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/07/2016220523725Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
08/20/2018220615779Open ↗
09/19/2017220615779Open ↗
05/03/2017220523725Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/20/2018220615779Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/05/2016240140735Open ↗
▸BISTECHNICAL REPORT: EXT. WALLS & APPURTS1
05/05/2016220523725Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/18/2020220615779Open ↗
04/12/2019220615779Open ↗
08/20/2018220615779Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
08/20/2018220615779Open ↗
09/15/2017220615779Open ↗
05/03/2017220523725Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms7
▸BISBOROUGH INTAKE FORM3
03/18/2020220615779Open ↗
03/11/2020220615779Open ↗
08/20/2018220615779Open ↗
▸BISEFILING COVER SHEET2
09/15/2017220615779Open ↗
05/05/2016220523725Open ↗
▸BISADDITIONAL INFORMATION1
05/25/2016220523725Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/05/2016240140735Open ↗
▸Other Documents5
▸BISDHCR DOCUMENT2
03/17/2020220615779Open ↗
03/11/2020220615779Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
05/05/2016240140735Open ↗
▸DOB NOWCalculations1
08/13/2026X01202394-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01202394-I1Open ↗