Pier, dock, bulkhead
6224 2 AVENUE
BROOKLYN · BIN 3347532
💬 Discuss this project
1931Year Built
8Stories
T2Building Class
M2-1Zoning
5,359,400 sfGross Floor Area
6Units
LL97 Covered638 Open Violations 554 unresolved · 84 paperwork only ▸FDNY Report ↗
Pier, dock, bulkhead · Owner of record: NYC DEPARTMENT OF SMALL BUSINESS SERVICES · 2,573,197 sf lot · 2.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction80p · 11 filings · 20 docs
Floor 8Under Construction30p · 2 filings · 20 docs
Floor 7Under Construction46p · 2 filings · 20 docs
Floor 6Under Construction46p · 2 filings · 20 docs
Floor 5Under Construction49p · 4 filings · 20 docs
Floor 4Under Construction90p · 5 filings · 20 docs
Floor 3Under Construction57p · 4 filings · 20 docs
Floor 2Under Construction84p · 5 filings · 20 docs
Floor 1Under Construction47p · 2 filings · 20 docs
CellarUnder Construction60p · 6 filings · 20 docs
Sub-BasementUnder Construction9p · 1 filing · 18 docs
3 jobs · most recent 06/25/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Refrigeration Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
06/25/2026Permit IssuedJRM CONSTRUCTION MGMT LLCAir Conditioning Systems, Heating and Air Conditioning Systems—
06/17/2025Signed-offSTRUCTURE TONE, LLCAir Conditioning Systems, Heating Systems, Refrigeration Systems
Cooling
Multiaqua MHCFC4W-12-1 11,900 BTU · Fan Coil Indoor ×18
MHCFC4W 11,900 BTU · Fan Coil Indoor ×2
Airwise NJ-13/CW/K 30 tons · Ahu ×4
Stulz EBD-122-5-E011 73,000 BTU · Crac Unit ×2
OHS-060-F-FC 5 tons · Crac Unit ×2
International Enviro-Tec HDD20 36,000 BTU · Fan Coil Indoor ×2
Heating
International Enviro-Tec HDD12 15,000 BTU · Fan Coil Indoor ×2
Refrigeration
Arctic Chill PACVMV030004-MM-FC 150 tons · Chiller ×2
01/12/2022Permit IssuedCOMPUTER COOL/ICE AGEAir Conditioning Systems, Associated Ducts and Piping
Cooling
Vertiv DME044C 24,000 BTU · Exhaust Fan ×2
2 jobs · most recent 06/25/2026
Sprinkler System
FiledStatusContractorScope
06/25/2026——Sprinkler System
05/01/2023Signed-offCURRENT FIRE PROTECTION I—
6 jobs · most recent 07/14/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
07/14/2026Permit IssuedFORSYTHE PLBG & HTG CORPGas, Water/Sanitary
06/25/2026——Water/Sanitary
05/11/2026Permit IssuedTRISTATE PLBG SVCS CORPStorm
05/22/2024Signed-offUNITED PLBG MECHANICAL INWater/Sanitary
08/31/2023Permit IssuedZ.W. PLBG & HTG CORPGas
08/01/2022Permit IssuedUNITED PLBG MECHANICAL INWater/Sanitary
8 jobs · most recent 09/24/2026
General Wiring Lighting
FiledStatusContractorScope
09/24/2026Permit IssuedLEVEST ELECTRIC CORP.—
07/23/2026CompleteKLEINKNECHT ELEC. CO.,INCGeneral Wiring
06/23/2026CompleteKRISCORP ELECL CONTNG INC1 meters, 1 new_meters
04/23/2026Permit IssuedLEVEST ELECTRIC CORP.General Wiring
11/03/2025Permit IssuedTRANSEL ELEV. & ELEC. INCGeneral Wiring
12/07/2023CompleteKLEINKNECHT ELEC. CO.,INCGeneral Wiring
02/17/2023CompleteA'S ELECTRIC CONTRACTINGGeneral Wiring
08/01/2018CompleteADCO ELEC'L CORPGeneral Wiring, Lighting
2 jobs · most recent 05/11/2026
Concrete Steel
FiledStatusContractorScope
05/11/2026Permit IssuedHUNTER ROBERTS CONSTRUCTIConcrete
12/01/2021Permit IssuedN.Y.FENCE-A-LOT, INCSteel
1 job · most recent 02/25/2025
FiledStatusContractorScope
02/25/2025Permit IssuedEMES SOLAR INC1,250 panels, 725 kw, 305,472.3 roof_area_sqft
1 job · most recent 07/29/2026
Scaffold
FiledStatusContractorScope
07/29/2026Permit IssuedPJP INSTALLERS INCScaffold
Building Lifecycle
All (292)Filed (54)Permit Issued (43)Signed Off (10)Violation (60)Inspection (29)Objection (66)Special Inspection (30)
09/15/2026
Permit issued — Mechanical Systems
B01377675-S1-MS
09/15/2026
Permit issued — General Construction
B01377675-I1-GC
07/30/2026
Permit issued — Supported Scaffold
B01436316-I1-SF
07/29/2026
Filed — Alteration
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01436316-I1
07/22/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
07/14/2026
Filed — Alteration
Plumbing work in conjunction with the removal of boilers under application B01322968-I1 and the installation of new boilers under applications B01322981-I1 and B01322994-I1.
