—Year Built
—Stories
—Building Class
R6AZoning
—Gross Floor Area
—Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only ▸
8,657 sf lot · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPrimary Extension ClinicUnder Construction82p · 10 filings · 20 docs
BulkheadPlumbing work for underground, cellar, and floors 1-41p · 1 filing · 12 docs
Floor 4Plumbing work for underground, cellar, and floors 1-477p · 4 filings · 20 docs
Floor 3Plumbing work for underground, cellar, and floors 1-476p · 4 filings · 20 docs
Floor 2Plumbing work for underground, cellar, and floors 1-477p · 4 filings · 20 docs
Floor 1Primary Extension ClinicUnder Construction109p · 11 filings · 20 docs
CellarPrimary Extension ClinicUnder Construction46p · 7 filings · 20 docs
Sub-CellarPlumbing work for underground, cellar, and floors 1-443p · 4 filings · 20 docs
Site & exteriorYagudayev Architecture Studio P.C.38p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VP Capital Holdings2003/21/2026
RB Realty Capital1810/21/2026
Santi Services309/13/2026
Tolmas103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/10/2018$6.5M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yagudayev Architecture Studio P3403/21/2026
Patuxent Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QBH ConstructionScaffold504/09/2026
QBH ConstructionGeneral Contractor407/02/2026
Classic Consulting GroupScaffold407/08/2026
Safety Fire SprinklerFire Protection207/08/2026
Fqe ElectricElectrical203/22/2026
New York Fast General ConScaffold204/09/2026
Mpi PlumbingPlumbing207/08/2026
First Quality ElectricalElectrical203/22/2026
Empire PlumbingPlumbing108/25/2026
B Sosa EnterprisesScaffold104/09/2026
Rite Way HeatingPlumbing107/08/2026
Cavalry GC&PGeneral Contractor107/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chun Engineering Consulta9605408/17/2026
20/20 Inspections14711512/23/2025
Building Lifecycle
All (200)Filed (35)Permit Issued (24)Signed Off (9)Violation (28)Inspection (14)Objection (60)Special Inspection (30)
10/20/2026
Filed — Alteration
subsequent filing for structural work, steel supports for new pool/spas and openings for cellar tenant (spa)
Q01353843-P1
10/14/2026
Filed — Alteration
Q01472584-S1
10/14/2026
Filed — Alteration
Q01472584-S2
10/14/2026
Filed — Alteration
Q01472584-I1
08/24/2026
Permit issued — Plumbing
Q01425012-I1-PL
08/17/2026
Filed — Alteration
Mechanical work to be done at the subject premises.
Q01424111-P1
08/17/2026
Special inspection requirement — Final
Cloud Lee
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
08/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
08/17/2026
Special inspection requirement — Interior lighting power
JAMES CHUN
08/17/2026
Special inspection requirement — Lighting controls
JAMES CHUN
08/13/2026
Special inspection requirement — Final
Cloud Lee
08/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
08/13/2026
Special inspection requirement — Interior lighting power
JAMES CHUN
08/13/2026
Special inspection requirement — Lighting controls
JAMES CHUN
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
08/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
07/29/2026
Permit issued — General Construction
Q01424111-I1-GC
07/23/2026
Filed — Alteration
Mechanical work to be done at the subject premises.
Q01424111-S2
07/23/2026
Filed — Alteration
Application is filed for sprinkler, plumbing & standpipe work at the subject premises.
Q01425012-I1
07/23/2026
Filed — Alteration
Mechanical work to be done at the subject premises.
