← Back
Two family converted from one family
141-19 BOOTH MEMORIAL AVE
QUEENS · BIN 4116659
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R3XZoning
2,544 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · Owner of record: CHANG DA LLC · 4,117 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 28p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/25/2021$1.2M—— → —$462/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.801/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DAVID CONSTRUCTING NY, INGeneral Contractor1607/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing207/08/2026
L&L CONSTRUCTION DEVELOPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129601/26/2023
Building Lifecycle
All (65)Filed (8)Permit Issued (11)Signed Off (3)Violation (3)Inspection (8)Objection (2)Special Inspection (30)
01/29/2023
Special inspection requirement — Final
MEHDI GHAZI
01/29/2023
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
01/29/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
01/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
01/29/2023
Special inspection requirement — Air barrier — testing
MEHDI GHAZI
01/29/2023
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
01/29/2023
Special inspection requirement — Heating Systems
MEHDI GHAZI
01/29/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
01/29/2023
Special inspection requirement — Structural Steel - High Strength Bolting
MEHDI GHAZI
01/29/2023
Special inspection requirement — Chimneys and vents
MEHDI GHAZI
01/29/2023
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
01/29/2023
Special inspection requirement — Fenestration areas
MEHDI GHAZI
01/29/2023
Special inspection requirement — Metering
MEHDI GHAZI
01/29/2023
Special inspection requirement — Electric vehicle service equipment requirements
MEHDI GHAZI
01/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
01/29/2023
Special inspection requirement — Masonry
MEHDI GHAZI
01/29/2023
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
01/29/2023
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
01/29/2023
Special inspection requirement — Structural Steel - Welding
MEHDI GHAZI
01/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
01/29/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
01/29/2023
Special inspection requirement — Structural Steel - Details
MEHDI GHAZI
01/29/2023
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
01/29/2023
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
01/29/2023
Special inspection requirement — Permanent certificate
MEHDI GHAZI
01/29/2023
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
01/29/2023
Special inspection requirement — Maintenance information
MEHDI GHAZI
01/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
01/29/2023
Special inspection requirement — Duct leakage testing, insulation and design
MEHDI GHAZI
01/29/2023
Special inspection requirement — Interior lighting power
MEHDI GHAZI
01/26/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ENLARGEMENT FOR CONVERSION FROM ONE- TO TWO-FAMILY DETACHED RESIDENCE. OBTAIN NEW C.O.
Q00491492-P2
12/06/2022
Signed off — Alteration
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00704619-I1
12/05/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/22/2022
Signed off — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00491572-I1
11/15/2022
Permit issued — Curb Cut
Q00704619-I1-CC
11/14/2022
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00456134-I1
11/14/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/10/2022
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00491572-P2
10/26/2022
Objection resolved — Addressed
10/25/2022
Objection raised — Scope
10/24/2022
Permit issued — Plumbing
Q00491572-I1-PL
10/21/2022
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00491572-P1
10/20/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ENLARGEMENT FOR CONVERSION FROM ONE- TO TWO-FAMILY DETACHED RESIDENCE. OBTAIN NEW C.O.
Q00491492-P1
08/30/2022
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
08/23/2022
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/19/2022
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/10/2022
Permit issued — Construction Fence
Q00456134-I1-FN
08/10/2022
Permit issued — Foundation
Q00491492-I1-GC
04/20/2022
Filed — Alteration
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00704619-I1
04/01/2022
Violation issued (ECB, closed)
Construction
02/11/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/04/2022
Violation issued (ECB, closed)
Construction
02/04/2022
Violation issued (ECB, closed)
Construction
02/02/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/26/2022
Permit issued — Plumbing
Q00491572-I1-PL
08/24/2021
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00491572-I1
08/09/2021
Permit issued — Structural
Q00491492-I1-GC
08/09/2021
Permit issued — General Construction
Q00491492-I1-ST
08/09/2021
Permit issued — Foundation
Q00491492-I1-MS
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offL&L CONSTRUCTION DEVELOP11/15/2022
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG10/24/2022
DOB NOWConstruction FenceSigned-offDAVID CONSTRUCTING NY, IN08/10/2022
DOB NOWFoundationPermit IssuedDAVID CONSTRUCTING NY, IN08/10/2022
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG01/26/2022
DOB NOWStructuralPermit IssuedDAVID CONSTRUCTING NY, IN08/09/2021
DOB NOWGeneral ConstructionSigned-offDAVID CONSTRUCTING NY, IN08/09/2021
DOB NOWFoundationSigned-offDAVID CONSTRUCTING NY, IN08/09/2021
DOB NOWMechanical SystemsSigned-offDAVID CONSTRUCTING NY, IN08/09/2021