B01322975-P1
07/06/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
07/01/2026
Permit issued — Protection and Mechanical Methods
B01420493-I1-PMM
06/30/2026
Filed — Alteration
Use of knuckleboom for building demolition. This filing is in conjunction with Alteration B01322968
B01420493-I1
06/25/2026
Filed — Alteration
HEREWITH FILING COMMAND CENTER INTERIOR RENOVATIONS ON THE 4TH FLOOR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01377675-S2
06/25/2026
Filed — Alteration
HEREWITH FILING COMMAND CENTER INTERIOR RENOVATIONS ON THE 4TH FLOOR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01377675-S3
06/25/2026
Violation issued (ECB, open)
Unknown
06/25/2026
Objection resolved — Addressed
06/25/2026
Objection resolved — Open
06/25/2026
Objection resolved — Open
06/25/2026
Objection resolved — Addressed
06/25/2026
Objection resolved — Addressed
06/24/2026
Filed — Alteration
HEREWITH FILING FOR REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES AND CEILINGS FOR THE 2ND FLR CRYPTO ROOM PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01378149-I1
06/23/2026
Filed — Alteration
HEREWITH FILING COMMAND CENTER INTERIOR RENOVATIONS ON THE 4TH FLOOR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01377675-I1
06/23/2026
Filed — Alteration
HEREWITH FILING COMMAND CENTER INTERIOR RENOVATIONS ON THE 4TH FLOOR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01377675-S1
06/22/2026
Special inspection requirement — Sprayed fire-resistant materials
Shahrish Shuvo
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Zoning
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Scope
06/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
06/03/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Shahrish Shuvo
06/03/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
05/27/2026
Filed — Alteration
T-Mobile - Relocation of antenna sector, replacement of antennas, installation and replacement of RRUs on the roof. Installation and removal of equipment cabinets on roof. All work in compliance with TPPN 5/98. No change to occupancy, use or egress.
B01114166-I1
05/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/26/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/21/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/19/2026
Permit issued — Plumbing
B01322975-I1-PL
05/19/2026
Objection resolved — Addressed
05/14/2026
Objection raised — Other
05/11/2026
Filed — Alteration
Hereby filing sump pit related to elevator rehabilitation.
B01082570-P3
05/08/2026
Permit issued — Mechanical Systems
B01322968-I1-MS
04/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/24/2026
Special inspection requirement — Final
Shahrish Shuvo
03/11/2026
Permit issued — Structural
B01082570-S3-ST
02/26/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01294037-I1
02/25/2026
Filed — Alteration
Installation of 6 new boilers as per plans herewith. No change to use, egress, or occupancy.
B01322994-I1
02/25/2026
Filed — Alteration
B01322968-I1
02/25/2026
Filed — Alteration
B01322981-I1
02/25/2026
Permit issued — Plumbing
B01082570-S1-PL
02/24/2026
Filed — Alteration
Plumbing work in conjunction with the removal of boilers under application B01322968-I1 and the installation of new boilers under applications B01322981-I1 and B01322994-I1.
B01322975-I1
02/23/2026
Special inspection requirement — Final
MAXIM KORNGOLD
02/23/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
02/23/2026
Special inspection requirement — Concrete - Cast-In-Place
MAXIM KORNGOLD
02/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAXIM KORNGOLD
02/12/2026
Objection resolved — Addressed
02/09/2026
Filed — Alteration
Hereby filing sump pit related to elevator rehabilitation.
B01082570-P2
02/04/2026
Permit issued — General Construction
B01300008-S1-GC
02/02/2026
Objection raised — Scope
01/14/2026
Filed — Alteration
Hereby filing sump pit related to elevator rehabilitation.