Q01424111-I1
07/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES CHUN
07/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES CHUN
07/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
JAMES CHUN
07/01/2026
Special inspection requirement — Sprinkler Systems
JAMES CHUN
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
07/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES CHUN
07/01/2026
Special inspection requirement — Standpipe Systems
JAMES CHUN
07/01/2026
Special inspection requirement — Post-installed Anchors
JAMES CHUN
07/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
JAMES CHUN
06/30/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
06/30/2026
Special inspection requirement — Lighting controls
JAMES CHUN
06/30/2026
Special inspection requirement — Interior lighting power
JAMES CHUN
06/30/2026
Special inspection requirement — Post-installed Anchors
JAMES CHUN
06/30/2026
Special inspection requirement — Electrical motors and elevators
JAMES CHUN
06/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES CHUN
06/23/2026
Violation issued (ECB, open)
Construction
06/23/2026
Violation issued (ECB, open)
Construction
06/23/2026
Objection raised — Other
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Resolved
06/11/2026
Objection raised — Mechanical
06/11/2026
Objection raised — Other
06/11/2026
Objection raised — Scope
06/11/2026
Objection raised — Scope
06/11/2026
Objection raised — Structural
06/11/2026
Objection raised — Structural
05/26/2026
Objection resolved — Resolved
05/22/2026
Objection raised — Cost
04/30/2026
Objection resolved — Addressed
04/30/2026
Objection resolved — Addressed
04/30/2026
Objection resolved — Addressed
04/30/2026
Objection resolved — Addressed
04/24/2026
Objection raised — Admin
04/24/2026
Objection raised — Admin
04/23/2026
Objection raised — Fire_Protection
Latest 60 of 200 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedEmpire Plumbing08/24/2026
DOB NOWGeneral ConstructionPermit IssuedCavalry GC&P07/29/2026
DOB NOWGeneral ConstructionPermit IssuedQBH Construction03/13/2026
DOB NOWMechanical SystemsPermit IssuedQBH Construction03/13/2026
DOB NOWPlumbingSigned-offLS Plumbing03/13/2026
DOB NOWBoiler EquipmentSigned-offAmerican Boiler & Welding04/04/2025
DOB NOWBoiler EquipmentSigned-offAmerican Boiler & Welding03/31/2025
DOB NOWCurb CutSigned-offQBH Construction11/14/2024
DOB NOWPlumbingSigned-offYG Services11/13/2024
DOB NOWConstruction FenceSigned-offQBH Construction06/06/2024
DOB NOWStandpipeSigned-offSafety Fire Sprinkler05/02/2024
DOB NOWSprinklersSigned-offSafety Fire Sprinkler05/02/2024
DOB NOWProtection and Mechanical MethodsSigned-offClassic Consulting Group12/14/2023
DOB NOWSupported ScaffoldSigned-offClassic Consulting Group11/29/2023
DOB NOWSidewalk ShedSigned-offClassic Consulting Group10/24/2023
DOB NOWMechanical SystemsPermit IssuedQBH Construction09/22/2023
DOB NOWPlumbingSigned-offYG Services09/22/2023
DOB NOWConstruction FenceSigned-offQBH Construction07/07/2023
DOB NOWConstruction FenceSigned-offQBH Construction06/22/2023
DOB NOWConstruction FenceSigned-offQBH Construction06/15/2022
DOB NOWConstruction FenceSigned-offQBH Construction04/20/2021
DOB NOWConstruction FenceSigned-offB Sosa Enterprises06/03/2020
DOB NOWConstruction FenceSigned-offOscar Velasquez06/05/2019
DOB NOWConstruction FenceSigned-offOscar Velasquez02/22/2019
BISPLISSUEDMpi Plumbing03/14/2025
BIS—ISSUEDQBH Construction06/06/2024
BIS—ISSUEDQBH Construction06/13/2023
BIS—ISSUEDQBH Construction09/13/2022
BISPLISSUEDBest Mechanical Services08/19/2022
BIS—ISSUEDQBH Construction10/21/2021
BISPLISSUEDBest Mechanical Services08/04/2021
BIS—ISSUEDQBH Construction07/27/2021
BIS—RE-ISSUEDNew York Fast General Con09/29/2020
BIS—ISSUEDNew York Fast General Con06/09/2020
BIS—ISSUEDNew York Fast General Con06/04/2019
BIS—ISSUEDNew York Fast General Con03/15/2019
BISOTISSUEDUnited Kitchen & Ventilat09/05/2013
BISMHISSUEDUnited Kitchen Systems07/30/2013
BISFPISSUEDNY Fire11/23/2011
BISFPISSUEDFire Zone Vent & Supp11/19/2010
+ 22 more permits on file
4 projects · most recent 10/20/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems Generators
FiledStatusContractorScopeMake / Model / Capacity
10/20/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Samsung AM240HCVGFS/AA 240,000 BTU · Vrf Outdoor ×2
Ventilation
Iec DBYE12 893 CFM ×1
08/17/2026Permit IssuedCavalry GC&PAir Conditioning Systems
Cooling
Toshiba MUP0961FT9P-UL 96,000 BTU · Vrf Outdoor ×1
MUP1201FT9P-UL 120,000 BTU · Vrf Outdoor ×1
Toshiba Carrier 96,000 BTU · Condensing Unit ×1
12/23/2025Permit IssuedQBH ConstructionHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM2 60,000 BTU · Condensing Unit ×1
10/16/2025Permit IssuedQBH ConstructionGenerators, Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAM 36,000 BTU · Condensing Unit ×162
