← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Parkchester South Condominium
1409 METROPOLITAN OVAL · BIN 2096623
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R6Zoning
1,842,649 sfGross Floor Area
2,141Units
Rent Stabilized631 Open Violations 625 unresolved · 6 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: PARKCHESTER SOUTH CONDOMINIUM ASSOC · 914,087 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Roof6p · 2 filings · 16 docs
Bulkhead2p · 1 filing · 9 docs
Floor 71p · 1 filing · 12 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 7 docs
Cellar2p · 2 filings · 20 docs
3 jobs · most recent 11/20/2025
General Wiring
FiledStatusContractorScope
11/20/2025CompleteLION ELECTRIC INCGeneral Wiring
04/14/2022CompleteHIGH QUALITY ELECTRIC OF—
01/24/2022CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
Building Lifecycle
All (123)Filed (7)Permit Issued (7)Signed Off (5)Facade (FISP) (12)Violation (60)Objection (2)Special Inspection (30)
12/17/2025
Signed off — Alteration
REPLACEMENT OF HVAC UNIT. NO CHANGE TO USE, EGRESS, OR OCCUPLANCY.
X01221548-I1
06/09/2025
Permit issued — Mechanical Systems
X01221548-I1-MS
05/19/2025
Filed — Alteration
REPLACEMENT OF HVAC UNIT. NO CHANGE TO USE, EGRESS, OR OCCUPLANCY.
X01221548-I1
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
05/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
05/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
05/06/2025
Special inspection requirement — Mechanical Systems
steven Giammona
05/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
steven Giammona
05/06/2025
Special inspection requirement — Final
steven Giammona
11/27/2024
Violation issued (HPD, closed)
C
11/27/2024
Violation issued (HPD, closed)
C
11/14/2024
Violation issued (HPD, closed)
C
11/13/2024
Violation issued (HPD, closed)
B
10/31/2024
Violation issued (HPD, closed)
C
10/30/2024
Violation issued (HPD, closed)
C
10/30/2024
Violation issued (HPD, closed)
C
01/11/2024
Signed off — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE ROOF SLAB in Apt #7A, 7B, 7C, 7D, 7E, 7F, 7G, 7H, & HALLWAY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X08030246-I1
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, closed)
A
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, closed)
A
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, closed)
A
11/29/2023
Violation issued (HPD, closed)
A
11/29/2023
Violation issued (HPD, closed)
A
11/29/2023
Violation issued (HPD, open)
B
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, closed)
B
11/29/2023
Violation issued (HPD, closed)
C
11/29/2023
Violation issued (HPD, open)
C
11/29/2023
Violation issued (HPD, open)
C
03/24/2023
Permit issued — Structural
X08030246-I1-ST
03/08/2023
Permit issued — Structural
X08030246-I1-ST
03/01/2023
Special inspection requirement — Post-installed Anchors
daniel connolly
03/01/2023
Special inspection requirement — Structural Steel - High Strength Bolting
daniel connolly
03/01/2023
Special inspection requirement — Structural Steel - Details
daniel connolly
03/01/2023
Special inspection requirement — Structural Steel - Welding
daniel connolly
03/01/2023
Special inspection requirement — Final
daniel connolly
03/01/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
daniel connolly
02/28/2023
Objection resolved — Addressed
02/23/2023
Objection raised — Other
02/22/2023
Filed — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE ROOF SLAB in Apt #7A, 7B, 7C, 7D, 7E, 7F, 7G, 7H, & HALLWAY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X08030246-P1
02/21/2023
Special inspection requirement — Structural Steel - Welding
daniel connolly
02/21/2023
Special inspection requirement — Structural Steel - High Strength Bolting
daniel connolly
02/21/2023
Special inspection requirement — Structural Steel - Details
daniel connolly
02/21/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