DOB NOWFoundationSigned-offDAVID CONSTRUCTING NY, IN08/09/2021
DOB NOWConstruction FenceSigned-offDAVID CONSTRUCTING NY, IN08/03/2021
1 project · most recent 01/26/2023
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/26/2023Permit IssuedDAVID CONSTRUCTING NY, INHeating Systems, Ventilation Systems
Heating
Navien NCB-240/130H 120,000 BTU · Boiler ×4
Ventilation
Delta Breeze SLM 50 50 CFM · Exhaust Fan ×14
1 project · most recent 08/19/2021
General Wiring
FiledStatusContractorScope
08/19/2021CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 project · most recent 01/26/2023
Steel Wood
FiledStatusContractorScope
01/26/2023Permit IssuedDAVID CONSTRUCTING NY, INSteel, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/05/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
11/14/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/30/2022Pass-Final SD - Fire PumpPassView ↗
08/23/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/19/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/11/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/02/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/02/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 116
DateRequirementInspectorRole
01/29/2023Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
01/29/2023HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
01/29/2023HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
01/29/2023Fenestration air leakageMEHDI GHAZIenergy_progress
01/29/2023Interior lighting powerMEHDI GHAZIenergy_progress
01/29/2023Ventilation and air distribution systemMEHDI GHAZIenergy_progress
01/29/2023Insulation placement and R valuesMEHDI GHAZIenergy_progress
01/29/2023Electric vehicle service equipment requirementsMEHDI GHAZIenergy_progress
01/29/2023Duct leakage testing, insulation and designMEHDI GHAZIenergy_progress
01/29/2023MeteringMEHDI GHAZIenergy_progress
01/29/2023HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
01/29/2023Maintenance informationMEHDI GHAZIenergy_progress
01/29/2023Air barrier — testing MEHDI GHAZIenergy_progress
01/29/2023Fenestration areasMEHDI GHAZIenergy_progress
01/29/2023Air barrier - visual inspectionMEHDI GHAZIenergy_progress
01/29/2023Permanent certificateMEHDI GHAZIenergy_progress
01/29/2023Structural Wood FrameMEHDI GHAZIprogress
01/29/2023Footing and FoundationMEHDI GHAZIprogress
01/29/2023Energy Code Compliance InspectionsMEHDI GHAZIprogress
01/29/2023FinalMEHDI GHAZIprogress
01/29/2023Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
01/29/2023Chimneys and ventsMEHDI GHAZIspecial
01/29/2023Structural Steel - DetailsMEHDI GHAZIspecial
01/29/2023Excavations - Sheeting, Shoring, and BracingMEHDI GHAZIspecial
01/29/2023Structural Steel - High Strength BoltingMEHDI GHAZIspecial
Latest 25 of 116.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/27/2026Q00491572-P2Request digital key ↗
08/27/2026Q00491572-P1Request digital key ↗
08/27/2026Q00491572-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00456134-I1Request digital key ↗
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation2
07/06/2022440673674Open ↗
05/19/2021440673674Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/22/2022440673674Open ↗
05/19/2021440673674Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/25/2026Q00491492-I1Open ↗
08/15/2026Q00491492-P1Open ↗
08/13/2026Q00491492-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00491492-I1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature11
09/28/2026Q00491572-P1Open ↗
09/28/2026Q00491572-P1Open ↗
09/01/2026Q00491492-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/28/2026Q00491572-P1Open ↗
09/01/2026Q00491492-P2Open ↗
09/01/2026Q00491492-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00456134-I1Open ↗
08/27/2026Q00491572-P2Open ↗
08/27/2026Q00491572-P1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/06/2021440673674Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/19/2021440673674Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/25/2026Q00491492-I1Open ↗
08/15/2026Q00491492-P1Open ↗
08/13/2026Q00491492-P2Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST1
05/19/2021440673674Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00491492-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00491492-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00491492-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00491572-I1Open ↗
08/27/2026Q00491572-P2Open ↗
08/25/2026Q00491492-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/27/2026Q00491572-I1Open ↗
08/13/2026Q00491492-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/25/2026Q00491492-I1Open ↗
08/15/2026Q00491492-P1Open ↗
08/13/2026Q00491492-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00491492-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00491492-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/06/2021440673674Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/04/2022440673674Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
07/06/2022440673674Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/06/2021440673674Open ↗
▸Other Documents10
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/25/2026Q00491492-I1Open ↗
08/15/2026Q00491492-P1Open ↗
08/13/2026Q00491492-P2Open ↗
▸DOB NOWSite Survey: Initial3
08/25/2026Q00491492-I1Open ↗
08/13/2026Q00491492-P1Open ↗
08/13/2026Q00491492-P2Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
05/16/2022440673674Open ↗
05/06/2021440673674Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00491492-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00491492-I1Open ↗