MXZ-SM36NAM2 36,000 BTU · Condensing Unit ×99
PUZ-A24NHA7 24,000 BTU · Condensing Unit ×12
MUY-GL12NA 12,000 BTU · Condensing Unit ×3
MUZ-GS12NA 12,000 BTU · Condensing Unit ×3
Aaon RN-010-8-0-K60E-15A 2,530 CFM · Rooftop Unit ×3
Generators
Kohler KOHLER 250RE0ZJE 250 kW · Generator ×3
2 projects · most recent 10/20/2026
Sprinkler System
FiledStatusContractorScope
10/20/2026——Sprinkler System
07/23/2026——213 heads, 1 outlets
2 projects · most recent 10/20/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/20/2026——Gas, Water/Sanitary
07/23/2026Permit IssuedPiping & Plumbing SolutioWater/Sanitary
14 projects · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedAccurate ElectricalGeneral Wiring
07/27/2026CompleteFirst Quality Electrical84 meters, 84 new_meters
06/23/2025CompleteFirst Quality Electrical1 meters, 1 new_meters
03/27/2025Permit IssuedDenali Electric—
07/12/2024CancelledFqe Electric84 meters, 84 new_meters
07/12/2024CompleteFqe ElectricGeneral Wiring
07/12/2024CompleteFqe Electric1 meters, 1 new_meters
04/16/2024CancelledFirst Quality Electrical1 meters, 1 new_meters
04/16/2024CancelledFirst Quality ElectricalGeneral Wiring
03/04/2024Permit IssuedStar Electrical Contractors—
01/09/2024CancelledFqe Electric1 meters, 1 new_meters
01/09/2024CancelledFqe ElectricGeneral Wiring
01/09/2024CancelledFqe Electric84 meters, 84 new_meters
10/24/2023CompleteRichard Neu—
2 projects · most recent 10/20/2026
Steel Concrete
FiledStatusContractorScope
10/20/2026——Steel, Concrete
12/23/2025Permit IssuedQBH Construction1 scope_items
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2025Pass-Final Boiler Equipment InspectionPassView ↗
04/08/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/02/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/10/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/10/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/06/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/18/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/18/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 134
DateRequirementInspectorRole
08/17/2026Lighting controlsJAMES CHUNenergy_progress
08/17/2026Interior lighting powerJAMES CHUNenergy_progress
08/17/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
08/17/2026Tenant Protection Plan Compliance—special
08/17/2026Energy Code Compliance InspectionsJAMES CHUNprogress
08/17/2026Fire-Resistance Rated ConstructionJAMES CHUNprogress
08/17/2026FinalCloud Leeprogress
08/13/2026Tenant Protection Plan Compliance—special
08/13/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
08/13/2026Energy Code Compliance InspectionsJAMES CHUNprogress
08/13/2026FinalCloud Leeprogress
08/13/2026Fire-Resistance Rated ConstructionJAMES CHUNprogress
08/13/2026Interior lighting powerJAMES CHUNenergy_progress
08/13/2026Lighting controlsJAMES CHUNenergy_progress
07/01/2026Sprinkler SystemsJAMES CHUNspecial
07/01/2026Standpipe SystemsJAMES CHUNspecial
07/01/2026Tenant Protection Plan ComplianceJAMES CHUNspecial
07/01/2026Energy Code Compliance InspectionsJAMES CHUNprogress
07/01/2026HVAC-R and service water piping design and insulationJAMES CHUNenergy_progress
07/01/2026HVAC-R and service water heating equipmentJAMES CHUNenergy_progress
07/01/2026HVAC-R and service water heating system controlsJAMES CHUNenergy_progress
07/01/2026Tenant Protection Plan ComplianceJAMES CHUNspecial
07/01/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
07/01/2026Post-installed AnchorsJAMES CHUNspecial
06/30/2026Post-installed AnchorsJAMES CHUNspecial
Latest 25 of 134.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Primary Extension ClinicMedical / HealthcareSub-cellar, Floor 1
Project Q01424111 Alteration · Permit Entire · 07/23/2026
Project Q01425012 Alteration · Permit Issued · 07/23/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 499 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch34
10/15/2026Q01472584-S2Request digital key ↗
10/15/2026Q01472584-S1Request digital key ↗
10/15/2026Q01472584-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/28/2026Q00077178-I1Request digital key ↗
08/15/2026Q00077178-P1Request digital key ↗
▸Applications & Permits96
▸BISPLAN / WORK APPROVAL APPLICATION80
09/18/2025420664463Open ↗
09/15/2025420664463Open ↗
08/14/2025420664463Open ↗
Showing 3 of 80 on file for this type
▸BISWORK PERMIT APPLICATION13
05/13/2025420664463Open ↗
09/30/2021420664463Open ↗
09/13/2021420664463Open ↗
Showing 3 of 13 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
12/15/2023440521106Open ↗
11/27/2023440521106Open ↗
05/26/2021440521106Open ↗
▸Zoning, Tax Lot & Property Records15
▸BISZONING DIAGRAM6
12/16/2024420664463Open ↗
01/18/2023420664463Open ↗
10/27/2022420664463Open ↗
Showing 3 of 6 on file for this type
▸BISZONING RESOLUTION DETERMINATION4
08/02/2021440521106Open ↗