B01082570-P1
Latest 60 of 292 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC ECONOMIC DEVELOPEMENT CORP46609/07/2026
NEW YORK CITY ECONOMIC DEVELOPMENT507/08/2026
OWNERS REP304/09/2026
NYC ECONOMIC DEV.CORP.103/21/2026
ECONOMIC DEVELOPMENT703/21/2026
NEW YORK CITY ECONOMIC DEV503/21/2026
BIOBAT503/21/2026
CITISCAPE CONSULTING LTD403/21/2026
NYC PUBLIC DEVELOPMENT903/21/2026
ALMA BANK OF NEW YORK, CO.103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STRUCTURE TONE, LLCGeneral Contractor807/08/2026
COMPUTER COOL/ICE AGEGeneral Contractor607/08/2026
HUNTER ROBERTS CONSTRUCTIONGeneral Contractor404/09/2026
SIRINA FIRE PROT CORPFire Protection407/08/2026
EMES SOLAR INCGeneral Contractor303/21/2026
CARLITOS CONTRACTING CORPGeneral Contractor303/21/2026
VIC RENOVATIONS LLCGeneral Contractor303/21/2026
TAIBE, GRACEElectrical303/21/2026
PASCARELLA, JOSEPHElectrical303/21/2026
N.Y.FENCE-A-LOT, INCGeneral Contractor307/08/2026
MACALUSO GENERAL CONT CORGeneral Contractor303/21/2026
R.A.M.S. MECHANICAL INCGeneral Contractor207/08/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor209/16/2026
ELBRUS AIR CONDITIONING *General Contractor207/08/2026
UNITED PLBG MECHANICAL INCPlumbing207/08/2026
NYC HEAT SOLUTION INCGeneral Contractor107/08/2026
PJP INSTALLERS INCGeneral Contractor107/31/2026
FORSYTHE PLBG & HTG CORPPlumbing107/08/2026
PREFERRED MECHANICAL INCPlumbing107/08/2026
TRISTATE PLBG SVCS CORPPlumbing106/02/2026
Z.W. PLBG & HTG CORPPlumbing107/08/2026
ADCO ELEC'L CORPElectrical103/22/2026
MAUCERI SIGNScaffold107/08/2026
ALABAMA IRONWORKS INCElectrical103/21/2026
ANTHONY LUCIANOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317907/14/2026
SHAHRISH SHUVO ENGINEERIN8524506/25/2026
ELEVATED ENGINEERING PLLC3692105/27/2026
MEP INSPECTIONS, INC1102511/26/2025
OBAID MIAN849308/12/2025
MILROSE CONSULTANTS LLC2003606/17/2025
NKM ENGINEERING PLLC6244102/25/2025
CONCRETE SOLUTIONS LAB CO5344211/29/2023
ADAL ENGINEERING PLLC4205108/31/2023
URBAN ENGINEERS OF NEW YO470205/01/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC09/15/2026
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC09/15/2026
DOB NOWSupported ScaffoldPermit IssuedPJP INSTALLERS INC07/30/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedR.A.M.S. MECHANICAL INC07/01/2026
DOB NOWPlumbingPermit IssuedFORSYTHE PLBG & HTG CORP05/19/2026
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. MECHANICAL INC05/08/2026
DOB NOWStructuralPermit IssuedHUNTER ROBERTS CONSTRUCTION03/11/2026
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP02/25/2026
DOB NOWGeneral ConstructionPermit IssuedCOMPUTER COOL/ICE AGE02/04/2026
DOB NOWMechanical SystemsPermit IssuedHUNTER ROBERTS CONSTRUCTION01/06/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION12/30/2025
DOB NOWGeneral ConstructionPermit IssuedCOMPUTER COOL/ICE AGE12/08/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC10/01/2025
DOB NOWMechanical SystemsSigned-offCOMMERCIAL COOLING SERVI*08/13/2025
DOB NOWSolarPermit IssuedEMES SOLAR INC03/26/2025
DOB NOWPlumbingPermit IssuedZ.W. PLBG & HTG CORP10/31/2023
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC10/24/2023
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC10/24/2023
DOB NOWPlumbingPermit IssuedUNITED PLBG MECHANICAL IN06/30/2023
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP06/28/2023
DOB NOWSprinklersSigned-offCURRENT FIRE PROTECTION I05/11/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP03/01/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP03/01/2023
DOB NOWGeneral ConstructionPermit IssuedVIC RENOVATIONS LLC01/31/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP11/10/2022
DOB NOWPlumbingSigned-offSIRINA FIRE PROT CORP11/09/2022
DOB NOWStandpipeSigned-offPREFERRED MECHANICAL INC10/31/2022
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC10/25/2022
DOB NOWStructuralSigned-offSTRUCTURE TONE, LLC10/25/2022
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC10/21/2022
DOB NOWMechanical SystemsSigned-offELBRUS AIR CONDITIONING *08/30/2022
DOB NOWMechanical SystemsPermit IssuedCOMPUTER COOL/ICE AGE06/02/2022
DOB NOWMechanical SystemsPermit IssuedCOMPUTER COOL/ICE AGE06/02/2022
DOB NOWStructuralPermit IssuedN.Y.FENCE-A-LOT, INC02/26/2022
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC02/10/2022
DOB NOWBoiler EquipmentSigned-offNEW YORK HEATING CORP02/02/2022
DOB NOWPlumbingSigned-offUNITED PLBG MECHANICAL IN01/28/2022