daniel connolly
02/21/2023
Special inspection requirement — Post-installed Anchors
daniel connolly
02/21/2023
Special inspection requirement — Final
daniel connolly
02/20/2023
Cycle 9 facade report submitted
02/20/2023
Cycle 9 facade report signed — SAFE
02/13/2023
Signed off — Alteration
X00681018-I1
02/13/2023
Signed off — Alteration
X00661215-I1
02/02/2023
Cycle 9 facade inspection completed
11/18/2022
Violation issued (HPD, closed)
B
11/18/2022
Violation issued (HPD, closed)
B
11/04/2022
Filed — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE ROOF SLAB in Apt #7A, 7B, 7C, 7D, 7E, 7F, 7G, 7H, & HALLWAY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X08030246-I1
10/28/2022
Violation issued (HPD, closed)
B
Latest 60 of 123 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY407/08/2026
PARKCHESTER SOUTH CONDO903/22/2026
MAYEFELD ARCHITECT103/22/2026
PPC CONSTRUCTION603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
POLARWORX INC.105/19/2025
CONNOLLY ENGINEERING, PLLC202/22/2023
MOHAMMAD AHEAD, PE103/14/2022
RIMKUS NEW YORK PLLC102/26/2022
METRO STRUCTURES207/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PINNACLE BUILDING CON203/21/2026
OUTSOURCE CONSULTANTS, INC.303/21/2026
J A EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MICHAEL JAMES INDUSTRIESGeneral Contractor407/08/2026
TWO-TONE CONTRACTING CORP.General Contractor403/21/2026
PROTO RESTORATION CONSTRUCTIONGeneral Contractor303/21/2026
ALEXANDER EUGENEElectrical103/21/2026
KINGS GROUP NY CORPGeneral Contractor107/08/2026
ECNY ELEC'L CONTR'S, INCElectrical103/22/2026
AIR EXCHANGE AND ENERGY SGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SGM ENGINEERING2366105/19/2025
CONNOLLY ENGINEERING, PLL3427202/22/2023
RIMKUS NEW YORK, PLLC8123102/26/2022
SUPERIOR - HOME INSPECTIO1804207/28/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAIR EXCHANGE AND ENERGY S06/09/2025
DOB NOWStructuralSigned-offTWO-TONE CONTRACTING CORP03/24/2023
DOB NOWStructuralSigned-offTWO-TONE CONTRACTING CORP03/08/2023
DOB NOWGeneral ConstructionSigned-offPROTO RESTORATION CONSTRU06/08/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP03/14/2022
DOB NOWMechanical SystemsSigned-offMICHAEL JAMES INDUSTRIES02/02/2021
DOB NOWMechanical SystemsSigned-offMICHAEL JAMES INDUSTRIES10/22/2020
BISSPISSUEDUNIVERSAL FIRE SPR LLC12/01/2014
BISPLISSUEDMETROTECH MECHANICAL CORP04/10/2014
BISMHISSUEDARA CONSTRUCTION CORP04/07/2014
BISOTISSUEDARA CONSTRUCTION CORP04/07/2014
BISOTISSUEDEBCOR CONSTRUCTION NY COR06/19/2013
BISOTISSUEDEBCOR CONSTRUCTION NY COR06/10/2013
BISEQISSUEDOUTDOOR INSTALLATION LLC12/14/2007
BISEQRE-ISSUEDOUTDOOR INSTALLATION LLC04/12/2007
BISOTISSUEDTECHNICAL CONSTRUCTION SRVCES08/03/2005
BISOTISSUEDDNA CONTRACTING LLC06/19/2003
BISOTISSUEDPPC CONSTRUCTION LLC07/30/2002
BISPLISSUEDTHE RIGHT CONNECTION P&H07/18/2002
BISPLISSUEDBLUEPRINT PLG CORPORATION04/04/2002
BISOTISSUEDPPC CONSTRUCTION LLC04/04/2002
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
05/19/2025Energy Code Compliance Inspectionssteven Giammonaprogress
05/16/2025HVAC-R and service water heating system controlssteven Giammonaenergy_progress
05/16/2025HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
05/06/2025Mechanical Systemssteven Giammonaspecial
05/06/2025Tenant Protection Plan Compliancesteven Giammonaspecial
05/06/2025Finalsteven Giammonaprogress
03/01/2023Post-installed Anchorsdaniel connollyspecial
03/01/2023Structural Steel - High Strength Boltingdaniel connollyspecial
03/01/2023Structural Steel - Detailsdaniel connollyspecial
03/01/2023Structural Steel - Weldingdaniel connollyspecial
03/01/2023Finaldaniel connollyprogress
03/01/2023Structural Stability – Alterations of existing buildingsdaniel connollyspecial
02/21/2023Structural Steel - Weldingdaniel connollyspecial
02/21/2023Structural Steel - High Strength Boltingdaniel connollyspecial
02/21/2023Structural Steel - Detailsdaniel connollyspecial