05/13/2021420664463Open ↗
04/19/2021420664463Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
12/12/2024420664463Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/12/2024420664463Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications110
▸DOB NOWProgress Inspector Seal & Signature40
09/01/2026Q01424111-S2Open ↗
09/01/2026Q01424111-S2Open ↗
09/01/2026Q01424111-S2Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
10/15/2026Q01472584-I1Open ↗
10/15/2026Q01472584-S1Open ↗
10/15/2026Q01472584-S2Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/01/2026Q01424111-S2Open ↗
09/01/2026Q01424111-S2Open ↗
09/01/2026Q01424111-S2Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING4
04/21/2025420664463Open ↗
04/17/2025420664463Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/06/2025420664463Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
01/06/2025420664463Open ↗
▸Safety & Tenant Protection12
▸BISSTREET TREE CHECKLIST7
01/13/2025440521106Open ↗
01/10/2025440521106Open ↗
12/15/2023440521106Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREES SITE PLAN2
08/02/2021440521106Open ↗
06/09/2021420664463Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/02/2021440521106Open ↗
▸BISSTREET TREE SIGNOFF1
08/08/2025420664463Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00077178-P1Open ↗
▸Environmental & Asbestos22
▸DOB NOWOER: Notice to Proceed10
08/13/2026Q00812859-P2Open ↗
08/13/2026Q00812859-I1Open ↗
08/13/2026Q00925969-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
08/13/2026Q00925969-S1Open ↗
08/13/2026Q00812859-I1Open ↗
08/13/2026Q00812841-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
02/07/2025420664463Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
08/07/2023420664463Open ↗
▸Energy Compliance20
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION6
05/21/2025420664463Open ↗
05/21/2025420664463Open ↗
05/21/2025420664463Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
01/31/2023420664463Open ↗
12/16/2022420664463Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00812859-I1Open ↗
08/13/2026Q00812841-I1Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/21/2025420664463Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/20/2025420664463Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/02/2025420664463Open ↗
▸BISLIGHTING CONTROLS1
03/20/2025420664463Open ↗
▸Inspections & Test Reports30
▸BISTECHNICAL REPORT: RESPONSIBILITY16
01/31/2023420664463Open ↗
12/16/2022420664463Open ↗
Showing 2 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
05/12/2021420664463Open ↗
05/12/2021420664463Open ↗
05/12/2021420664463Open ↗
Showing 3 of 6 on file for this type
▸BISCONCRETE - CAST-IN-PLACE2
02/20/2025420664463Open ↗
02/19/2025420664463Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPOST-INSTALLED ANCHORS1
04/02/2025420664463Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
03/12/2025420664463Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
02/20/2025420664463Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs47
▸BISSCHEDULE A - OCCUPANCY / USE26
09/18/2025420664463Open ↗
09/15/2025420664463Open ↗
08/14/2025420664463Open ↗
Showing 3 of 26 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
04/18/2025421841582Open ↗
11/01/2024421841582Open ↗
11/01/2024421841582Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSUPERSEDING LETTER2
05/13/2025420664463Open ↗
Showing 1 of 2 on file for this type
▸BISDOT APPROVAL FOR THE RELOCATION OF THE TRAFFIC SIGN ALONG THE 77 ROAD1
10/05/2021420664463Open ↗
▸Cost, Insurance & Ownership11
▸BISPROJECT-SPECIFIC GL INSURANCE6
10/21/2021420664463Open ↗
09/13/2021420664463Open ↗
Showing 2 of 6 on file for this type
▸BISCOST AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
10/21/2021420664463Open ↗
▸Filing & Intake Forms50
▸BISADDITIONAL INFORMATION35
04/29/2025420664463Open ↗
01/13/2025440521106Open ↗
01/13/2025440521106Open ↗
Showing 3 of 35 on file for this type
▸BISEFILING COVER SHEET10
04/18/2025421841582Open ↗
Showing 1 of 10 on file for this type
▸BISBOROUGH INTAKE FORM5
04/18/2025421841582Open ↗
09/30/2021420664463Open ↗
09/13/2021420664463Open ↗
Showing 3 of 5 on file for this type
▸Other Documents13
▸BISBPP - SUPPORTING DOCUMENTATION4
01/10/2025440521106Open ↗
01/10/2025440521106Open ↗
11/27/2023440521106Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM3
01/31/2023420664463Open ↗
04/19/2021420664463Open ↗
Showing 2 of 3 on file for this type
▸BISVESTIBULES1
03/21/2025420664463Open ↗
▸BISMAINTENANCE INFORMATION1
04/23/2025420664463Open ↗
▸BISECC REVIEW RESOLUTION REQUIRED OF DOB NOW MS BE FILING1
12/17/2024420664463Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
04/23/2025420664463Open ↗
▸BISSP/SD WORK TYPE SHALL BE FILED WITH DOBNOW1
12/17/2024420664463Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
02/20/2025420664463Open ↗