DOB NOWMechanical SystemsPermit IssuedCOMPUTER COOL/ICE AGE01/24/2022
DOB NOWStructuralPermit IssuedN.Y.FENCE-A-LOT, INC01/04/2022
DOB NOWMechanical SystemsSigned-offNYC HEAT SOLUTION INC09/24/2021
+ 53 more permits on file
▾Field Inspections (DOB CAP) — 29
DateTypeResultReport
06/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/26/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/21/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/17/2024Fail-Final General Construction Non-Directive 14FailView ↗
11/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/17/2023Fail-Final CND-Occupancy InspectionFailView ↗
06/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/02/2023Pass-Final PL - UndergroundPassView ↗
03/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/08/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/27/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
Latest 25 of 29.
▾Special Inspection Requirements (DOB NOW) — 113
DateRequirementInspectorRole
07/22/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
07/22/2026Post-installed AnchorsMAXIM KORNGOLDspecial
07/06/2026Post-installed AnchorsMAXIM KORNGOLDspecial
07/06/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
06/22/2026Sprayed fire-resistant materialsShahrish Shuvospecial
06/03/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
06/03/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
06/03/2026Post-installed AnchorsShahrish Shuvospecial
06/03/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Shahrish Shuvospecial
03/24/2026FinalShahrish Shuvoprogress
02/23/2026FinalMAXIM KORNGOLDprogress
02/23/2026Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
02/23/2026Post-installed AnchorsMAXIM KORNGOLDspecial
02/23/2026Concrete - Cast-In-PlaceMAXIM KORNGOLDspecial
01/13/2026Concrete - Cast-In-PlaceMAXIM KORNGOLDspecial
01/13/2026Post-installed AnchorsMAXIM KORNGOLDspecial
01/13/2026Structural Stability – Alterations of existing buildingsMAXIM KORNGOLDspecial
01/13/2026Post-installed AnchorsMAXIM KORNGOLDspecial
01/13/2026Heating SystemsMAXIM KORNGOLDspecial
01/13/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
01/13/2026FinalMAXIM KORNGOLDprogress
11/21/2025FinalMAXIM KORNGOLDprogress
11/21/2025Post-installed AnchorsMAXIM KORNGOLDspecial
11/21/2025Mechanical SystemsMAXIM KORNGOLDspecial
11/21/2025Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
Latest 25 of 113.
▾Documents — 2,880 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch47
09/01/2026B00480587-I1Request digital key ↗
08/31/2026B00628300-I1Request digital key ↗
08/31/2026B00628282-P1Request digital key ↗
Showing 3 of 47 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/02/2026B00188307-I1Request digital key ↗
09/01/2026B00473282-I1Request digital key ↗
09/01/2026B00473282-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/02/2026B00307762-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits516
▸BISPLAN / WORK APPROVAL APPLICATION283
06/18/2025300424912Open ↗
06/12/2025300424912Open ↗
06/05/2025300424912Open ↗
Showing 3 of 283 on file for this type
▸BISWORK PERMIT APPLICATION218
10/16/2020340704580Open ↗
08/22/2019321969802Open ↗
06/04/2019321830550Open ↗
Showing 3 of 218 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION15
01/23/2020321442248Open ↗
08/06/2019321692263Open ↗
Showing 2 of 15 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/17/2021300424912Open ↗
▸Seals & Professional Certifications580
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION315
07/12/2019321658461Open ↗
07/12/2019321658461Open ↗
06/25/2019321969802Open ↗
Showing 3 of 315 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature53
09/01/2026B00473282-P2Open ↗
09/01/2026B00473282-P1Open ↗
09/01/2026B00473282-I1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature50
09/23/2026B01243012-I1Open ↗
09/23/2026B00628300-I1Open ↗
09/19/2026B00787958-P1Open ↗
Showing 3 of 50 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST48
06/25/2019321969802Open ↗
Showing 1 of 48 on file for this type
▸DOB NOWProgress Inspector Seal & Signature40
09/23/2026B01243012-I1Open ↗
09/23/2026B01243012-I1Open ↗
09/23/2026B01243012-I1Open ↗
Showing 3 of 40 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISPC FULL REPORT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment423
▸BISSELF-CERT PLUMBING NOTICE128
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 128 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT98