02/21/2023Structural Stability – Alterations of existing buildingsdaniel connollyspecial
02/21/2023Post-installed Anchorsdaniel connollyspecial
02/21/2023Finaldaniel connollyprogress
01/12/2022MasonryBrian Sullivanspecial
01/12/2022Post-installed AnchorsBrian Sullivanspecial
01/12/2022FinalBrian Sullivanprogress
01/12/2022Air barrier - visual inspectionBrian Sullivanenergy_progress
01/12/2022Insulation placement and R valuesBrian Sullivanenergy_progress
07/30/2021HVAC and service water heating system controls Augustine Angbaenergy_progress
07/30/2021HVAC insulation and sealing Augustine Angbaenergy_progress
Latest 25 of 35.
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/24/2026X00661215-I1Request digital key ↗
08/24/2026X00681018-I1Request digital key ↗
08/23/2026X08030246-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/25/2026X00387381-I1Request digital key ↗
08/25/2026X00387381-P1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION11
09/14/2015220366468Open ↗
02/18/2015220366477Open ↗
10/31/2014220366468Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION6
12/08/2014220366495Open ↗
10/31/2014220366495Open ↗
04/15/2014220366477Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications54
▸DOB NOWProgress Inspector Seal & Signature17
08/28/2026X08030246-I1Open ↗
08/27/2026X01221548-I1Open ↗
08/27/2026X01221548-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
02/26/2015220366477Open ↗
02/18/2015220366477Open ↗
12/30/2014220366477Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/28/2026X08030246-I1Open ↗
08/28/2026X08030246-I1Open ↗
08/28/2026X08030246-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026X00387381-P1Open ↗
08/25/2026X00387381-I1Open ↗
08/24/2026X00661215-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
10/31/2014220366495Open ↗
04/08/2014220366477Open ↗
04/08/2014220366495Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/08/2014220366477Open ↗
04/08/2014220366477Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/10/2013220283501Open ↗
▸Trade Schedules & Equipment9
▸BISEQUIPMENT USE PERMITS3
03/03/2015220366477Open ↗
03/03/2015220366477Open ↗
03/03/2015220366477Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
12/31/2014220366495Open ↗
11/28/2014220366477Open ↗
05/06/2014220366477Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/08/2014220366477Open ↗
04/08/2014220366495Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/03/2015220366477Open ↗
▸Safety & Tenant Protection3
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
06/04/2013220283501Open ↗
04/26/2013220283501Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/10/2013220283501Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/15/2014220366468Open ↗
04/08/2014220366477Open ↗
04/08/2014220366495Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026X08030246-I1Open ↗
08/14/2026X08030246-P1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/10/2013220283501Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026X00661215-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
12/30/2014220366477Open ↗
06/14/2014220366495Open ↗
04/08/2014220366477Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections1
04/15/2014220366495Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/30/2014220366477Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00661215-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/03/2015220366477Open ↗
01/08/2015220366477Open ↗
12/30/2014220366477Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
12/30/2014220366477Open ↗
04/15/2014220366468Open ↗
04/08/2014220366477Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET5
04/15/2014220366468Open ↗
04/08/2014220366477Open ↗
04/08/2014220366477Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸DOB NOWDHCR Document3
08/25/2026X00387381-P1Open ↗
08/25/2026X00387381-P1Open ↗
08/13/2026X00387381-I1Open ↗