← Back
BuildNYC
Primarily 2 family with 1 store or office
141-26 ROCKAWAY BOULEVARD
QUEENS · BIN 4261774
💬 Discuss this project
1925Year Built
2Stories
S2Building Class
R5DZoning
2,420 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · 1,905 sf lot · 1.27 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Legalize storefront replacement and partition removal, 2nd f1 filing · 3 docs
Floor 1Caribbean Food Hut2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RCL Enterprises203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/06/2020$893K—— → —$369/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arquitectura Varela102/10/2022
KDV Designs Architects208/27/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TBC & Associates403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Butterfield & O'Connor4189102/10/2022
SY Engineering5149208/27/2021
Building Lifecycle
All (22)Filed (3)Violation (9)Special Inspection (10)
02/10/2022
Filed — Alteration
HEREWITH FILING TO LEGALIZE WORK WITHOUT A PERMIT RELATED TO THE FOLLOWING VIOLATIONS;-34077111J TO REPLACE STOREFRONT AND REMOVE FULL HEIGHT PARTITION WALLS @ 2ND FLOOR AS PER PLANS.
Q00648801-I1
02/10/2022
Special inspection requirement — Final
Vicente Varela
12/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN T. O'CONNOR
08/27/2021
Filed — Alteration
INSTALLING NEW BAR COUNTERTOP, NEW FRAMING FOR RESTROOMS, NEW INTERIOR FINISHES, NEW S/S HOOD WITH EXHAUST DUCT AND FAN AT EXISTING VACANT UG-6 STORE TO CREATE NEW RESTAURANT. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00582878-I1
08/25/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
08/25/2021
Special inspection requirement — Final
DAVIDSON CHRISTMAS
08/25/2021
Special inspection requirement — Energy Code Compliance Inspections
DAVIDSON CHRISTMAS
08/25/2021
Special inspection requirement — Maintenance information
SUNGBOM YI
08/25/2021
Special inspection requirement — Electrical motors and elevators
SUNGBOM YI
08/25/2021
Special inspection requirement — Duct leakage testing, insulation and design
SUNGBOM YI
08/25/2021
Special inspection requirement — Mechanical Systems
SUNGBOM YI
08/24/2021
Filed — Alteration
INSTALLING NEW COMMERCIAL COOKING EQUIPMENT AND PLUMBING FIXTURES IN EXISTING ( UG-6 ) COMMERCIAL SPACE. NO OTHER WORK TO BE DONE UNDER THIS APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00579282-I1
08/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
12/10/2019
Violation issued (FDNY_NOV, closed)
04/03/2012
Violation issued (HPD, closed)
B
04/03/2012
Violation issued (HPD, closed)
A
11/15/2001
Violation issued (HPD, closed)
C
06/04/1999
Violation issued (ECB, closed)
Construction
01/18/1995
Violation issued (ECB, closed)
Plumbing
09/03/1992
Violation issued (ECB, closed)
Construction
12/15/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/08/1989
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDCapital State Delopment08/20/1998
1 project · most recent 08/27/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/27/2021——Ventilation Systems
Ventilation
Captiveaire MODEL # NCA18HPFA 4,500 CFM · Kitchen Exhaust ×3
1 project · most recent 08/24/2021
Gas Water/Sanitary
FiledStatusContractorScope
08/24/2021——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
02/10/2022FinalVicente Varelaprogress
12/15/2021Fire-Resistant Penetrations and JointsBRIAN T. O'CONNORspecial
08/25/2021Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
08/25/2021FinalDAVIDSON CHRISTMASprogress
08/25/2021Energy Code Compliance InspectionsDAVIDSON CHRISTMASprogress
08/25/2021Maintenance informationSUNGBOM YIenergy_progress
08/25/2021Electrical motors and elevatorsSUNGBOM YIenergy_progress
08/25/2021Duct leakage testing, insulation and designSUNGBOM YIenergy_progress
08/25/2021Mechanical SystemsSUNGBOM YIspecial
08/18/2021Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Caribbean Food HutRestaurant / Food ServiceFloor 1
Project Q00582878 Alteration · Approved · 08/27/2021
Project Q00579282 Alteration · Approved · 08/24/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026Q00579282-I1Request digital key ↗
08/27/2026Q00582878-I1Request digital key ↗
08/26/2026Q00648801-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00648801-I1Open ↗
08/13/2026Q00579282-I1Open ↗
08/13/2026Q00582878-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q00648801-I1Open ↗
08/27/2026Q00582878-I1Open ↗
08/27/2026Q00582878-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00582878-I1Open ↗
08/13/2026Q00579282-I1Open ↗