5 Open Violations 3 unresolved · 2 paperwork only▸
HPD02/14/2015SECTION 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT METAL ENTRANCE DOOR TO BUILDING , 1st STORY
HPD02/14/2015SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 1FL, 1st STORY
HPD12/01/2007SECTION 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT METAL GATE FRONT ENTRANCE TO BUILDING AT PUBLIC HALL, 1st STORY
ECB11/30/2007RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED # OF FAMILIES.DOB RECORDS INDICATE RESIDENCE IS A LEGAL 2 FAMILY.RESIDENCE IS NOW ALTERED FOR OCCUPANCY AS 3 FAMILY.ALT WORK NOTENothing owed — awaiting certificate of correction
ECB11/30/2007WORK W/O A PERMIT.WORK NOTED:AT CELLAR LEVEL INSTALLED WATER & WASTE LINES FOR 3PC BTHRM SINK,TOILET,SHOWER & RESIDENTIAL SINK GAS LINE FOR STOVE AT KITCHEN.REMEDY:OBTAIN PERMIT OR RESTORE TO LEGAL CONDITION.Nothing owed — awaiting certificate of correction
Three families · 2,020 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.