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 98 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE90
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 90 on file for this type
▸BISSCHEDULE B - PLUMBING50
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 50 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISEQUIPMENT USE PERMITS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA10
12/31/2019321071530Open ↗
03/05/2019321802279Open ↗
11/21/2018321647401Open ↗
Showing 3 of 10 on file for this type
▸BISSPRINKLER INSP REPORT : FP-859
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-842
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWStreet Tree Checklist3
08/27/2026B00787958-P2Open ↗
Showing 1 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos129
▸BISASBESTOS: CERTIFICATION (DEP ACP5)46
11/27/2019340704580Open ↗
06/25/2019321969802Open ↗
04/02/2019321830550Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report43
09/01/2026B00480587-I1Open ↗
08/31/2026B00460005-I1Open ↗
08/31/2026B00628300-I1Open ↗
Showing 3 of 43 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance233
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS149
06/25/2019321969802Open ↗
04/02/2019321830550Open ↗
03/25/2019321799782Open ↗
Showing 3 of 149 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS48
09/24/2020321691086Open ↗
03/25/2019321799782Open ↗
01/09/2019321644066Open ↗
Showing 3 of 48 on file for this type
▸BISTR8: Energy Code Progress Inspections17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
09/24/2020321691086Open ↗
11/27/2019340704580Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/01/2026B00473282-I1Open ↗
Showing 1 of 3 on file for this type
▸Inspections & Test Reports57
▸BISTECHNICAL REPORT: RESPONSIBILITY30
03/28/2025321692263Open ↗
06/23/2021300424912Open ↗
06/23/2021300424912Open ↗
Showing 3 of 30 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION3
10/29/2020300197775Open ↗
10/29/2020300235298Open ↗
05/07/2020320242340Open ↗
▸Approvals, Objections & Sign-offs303
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST120
01/20/2022321691086Open ↗
04/23/2021320751726Open ↗
02/26/2021300424912Open ↗
Showing 3 of 120 on file for this type
▸BISADMINISTRATIVE OBJECTIONS75
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 75 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION41
06/03/2025300424912Open ↗
09/24/2020340704580Open ↗
09/24/2020340704580Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter40
08/31/2026B00628300-I1Open ↗
08/31/2026B00628282-P1Open ↗
08/31/2026B00628282-I1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)10
08/31/2026B00628300-I1Open ↗
08/28/2026B08032216-I1Open ↗
Showing 2 of 10 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)6
08/31/2026B00628300-I1Open ↗
08/28/2026B08032216-I1Open ↗
Showing 2 of 6 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLANDMARKS APPROVAL3
07/26/2019321692263Open ↗
Showing 1 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
06/18/2025300424912Open ↗
06/12/2025300424912Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
01/17/2020340704580Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership231
▸BISCOST AFFIDAVIT230
10/21/2020321130646Open ↗
10/21/2020302046587Open ↗
10/21/2020321658461Open ↗
Showing 3 of 230 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/23/2021320751726Open ↗
▸Filing & Intake Forms300
▸BISEFILING COVER SHEET134
06/26/2019321969802Open ↗
04/02/2019321830550Open ↗
10/31/2018321071530Open ↗
Showing 3 of 134 on file for this type
▸BISADDITIONAL INFORMATION119
08/28/2025300424912Open ↗
01/20/2022321691086Open ↗
06/22/2021321691086Open ↗
Showing 3 of 119 on file for this type
▸BISBOROUGH INTAKE FORM39
01/19/2021320455716Open ↗
04/09/2020300344018Open ↗
04/07/2020320455716Open ↗
Showing 3 of 39 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
11/26/2019340704580Open ↗
Showing 1 of 8 on file for this type
▸Other Documents33
▸BISINTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸DOB NOWProof of Historic Building8
08/18/2026B01322975-P2Open ↗
08/18/2026B01322975-P1Open ↗
Showing 2 of 8 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
06/16/2021321830550Open ↗
06/11/2021321830550Open ↗
04/29/2020320242340Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISECCCNYS Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type